HomeMy WebLinkAbout33189_HOOKER, DALE P_20030228D CAMA / ❑ DREDGE & FILL
GENERAL PERMIT
UNew []Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
Applicant Name �,. �� 1' 1 ( I,,
Address s 41j 1 t I t TJt l,J ,
City V 4,-J State d( ZIP
Phone # ("S?) E- �� %r 5 � # c5z ) >Riq- Ub
Authorized Agent -�o rve
Affected ❑ CW ❑ EW J PTA ❑ ES ❑ PTS
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS: ❑FC:
ORW: yes / no PNA yes / no Crit. Hab. yes / no
Previous permit #
Date previous permit issued
i] Rules attached.
Project Location: County
Street Address/ State Road/ Lot #(s)
Subdivision ? ., l 6, A w aAi . Or
City " •/.,, -1 ZIP 1L S'I
Phone # (_) River Basin 4/� If -c
Adj. Wtr- Body n l� , •. ; r r !� (nat /man /unkn)
7
Closest Maj. Wtr. Body /V
Type of Project/ Activity ex Ir d r1c1 G f. f r �r• l W ��
-j F r -4. Y•.I. (Scale:
Pier (dock) Ian h <"
Platf
Finger
Groi
number
Bulk
.nax distance offshore_
Basin, channel
cubic yards
Boat
Boat
=M
Beac Bulldozing
Othe
Shor line Length t, ,
SAM not sure yes
SanJags: not sure yes C.,
Mora
Phot
Waiv
A building permit may be required by:
Notes/Special Conditions �.J
It, f`1 UJI (1,-1 fell). ?
7
tie
-
j 4,
J 6,
�j< ,,,
See note
on back regarding River Basin rules.
p r.
L �Icp(,r
0,rl h.,r-(rwf,(1
fXculd
dr/i rl
"Ic!/ht p,,N
rig1�8�
h���OH�I! ([.�l,,
/
rtm'.
lP 111 dl&i / f,f&-r�
j 1 /
MU!'I [: t jj fVp4(l1 i Pr�Lif f-VI fL �v�rhv r-
■
.
t A fJ L
Agent or Applicant PrinteNam e
Signature "Please read compliance statement on back of permit"
YICc. Cu
Application Fee(s) Check #
Permit Officer's Signature
Issuing Date Expiration Date
Local Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
[ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the ilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax: 919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
15 I -B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax: 910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastaimanagement.net
Revised 10/05/01
W
0
W
PAY TO THE
ORDER OE.
a
DALE P. HOCKER
P.O. BOX 5
MOREHEAD CITY, NC 28557
-b Jl,'
n oa
ATLANTA
POSTAL
39M Crown Rd., Atlanta, CREDIT Georgia o UNION
MEMO 133�
i1200000093609 1704
DATE L 7 /(o
$/oo 'eo
G ,,qq
DOLLARS LJ
1 L 7 L L6311: L 20000009360911' 1704
__�__
,
SECTION .1200 - GENERAL PERMIT FOR CONSTRUCTION OF PIERS: DOCKS: AND BOAT HOUSES IN
ESTUARINE AND PUBLIC TRUST WATERS
15A NCAC 07H .1201 PURPOSE
This permit will allow the construction of new piers, docks, and boat houses in the estuarine and public trust waters AECs
and construction of new piers and docks within coastal wetlands AECs according to the authority provided in Subchapter
7J .1100 and according to the following guidelines. This permit will not apply to the Ocean Hazard AEC.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113.4-124;
Eff. March 1, 1984.
15A NCAC 07H .1202 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting
approval for development. The applicant shall provide information on site location, dimensions of the project area, and
his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the
proposed work. Such notice shall instruct adjacent property owners to provide any comments on the
proposed development in writing for consideration by permitting officials to the Division of Coastal
Management within 10 days of receipt of the notice, and, indicate that no response will be interpreted
as no objection. DCM staff shall review all comments and determine, based on their relevance to the
potential impacts of the proposed project, if the proposed project can be approved by a General Permit.
If DCM staff finds that the comments are worthy of more in-depth review, the applicant shall be
notified that he must submit an application for a major development permit.
(c) Approval of individual projects shall be acknowledged in writing by the Division of Coastal Management and the
applicant shall be provided a copy of this Section.
(d) Construction must be completed within 90 days of the approval of the permit or the permit expires.
(e) Any modification or addition to the approved project shall require prior approval from the Division of Coastal
Management.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113,-1-113(b); 113A-I18.1; 113,A-124;
Eff. March 1, 1984;
Amended Eff. August 1, 1998; January 1, 1990.
15A NCAC 07H .1203 • PERMIT FEE
The applicant must pay a permit fee of one hundred dollars ($100.00) by check or money order payable to the
Department.
History Note: Authority G.S. 113A-107; 113A-113(b); 113A-118.1; 113A-119; 113-119.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. August 1, 2000; March 1, 1991.
15A NCAC 07H .1204 GENERAL CONDITIONS
(a) Piers authorized by this general permit shall be for the exclusive use of the land owner, or occupant and shall not
provide either leased or rented docking space or any other commercial services. Piers designed to provide docking space
for more than two boats shall, because of their greater potential for adverse impacts, be reviewed through the major
permitting process and, therefore, are not authorized by this general permit.
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make
periodic inspections at any time deemed necessary in order to be sure that the activity being performed under the
authority of this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no unreasonable interference with navigation or use of the waters by the public by the existence of
piers, docks and boat houses.
(d) This permit will not be applicable to proposed construction where the Department believes that the proposed activity
might unnecessarily endanger adjoining properties. significantly affect historic, cultural, scenic, conservation or
recreation values, identified in G.S. 1 13A-102 and G.S. 1 13A-113(b)(4), nor that might significantly affect the quality of
the human environment.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements, AEC Guidelines, and local
land use plans current at the time of authorization.
History Note: Authority C.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. Mav 1, 1990;
RRC Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August 1, 1998; July 1, 1994.
15A NCAC 07H .1205 SPECIFIC CONDITIONS
(a) Piers, docks, and boat houses may extend or be located up to a maximum of 400 feet from the normal high water line,
or the normal water level, whichever is applicable.
(b) Piers, docks, and boat houses shall not extend beyond the established pier length along the same shoreline for similar
use. This restriction shall not apply to piers 100 feet or less in length unless necessary to avoid unreasonable interference
with navigation or other uses of the waters by the public. The length of piers shall be measured from the waterward edge
of any wetlands that border the water body.
(c) Piers longer than 200 feet shall be permitted only if the proposed length gives access to deeper water at a rate of at
least one foot at each 100 foot increment of pier length longer than 200 feet, or if the additional length is necessary to
span some obstruction to navigation. Measurements to determine pier lengths shall be made from the waterward edge of
any coastal wetland vegetation which borders the water body.
(d) Piers and docks shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland
substrate as measured from the bottom of the decking.
(e) Any portion of a pier (either fixed or floating) extending from the main structure and six feet or less in width shall be
considered either a "T" or a finger pier.
(f) Any portion of a pier (either fixed or floating) greater than six feet wide shall be considered a platform or deck.
(g) "T"s, finger piers, platforms, and decks of piers on lots with shorelines 100 feet or greater in length shall not exceed a
combined total area of 400 square feet. The combined total area for lots less than 100 feet shall not exceed four square
feet per linear foot of shoreline.
(h) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands.
(i) Boathouses shall not exceed 400 square feet and shall have sides extending no further than one-half the height of the
walls and only covering the top half of the walls. Measurements of square footage shall be taken of the greatest exterior
dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline.
0) Areas enclosed by boat lifts shall not exceed 400 square feet.
(k) Piers, docks, decks, platforms and boat houses shall be single story. They may be roofed but shall not be designed to
allow second story use.
(1) Pier alignments along federally maintained channels must also meet Corps of Engineers regulations for pier
construction pursuant to Section 10 of the Rivers and Harbors Act.
(m) Piers, docks, and boat houses shall in no case extend more than 1/4 the width of a natural water body, human -made
canal or basin. Measurements to determine widths of the water body, human -made canals or basins shall be made from
the waterward edge of any coastal wetland vegetation which borders the water body. The 1/4 length limitation shall not
apply when the proposed pier is located between longer piers within 200 feet of the applicant's property. However, the
proposed pier shall not be longer than the pier head line established by the adjacent piers, nor, longer than 1/3 the width
of the water body.
(n) Piers, docks and boat houses shall not interfere with the access to any riparian property, and shall have a minimum
setback of 15 feet between any part of the pier and the adjacent property lines extended into the water at the points that
they intersect the shoreline. The minimum setbacks provided in the rule may be waived by the written agreement of the
adjacent riparian owner(s), or when two adjoining riparian owners are co -applicants. Should the adjacent property be sold
before construction of the pier commences. the applicant shall obtain a written agreement with the new owner waiving the
minimum setback and submit it to the Division of Coastal Management prior to initiating any development of the pier,
dock, or boat house. The line of division of areas of riparian access shall be established by drawing a line along the
channel or deep water in front of the property, then drawing a line perpendicular to the line of the channel so that it
intersects with the shore at the point the upland property line meets the water's edge. Application of this Rule may be
aided by reference to the approved diagram in Paragraph (q) of this Rule illustrating the rule as applied to various
shoreline configurations. Copies of the diagram may be obtained from the Division of Coastal Management. When
shoreline configuration is such that a perpendicular alignment cannot be achieved, the pier shall be aligned to meet the
intent of this Rule to the maximum extent practicable.
(o) Piers, and mooring facilities shall be designed to provide docking space for no more than two boats.
(p) Applicants for authorization to construct a dock or pier shall provide notice of the permit application to the owner of
any part of a shellfish franchise or lease over which the proposed dock or pier would extend. The applicant shall allow
the lease holder the opportunity to mark a navigation route from the pier to the edee of the lease.
(q) The diagram shown below illustrates the various shoreline configurations.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. December 1, 1991; May 1, 1990; March 1, 1990;
RRC Objection due to ambiguity Eff. March 18, 1993;
Amended Eff. August 1, 1998; April 23, 1993.
6
Date: /,' , �,
Reference; Pier extension,
To: Dale P. Rocker
2441 PauJs Path Rd
Kinston NC 28504
I do not object to a pier extension and boatlift installation at 132 Wackena Way, Beaufort
NC 28516. This property is also known as Lot 18 in the Indian Summer Estates sub-
division. I understand the pier will be approximately the same length as the existing pier
at Lot 19.
I am the current owner of Lot 17 In the Indian Summer Estates sub -division, which is
adjacent to Lot 18.
eankJuanil o
214.37 Thirty Sixth Ave
Bayside NY 11361
Z ' d ti£LZ' ON �N AdH UN K lAdh ]ViNd SO UN:[ CON ' H' gad
MAY-08-2002 WED 01:14 PM NC DIV OF COASTAL MGM FAX NO. 4 p, Q3
f-Egx . AWL . RETL_ N RECEIPT REQUESTED
DIVISION Of COASTAL 14ANAGEVINT
ADJACENT RIPARIAN PROPERTY Ow.N7.R NOTInCATION /WAIVER FOR',i
Name of Individual appiyin; for Permit:
,'.ddt'E5S of Property;, 3 k W act n
(Lot or Street #, Sir. r: or Road, CIry & County)
I hercoy ctaffy chat I own property adjacent to the above referenced praperry. The individual
a; plying for this permit has described to me as shown on the aTmchz drawing the deaeloprnent
they are proposing. A description or drawing, with dimensions, s4ould be provided with this
Ie::er.
I have no obiecrians to this proposal.
If you have objections to ghat is being proposzd, please ware the Division of Coastal
3farw1ement, Hivmn Plrz,,.c U, 13I-B, Hwy. 24, Moreezzad Cuv, C, 28SS7 or calf (252) 808-
2808 within 10 days of rece pt of this aoc?ce. No response is const ,?rsd :he Sams as no objection
ff you have 6esn nor�fied by Cenz fed UaiI.
WAIL ER SECTION
I ,--nderrzand that a pier, docl, mooring pilings, bre*W M7, beat house, li416- or sandbags mus be
U".'lack a minimum distance oz 1S' tom my area of ac_css unless waived by me. (If you
h ash w "waive the ,se!hack, YQU must initial the belt%, )
I do wish to "waive the 15' setback recuire-enr.
I do not wish ro waive the 15' sa:back re�_ireneat,
5 i anaTure D ate
_EII�oSF lull/�1ns"
print Name
1ag_nda
TWia�hone Num'ver With Area, Cade
l ' d VELZ' ON 3N 1H9 AH 301Aa3S 1d1SOd SA WdH: l HE ' 9Z' Qa3
• 1 i ! I� I i �' i t �' I I I � I � I I I l,l '
.._L_ ,.-..r..._-..M_ .0 t._..r.�ir.w.h.~.....�._.. w _'�w,�r'•.._ i ._'I_._'..1 _- .�. ..I u....y�.vLr.jw__
TT
1
_..1 -.. rM_
17
' Nb38 M3N 33IA83S 1d1SOd Sfl i__IWd8Z: l —EOOZ ' 9Z' 9aj
J� eb - 26 - 2003 1 : 28PM )AUS POSTAL SERVICE NEW BERN - NC N o - 2 7 3 4 P - 4
Z
IL'
12,8
ZIP-
5 66
I
J �unfl� a
r
P IL
/ !4
13 3
yg 3 yo4
3241