HomeMy WebLinkAboutGeneral Permits (7917)CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
Applicant Name
Address
City
Project Location (County, State Road, Water Body, etc.)
Phone Number
State Zip c:3'7 I s
Type and Dimensions of Project i
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203. This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
SKETCH (SCALE: )
i
�l
�l,,ilip � �
Y
Any person who proceeos witn a oevelopment witnout the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
Applicant's signature
CAMA Official's signature
Issuing date
Expiration date
Attachment: 15 North Carolina Administrative Code 7K .0203
Rules for Beach Bulldozing
Beach bulldozing is a common method of erosion management that moves sand, usually to repair
storm damage to an existing dune or to create a protective berm if the dune system has been
completely washed away. Beach bulldozing may be permitted if you follow the general rules for
development within Mn ocean hazard
area of environmental concern, and
you follow these specific
• If you are bulldozing under a
general permit, you must
confine sand movement to
landward of the normal high
water line. Moving sand that
is seaward of the low water
line re uires a (AMA ma'or
Wkli UtDOI G TO RESTORE QUNES
r ,
fir, t o xt!ie . wit �
as�n�a
OCEAN
ERR ED DUN
;rvc(,f
q 1