HomeMy WebLinkAboutGeneral Permits (7732)O
Applicant Name
Address 1
City
Project Location (Cc
CERTIFICATION
EXEMPT
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0
Type and Dimensions of Project Cl,NVIA c. i, -K >. OU r, 07 c
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203. This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA permit is
vali&for 90 days frpm the date of issuance. Following expiration,
a re-exaMinatiorrof the project and project site may be necessary
to continue this certification.
SKETCH (SCALE: = i, .. ) I
-- - — Your project is subject to the
Tar/Pamlico River Basin Buffer
Rules due to its location within the
Tar/Pamlico Basin. Please contact
, 4 s Deborah Sawyer at (252) 946-6481.
y i
a -
r,
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
Zr
Applicant's s�jgnature
CAMA Official's signature
Issuing date
Expiration date
Attachment: 15 North Carolina Administrative Code 7K .0203