Loading...
HomeMy WebLinkAbout23675_STANLEY, ADRIAN C_19991119CAMA and DREDGE AND FILL G E N E R A L Nib1115 PERMIT as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Applicant Name Address City State Project Location (County, State Road, Water Body, etc.) Type of Project Activity PROJECT DESCRIPTION SKETCH Pier (dock) Length Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. Phone Number Zip issuing date (SCALE: ) applicant's signature permit officer's signature expiration date attachments application fee STATE EMPLOYEES' CREDIT UNION MOREHEAD CITY BRANCH REMITTER ROBERT JOHINSON PAY TO THE ORDER OF MONEY ORDER D.El. N.R. 8432. November 19 19 99 66.7704/2531 $ 50.00 DOLLARS State Employees' Credit Union VOIDJAER 18 S Morehead Cih, North Carolina AUTHORIZED SIGNATURE li`008 4 3 2ii` is 2 5 3 L 7 7049l:08604 300 38 SIl6 ' OA TA 'i'1ANAGEMENT TI5A: 07H .I100 SECTION .1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AND THE PLACEMENT OF RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS .1101 PURPOSE " This permit will allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters and estuarine waters AECs according to authority provided in Subchapter 7J .1100 and according to the following guidelines. This permit will not apply to shoreline protection within the ocean hazard AEC. History Nore: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Eff. March 1, 1984. .1102 APPROVAL PROCEDURES (a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for development. The applicant shall provide information on site location, dimensions of the project area, and his name and address. (b) The applicant must provide: (1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners indicating that they have no objections to the proposed work; or (2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work. Such notice should instruct adjacent property owners to provide any comments on the proposed development in writing for consideration by permitting officials to the Division of Coastal Management within ten days of receipt of the notice, and, indicate that no response will be interpreted as no objection. DCM staff will review all comments and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can be approved by a General Permit. If DCM staff finds that the comments are worthy of more in-depth review, the applicant will be notified that he must submit an application for a major development permit (c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal Management representative so that the proposed bulkhead aligm nent can be appropriately marked. Written authorization to proceed with the proposed development may be issued during this visit. Construction of the bulkhead or riprap structure must begin within 90 days of this visit or the general authorization expires and it will be necessary to re-examine the alignment to determine if the general authorization can be reissued. HistoryNote: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Ef. March 1, 1984; Amended Eff. January 1, 1990; December 1, 1987. .1103 PERMIT FEE The applicant must pay a permit fee of fifty dollars (550.00) by check or money order payable to the Department HistoryNote: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-119; 113A-124; Eff. March 1, 1984, Amended Eff. March 1, 1991. .1104 GENERAL CONDITIONS (a) This permit authorizes only the construction of bulkheads and the placement of riprap conforming to the standards herein. (b) Individuals shall allow authorized representatives of the Department of Environment, Health, and Natural Resources to make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under authority of this general permit is in accordance with the terms and conditions prescribed herein. (c) There shall be no significant interference with navigation or use of the waters by the public by the existence of the bulkhead or the riprap authorized herein. (d) This permit will not be applicable to proposed construction where the Department has determined, based on an initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality; coastal wetlands; cultural or historic sites; wildlife; fisheries resources; or public trust rights. NORTH CAROLI.N.A .ADMINISTRATIVE CODE OSP-1198 ENR - COASTAL MANAGEMENT T15A: 07H.1100 (e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization. (f) Development carried out under this permit must be consistent with all local requirements, AEC rules, and local land use plans current at the time of authorization. History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Eff. March 1, 1984; Amended Eff. May 1, 1990; December 1, 1987; RRC Objection due to ambiguity Eff. May 19, 1994; Amended Eff. August 1, 1998; July 1, 1994. .1105 SPECIFIC CONDITIONS (a) This general permit is applicable only along shorelines void of wetland vegetation including marsh grass and wooded swamp, or where all construction is to be accomplished landward of such vegetation. (b) Along natural shorelines e.g. rivers, creels, bays, sounds, etc., bulkheads and riprap material must be positioned as follows: (1) Bulkheads must be positioned so as not to exceed more than an average distance of 2 feet waterward of the mean high water mark, or the normal water level contour, whichever is applicable. In no case shall the bulkhead be positioned more than 5 feet waterward of the mean high water or normal water Ievel contour at any point along its alignment. (2) Riprap must be positioned so as not to exceed a maximum of 5 feet waterward of the mean high water mark or normal water level contour at any point along its alignment. This location standard also applies to riprap proposed waterward of the existing bulkheads. (c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to exceed more than an average distance of 5 feet waterward of the mean high water mark or the normal water level contour, whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet waterward of the mean high water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atlantic Intracoastal Waterway (AIWW) is considered a natural shoreline and development must occur as described in 7H A 105(b). (d) Construction authorized by this general permit will be Iimited to a maximum shoreline length of 500 feet. (e) All backfill material shall be obtained from an upland source. (f) The bulkhead must be constructed, or the riprap must be in place prior to any bacldilling activities. (g) The bulkhead or riprap must be structurally tight so as to prevent seepage of backTi materials through the structure. ` (h) Riprap material shall be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. (i) Riprap material must consist of clean rock or masonry materials such as but not limited to granite or broken concrete. Materials such as tires, car bodies, scrap metal, paper products, tree limbs, wood debris, organic material or similar material, are not considered riprap. 0) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. (k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the canal or basin. 0) If one contiguous acre or more of property is to be excavated or filled, an erosion and sedimentation control plan must be filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction. This plan must be approved prior to commencing the land -disturbing activity. History Note: Authority G.S.113A-107(a), 113A-107(b); 113A-113(b);113A-118.1; 113A-124; Ef. March 1, 1984; Amended Eff. December 1, 1991; January 1, 1989; December 1, 1987. \'nx'T7-7 r-i Pnr rvd i n1 fr?l'rcTr, i rri,P /-nr1F n4,"77/gQ n___ ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery,is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. Article Addressed to: ,L�u✓1,,��,,., AIC Z 72 i S A. Received by (Please Print Clearly) I B. Date C. Signature I(j/%jy I X &/'X/— ❑ Agent Z""' n624,41P Addressee D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No i 3. Service Type i& Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) PS Form 3811, July 1999 Domestic Return Receipt 102595-99-M-1789 UNITED STATES POSTAL SERVICrf' 1✓ R1 s� First -Class Mail ID��SPS e & J Y NUY ---- -- • Sender: Please print ur/pjTT ddress, and ��Rt41in`t�is`box � P ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Aft -A,) SFAr�UEY 's (Name of Property'Owner) Property located at UFF Tr j C —R=- N-ec� AT Teet-,(,,1cRs C:,F (Lot, Block, Road, etc.) on Ivey R,0�, in CZAJIQrJ , N.C. (Waterbody) (Town and/or County) He has described to me as shown below, the development he is proposing at that location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (To be filled in by individual proposing development) 1 pr. of Luc ti.A� -/�— Z.// Z'� Signature �holMCrf bt /�eOPrT.rOh Print or Type Name 2 Lf 7 —2 �- SS Telephone Number Date: