Loading...
HomeMy WebLinkAboutGeneral Permits (7726)CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. t ? y "•e, 67 Applicant Name Phone Number Address City State Zip Project Location (County, State Road, Water Body, etc.) Type and Dimensions of Project r The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. This c^rtification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. I SKETCH (SCALE: 1i. ) I A AY I _ Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. s signature A__' t' CAMA Official's signature Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 I do not object to the placement of rock rip rap at the water's edge on the Edward Pond lot in order to protect the shore/bankhead and reduce the erosion of property immediately east of State Road 1368 at Davis, NC. I understand that the rock rip rap will be placed as approved by CAMA Permit and entirely on the Pond lot beginning at the south most rock jetty and running northward for approximately one hundred feet along a line in the vicinity of the high tide line to join the rock that was placed by the NC DOT to protect the eastern edge of the SR1368 right-of-way. I own the lot on the shore south of the Pond Lot described above. Signed Date I do not object to the placement of rock rip rap at the water's edge on the Edward Pond lot in order to protect the shore/bankhead and reduce the erosion of property immediately east of State Road 1368 at Davis, NC. I understand that the rock rip rap will be placed as approved by CAMA Permit and entirely on the Pond lot beginning at the south most rock jetty and running northward for approximately one hundred feet along a line in the vicinity of the high tide line to join the rock that was placed by the NC DOT to protect a portion of the eastern edge of the SR1368 right-of-way. I have reviewed the planned wo�and)have no objection to the project. Date