HomeMy WebLinkAboutGeneral Permits (7939)GENERAL PERMIT Previous permit# `
New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC���
Applicant Nam I � ales attached.
�L Project Location: County (� c 2-TCT
Address �� " _ , C, , Street Address/ State Road/ Lot # s
Cam- ()— �x —
City-1K State ZIP �sU
Phone #J �—s�3 Fax # () Subdivision
Authorized Agent " "}') 1 / City �� ZIP
Affected CW ?CEW YPTA F I ES ❑ PTS Phone # ( ) River Basin
1 OEA ❑ HHF C_I IH ❑ UBA ID N/A
AEC(s): Adj. Wtr. Body_ _r' S . ,� at man unkn
❑ PWS: ❑ FC:
Closest Ma Wtr. Bod "
CRW: y s / no PNA yes rio Crit. Hab. yes / no �' y-
Type of Project/ Activity _ T(rr_
Pier (dock) length �j 4 L"
Platform(s)10 tt�
Finger pier(s)
Groin length
number ---- -- --_-- — --
Bulkhead/ Riprap length -
avg distance offshore
max distance offshore
Basin, channel
-
cubic yards
i
Boat ramp --- -- --- jC)
Boathouse/ Boatlift
1
Beach Bulldozing_ !r 1
Other /
Shoreline Length�Y�"
SAV: not sure yes
(Scale: 'fy )
i
Sandbags: not sure yes t
Moratorium:n/a yes 1 `�f/ }64`t
Photos: be
noWaiver Attached: no
A building permit may be required by: ,.� �iC, See note on back regarding River Basin rules.
Notes/ Special Conditions
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit **
Application Fee(s) Check #
IssuiiinnggAa1te (/ iration Oate
Loc— aMann ngjurisdiction Rover File Name
Bank of America Advaistage
RIC ARD B. HENRY
464 CASWELL STATION RD.
KINSTON, NC 28501
Im
BankofAmericam
ACH R/T 053000196 G
Memo' p A-
1:0 S 3000 19 D: 000 68 10 2 ?
{{{ 66-I9/530 NC
Date / U MO
fly
rs
18 Sill P4���'B
2
ADJACEN F RFFARL-�N PROPERTY OWNER STATEN EN—f
(FOR A PIER/MOORING PILINGS/BOATLIFT/BOATHOUSE)
. MAR 2 1 2003
I hereby certify that I own property adjacent to G is
(Name of Property Ohner
property located at �,� SWA
(Lot. Block, Road; etc.)
on ("-eel.),/° -AeIJ ;; A J in I�2d'yx l!!&�02gd , N.C.
(Waterbodv) (Town and/or County)
He has descnbed to me, as sl`lown below, the developmen: he is propos . a- that location,
and, I have no objections to his proposal. I understand tha: a pier; mooning
piiingsr aoatiiftfboathouse must be se: back a minimum distance of Fitee;i fer: from my area
of riparian access unless waived by me.
I nn wish to wai%-e the setback requirement.
I d wish to waive t.at setback requirement.
DESCRIPTION A.N`D/OR DRAWLNiG OF PROPOSED DEVELOP`fENT:
(To be filled in by individual proposing development)
Print or Type Name
Telephone Number
Dste:"
--
ADJACENT RIPARL- .N PROPERTY OWNER STATEN ENT
(FOR A PIER/MOORING PILINGSIBOATZIFTIBOATHOUSE) MAR 2 1 2003
I hereby ce:� fy that I own property adjacent to � C ''')2Ij )� - �%�►/ Is
(Name of Property Owner)
prope. �y located at
(Lot. Block, Road, etc.)
on _ C' -e &C , in C � J,,VX
(Waterbody) (Town and/or County)
He has desc-ioed to me, as s<<own below, the development he is propos -_ 27 that Iocation,
and, I have no objections to his proposal. I undersrand t`lat a p?erimoor-inQ
piiings,boadik/boathouse must be set back a minimum distance of F�Leen f= from my area
of rpa-lan access unless waived by me.
I do nnt wish to wage the setback requirement.
Lo wish to waive tt.at setback recuirement.
--------------------------------------------------
DESCRIPTION AND/OR DRA VVD G OF PROPOSED DEtiELOP SENT:
(To be filled in by individual proposing development)
�, r �y
Signature
Print or Type Name
ZS-Z zZS" ly2,'
Telephone Number
Date:
2003
i
%O
x
SECTION .1200 - GENERAL PERMIT FOR CONSTRUCTION OF PIERS: DOCKS: AND BOAT HOUSES IN
ESTUARINE AND PUBLIC TRUST WATERS
15A NCAC 07H .1201 PURPOSE
This permit will allow the construction of new piers, docks, and boat houses in the estuarine and public trust waters AECs
and construction of new piers and docks within coastal wetlands AECs according to the authority provided in Subchapter
7J .1100 and according to the following guidelines. This permit will not apply to the Ocean Hazard AEC.
History Note: Authority G.S. 113A-107(a): 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984.
15A NCAC 07H .1202 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting
approval for development. The applicant shall provide information on site location, dimensions of the project area, and
his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the
proposed work. Such notice shall instruct adjacent property owners to provide any comments on the
proposed development in writing for consideration by permitting officials to the Division of Coastal
Management within 10 days of receipt of the notice, and, indicate that no response will be interpreted
as no objection. DCM staff shall review all comments and determine, based on their relevance to the
potential impacts of the proposed project, if the proposed project can be approved by a General Permit.
If DCM staff finds that the comments are worthy of more in-depth review, the applicant shall be
notified that he must submit an application for a major development permit.
(c) Approval of individual projects shall be acknowledged in writing by the Division of Coastal Management and the
applicant shall be provided a copy of this Section.
(d) Construction must be completed within 90 days of the approval of the permit or the permit expires.
(e) Any modification or addition to the approved project shall require prior approval from the Division of Coastal
Management.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Antended Eff. August 1, 1998; January 1, 1990.
15A NCAC 07H .1203 • PERMIT FEE
The applicant must pay a permit fee of one hundred dollars ($100.00) by check or money order payable to the
Department.
History Note: Authority G.S. 113A-107; 113A-113(b); 113A-118.1; 113A-119; 113-119.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. August 1, 2000; March 1, 1991.
15A NCAC 07H .1204 GENERAL CONDITIONS
(a) Piers authorized by this general permit shall be for the exclusive use of the land owner, or occupant and shall not
provide either leased or rented docking space or any other commercial services. Piers designed to provide docking space
for more than two boats shall, because of their greater potential for adverse impacts, be reviewed through the major
permitting process and, therefore, are not authorized by this general permit.
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make
periodic inspections at any time deemed necessary in order to be sure that the activity being performed under the
authority of this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no unreasonable interference with navigation or use of
piers, docks and boat houses. the waters by the public by the existence of
50
(d) This permit will not be applicable to proposed construction where the Department believes that the proposed activity
might unnecessarily endanger adjoining properties; significantly affect historic, cultural, scenic, conservation or
recreation values, identified in G.S. 1 13A-102 and G.S. 1 13A-1 13(b)(4), nor that might significantly affect the quality of
the human environment.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements, AEC Guidelines, and local
land use plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. May 1, 1990;
RRC Objection due to ambiguity Eff. Allay 19, 1994;
Amended Eff. August 1, 1998: July 1, 1994.
15A NCAC 07H .1205 SPECIFIC CONDITIONS
(a) Piers, docks, and boat houses may extend or be located up to a maximum of 400 feet from the normal high water line,
or the normal water level, whichever is applicable.
(b) Piers, docks, and boat houses shall not extend beyond the established pier length along the same shoreline for similar
use. This restriction shall not apply to piers 100 feet or less in length unless necessary to avoid unreasonable interference
with navigation or other uses of the waters by the public. The length of piers shall be measured from the waterward edge
of any wetlands that border the water body.
(c) Piers longer than 200 feet shall be permitted only if the proposed length gives access to deeper water at a rate of at
least one foot at each 100 foot increment of pier length longer than 200 feet, or if the additional length is necessary to
span some obstruction to navigation. Measurements to determine pier lengths shall be made from the waterward edge of
anv coastal wetland vegetation which borders the water body.
(d) Piers and docks shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland
substrate as measured from the bottom of the decking.
(e) Any portion of a pier (either fixed or floating) extending from the main structure and six feet or less in width shall be
considered either a "T" or a finger pier.
(f) Any portion of a pier (either fixed or floating) greater than six feet wide shall be considered a platform or deck.
(g) "T"s, finger piers, platforms, and decks of piers on lots with shorelines 100 feet or greater in length shall not exceed a
combined total area of 400 square feet. The combined total area for lots less than 100 feet shall not exceed four square
feet per linear foot of shoreline.
(h) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands.
(i) Boathouses shall not exceed 400 square feet and shall have sides extending no further than one-half the height of the
walls and only covering the top half of the walls. Measurements of square footage shall be taken of the greatest exterior
dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline.
0) Areas enclosed by boat lifts shall not exceed 400 square feet.
(k) Piers, docks, decks, platforms and boat houses shall be single story. They may be roofed but shall not be designed to
allow second story use.
(1) Pier alignments along federally maintained channels must also meet Corps of Engineers regulations for pier
construction pursuant to Section 10 of the Rivers and Harbors Act.
(m) Piers, docks, and boat houses shall in no case extend more than 1/4 the width of a natural water body, human -made
canal or basin. Measurements to determine widths of the water body, human -made canals or basins shall be made from
the waterward edge of any coastal wetland vegetation which borders the water body. The 1/4 length limitation shall not
apply when the proposed pier is located between longer piers within 200 feet of the applicant's property. However, the
proposed pier shall not be longer than the pier head line established by the adjacent piers, nor, longer than 1/3 the width
of the water body. `
(n) Piers, docks and boat houses shall not interfere with the access to any riparian property, and shall have a minimum
setback of 15 feet between any part of the pier and the adjacent property lines extended into the water at the points that
they intersect the shoreline. The minimum setbacks provided in the rule may be waived by the written agreement of the
adjacent riparian owner(s), or when two adjoining riparian owners are co -applicants. Should the adjacent property be sold
before construction of the pier commences, the applicant shall obtain a written agreement with the new owner waiving the
minimum setback and submit it to the Division of Coastal Management prior to initiating any development of the pier,
dock, or boat house. The line of division of areas of riparian access shall be established by drawing a line along the
51
channel or deep water in front of the property, then drawing a line perpendicular to the line of the channel so that it
intersects with the shore at the point the upland property line meets the water's edge. Application of this Rule may be
aided by reference to the approved diagram in Paragraph (q) of this Rule illustrating the rule as applied to various
shoreline configurations. Copies of the diagram may be obtained from the Division of Coastal Management. When
shoreline configuration is such that a perpendicular alignment cannot be achieved, the pier shall be aligned to meet the
intent of this Rule to the maximum extent practicable.
(o) Piers, and mooring facilities shall be designed to provide docking space for no more than two boats.
(p) Applicants for authorization to construct a dock or pier shall provide notice of the permit application to the owner of
any part of a shellfish franchise or lease over which the proposed dock or pier would extend. The applicant shall allow
the lease holder the opportunity to mark a navigation route from the pier to the edge of the lease.
(q) The diagram shown below illustrates the various shoreline configurations.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. December 1, 1991; May 1, 1990; March 1, 1990;
RRC Objection due to ambiguity Eff. March 18, 1993;
Amended Eff. August 1, 1998; April 23, 1993.
52
0-
MONITORING & COMPLETION REPORT
[CAMA Major Development & State Dredge & Fill Permits]
PERMITTEE' S NAME:
LOCATION:
PHONE:
DATE OF INSPECTION b 3
PEIMI' /# 33qr,)
FIELD REP. —1 2�
DATE REPORTEDLY COMPLETE:
1) D the measured dimensions of the development differ from those indicated in the permit and workplat? Pl
NO [circle one].
COMMENT:
2) SEDIMENTATION & EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all
disturbed areas? YES/NO [circle one]
3)
COMMENT:
FUTU RING & ENFORCEMENT ACTION: Is further investigation or enforcement action
needed? O ircle one].