HomeMy WebLinkAbout26667_PATTERSON, JAMES D_20000903Applicant Name
Address
LAMA and DREDGE AND FILL E
-•��-
6C67-
G E N E R A L �.
PERMIT SEP 1 5 2000
as authorized b the State of North Carolina COASTAL MANAGEMENT
y MOREHEAD I
Department of Environment and Natural Resources and the oas a esources Commission
in an area of environmental concern pursuant to 15 NCAC>
Phone Number
City State
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
Zip
PROJECT DESCRIPTION SKETCH
Pier (dock) Length
i
j
.,
"c
(SCALE:
, i
7
1
m_
_ado
Groin Length
number
Bulkhead Length
max. distance offshore
l
1
.
.
.....
. . ....
Basin, channel dimensions
cubic yards
Boat ramp dimensions
. 4._ .� )J.�.J.....�
t
(
�F
,
l
.J
I.
Cat
1
.........
other
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies that this project
is consistent with the North Carolina Coastal Management Program.
applicant's signature
permit officer's signature
issuing date expiration date
attachments
�1
application fee
LORRAINE W. PATTERSON
�pt�a�rolp7 2322
JAMES D. PA'ITj'ERSON 0 � 66-7538�253'
NCDL 8678752 NCDL 8276734 252-808-0331 Date �- Z�- 04
4936 HWY. 101
NEWPORT, NC 28570 u p �� Q�
Pay to the �'� 1 1�
Order of
rn-lp - _=cO d
FirstFl�t.
Morehead ClW. NC 28557
For awo
1:2531753841: LO80L482C.
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
•j 71 DIVISION OF COASTAL MANAGEMENT
NCDENR
September 8, 2000
JAMES B. HUNT JR.
GOVERNOR
James D. Patterson
4936 Hwy 101
BILL HOLMAN Newport, N.C. 28570
SECRETARY
Dear James:
DONNA D. MOFFITT Attached is General Permit #C-26667 to install a 5' X 30' side to dock and a 15' X 39' boat
DIRECTOR ramp at 4936 Hwy 101, near the Mill Creek community, Carteret County.
In order to validate this permit, please sign all three (3) copies as indicated. Retain the white
copy for your files and return the yellow and pink signed copies to us in the enclosed, self-
addressed envelope.
Your early attention to this matter would be appreciated.
Sincerely,
.�Oki;
M. Scott Jones
Coastal Management Representative
MSJ/rcb
Enclosures
rl
IN AMCX14A
MOREHEAD CITY OFFICE
HESTRON PLAZA lip 151-B HIGHWAY 24, MOREHEAD CITY NC 28557
PHONE: 252-808-2808 FAX: 252-247-3330
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST -CONSUMER PAPER
DENR TOLL FREE HOTLINE: 1-877-623-6748
ENL - COASTAL MANAGEMENT
TI 5A: 07H .1600
SECTION .1600 - GENERAL PERMIT FOR THE INSTALLATION OF AERIAL AND SUBAQUEOUS
UTILITY LINES WITH ATTENDANT STRUCTURES IN COASTAL WETLANDS: ESTUARINE
WATERS: PUBLIC TRUST WATERS AND ESTUARINE SHORELINES
.1601 PURPOSE
This permit will allow for the installation of utility lines both aerially and subaqueously in the coastal wetland,
estuarine water, public trust areas and estuarine shoreline AECs according to the authority provided in Subchapter 71
.1100 and according to the following guidelines. This general permit shall not apply to the ocean hazard AECs.
History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1;
Eff. March 1, 1985;
Amended Eff. August 1, 1998.
.1602 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting
approval for development. The applicant shall provide information on site location, dimensions of the project area, and
his name and address.
(b) Th.- applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice should instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management
within ten days of receipt of the notice, and, indicate that no response will be interpreted as no objection.
DCM staff will review all comments and determine, based on their relevance to the potential impacts of the
proposed project, if the proposed project can be approved by a General Permit. If DCM staff finds that the
comments are worthy of more in-depth review, the applicant will be notified that he must submit an
application for a major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal
Management representative so that the utility line alignment can be appropriately marked. Written authorization to
proceed with the proposed development will be issued during this visit. Construction on the utility Iine must begin
within twelve months of this visit or the general authorization expires.
HistoryA'ote: Authority G.S. 113A-107(a)(b); 113A-113(b); 113A-118.1; 113A-229(cl);
Eff. March 1, 1985,
Amended Eff. January 1, 1990.
.1603 PERMIT FEE l cv, (7"
The applicant must pay a permit fee of fifty dollars (S" ) by check or money order payable to the Department.
History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; 113A-119;
Eff. March 1, 1985;
Amended Eff. March 1, 1991.
.1604 GENERAL CONDITIONS
(a) Utility lines for the purpose of this general permit or any pipes or pipelines for the transportation of potable water,
domestic sanitary sewage, natural gas, and any cable, line, or wire for the transmission, for any purpose, of electrical
energy, telephone and telegraph messages, and radio and television communication.
(b) There must be no resultant change in preconstruction bottom contours. Authorized fill includes only that
necessary to backfill or bed the utility line. Any excess material must be removed to an upland disposal area.
(c) The utility line crossing will not adversely affect a public water supply intake.
(d) The utility line route or construction method will not disrupt the movement of those species of aquatic life
indigenous to the waterbody.
(e) Individuals shall allow authorized representatives of the Department of Environment, Health, and Natural
Resources to make periodic inspections at any time necessary to ensure that the activity being performed under authority
of this general permit is in accordance with the terms and conditions prescribed herein.
NORTH CAROLINA ADMINISTRATIVE CODE 08121198 page I
„4
ENR - COASTAL MANAGEMENT T15A: 07H .1600
(f) This general permit will not be applicable to proposed construction where the Department has determined, based
on an initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are
unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality;
coastal wetlands; cultural or historic sites; wildlife; fisheries resources; or public trust rights.
(g) This permit does not eliminate the need to obtain any other required state, local, or federal authorization, nor, to
abide by regulations adopted by any federal or other state agency.
(h) Development carried out under this permit must be consistent with all local requirements, AEC guidelines, and
local Land Use Plans current at the time of authorization.
History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1;
Eff. March 1, 1985; '
Amended Eff. May 1, 1990;
RR Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August 1, 1998; July 1, 1994.
.1605 SPECIFIC CONDITIONS
Proposed utility line installations must meet each of the following specific conditions to be eligible for authorization
by this general permit:
(1) All domestic sanitary sewer line requests must be accompanied by a statement of prior approval from the NC
Division Water Quality.
(2) All spoils which are permanently removed must be placed on a high ground disposal site and stabilized so
as not to return to waters, marsh or other wetlands.
(3) Any additional backfill material required must be clean sand or rock free of organic matter.
(4) Cuts through wetlands must be minimized.
(5) Finished grades or subaqueous or wetland crossing must be returned to preproject contours.
(6) There can be no work within any productive shellfish beds.
(7) No excavation or filling activities will be permitted between April 1 and September 30 of any year within any
designated primary nursery area.
(8) Subaqueous lines must be placed at a depth of six feet below the project depth of federal projects. In other
areas they will be installed at a minimum depth of two feet below the bottom contour.
(9) The minimum clearance for aerial communication lines or any lines not transmitting electricity will be 10'
above the clearance required for bridges in the vicinity.
(10) The minimum clearance for aerial electrical transmission lines shall be consistent with those established by
the US Army Corps of Engineers and US Coast Guard.
(11) The installation of a utility line on pipe bents or otherwise above the elevation of mean high or mean ordinary
water must be of sufficient height to allow for traditional navigation in the water body. Additionally the
utility line must not interfere with the waterflow of normal or flood waters.
(12) Natural gas lines must not exceed I inches in diameter.
History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1;
Eff. March 1, 1985;
Amended Eff. August], 1998.
NORTH CAROLINA ADMINISTRATIVE CODE 08121198 Page 2
1.'LL, J)Lzi.! N.'I U L" ,..�.. .
..(—'UV
SECTION .1200 - GENERAL PERMIT FOR CONSTRUCTION OF PIERS: DOCKS: A.N'D
BOAT HOUSES IN ESTUARIA'E AND PUBLIC TRUST WATERS
.1201 PURPOSE
This permit will allow the construction of new piers, docks, and boat houses in the estuarine and public trust waters
AECs and construction of new piers and docks within coastal wetlands AECs according to the authority provided in
Subchapter 7I .1100 and according to the following guidelines. This permit will not apply to the Ocean Hazard AEC.
History N01e.• Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 173A-124,-
Eff. March 1, 1984.
.1202 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting
approval for development. The applicant shall provide information on site location, dimensions of the project area,
and his name and address.
(o) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice shall instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting Officials to the Division of Coastal Management
within 10 days of receipt of the notice, and, indicate that no response will be interpreted as no objection.
DCM staff shall review all comments and determine, based on their relevance to the potential impacts of
the proposed project, if the proposed project can be approved by a General Permit. If DCM s aff finds that
the comments are worthy of more in-depth review, the applicant shall be notified that he must submit an
application for a major development permit.
(c) Approval of individual projects shall be aclmowledged in writing by the Division of Coastal Management and
the applicant shall be provided a copy of this Se lion.
(d) Construction must be completed within 90 days of the approval of the permit or the permit expires.
(e) Any modification or addition to the approved project shall require prior approval from the Division of Coastal
Management.
His107y Nole; Awhorhy G.S. 113A-107(a); 113.4-107(b); 113A-113(b);113A-118.1; 113A-124;
�. March 1, 198,-,-
Amended Eff. Augurs 1, 1998, January 1, 1990.
.1r' 03 PERK= FEE I a) CO
The applicant must pay a permit fee of fifty dollars (S5e-. ) by check or money order payable to the Department.
Hisrary Nole. Authority G.S. 113A-1071a); 113.4-107(b); 113A-113(b); 113A-118.1; 113A-119, 113A-124;
Eff. March 1, 1984,-
Amended Eff. March 1, 1991.
.1204 GENERAL CONDrnoNTS
(a) Piers authorized by this general permit shall be for the exclusive use of the land owner, or occupant and shall
not provide either leased or rented docking mace or any other commercial services. Piers designed to prov�ide docking,
space for more than two boats shall, because of 1h:ir greater potential for adverse impacts, be revi_wed through the
major permitting process and, therefore, are not authorized by this general permit. -
(b) individuals shall allow authorized representatives of the Department of Environment and ?natural Resources
to make periodic inspections at any time deemed necessary in order to be sure that the activity beins perfo.-med under
the authority of this general pormit is in accordance with the terms and conditions pres-.ibed herein.
(c) There shall be no unreasonable interference with navigation or use of the waters by the public by the existence
of piers, docks and boat houses.
(d) This permit will not be applicable to proposed construction where the Department believes that the proposed
NORTH CAROLINA 4DAIINISTRAT11 E CODE 08121198 Page I
ft-
EA'R - C0.4ST.4L AL4N.4GEMENT T15A: 07H .1200
activity might unnecessarily endanger adjoining properties; significantly affect historic, cultural, scenic, conservation
or recreation values, identified in G.S. 113A-102 and G.S. 113A-113(b)(4), nor that might significantly affect the
quality of the human environment.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements, AEC GuidcIine;, and
local land use plans current at the time of authorisation.
History Note: Authority G.S. 113A-107(a), 113A-107(b); 113.4-113(b); 113A-118.1; 113A-124,
Eff. March 1, 1984,
Amended Eff. May 1, 1990;
RRC Objection due to mnbiguiryE,f: May 19, 1994,
Amended Ejj: August 1, 1998; Judy 1, 1994.
.1205 SPECIFIC CONDITIONS
(a) Piers, docks, and boat houses may extend or be located up to a maximum of 400 feet from the normal hjgh
water line, or the normal water level, whichever is applicable.
(b) Piers, docks, and boat houses shall not extend beyond the established pier length along the same shoreline for
similar use. This restriction shall not apply to piers 100 feet or less in length unless necessary to avoid unreasonable
interference with navigation or other uses of the waters by the public. The length of piers shall be measured from
the waterward edge of any wetlands that border the water body.
(c) Piers longer than 200 feet shall be permitted only if the proposed length gives access to deeper water at a rate
of at least one foot at each 100 foot increment of pier Iength longer than 200 feet, or if the additional length is
necessary to span some obstruction to navigation. Measurements to determine pier lengths shall be made froth the
waterk•ard edge of any coastal wetland vegetation which borders the water body.
(d) Piers and docks shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland
substrate as measured from the bottom of the decking.
(e) Any portion of a pier (either fixed or floating) extending from the main structure and six feet or less in width
shall be considered either a "T" or a fmger pier.
(f) .Any portion of a pier (either fixed or floating) greater than six feet wide shall be considered a platform or deck.
(g) 'T"s, fmgerpiers, platforms, and decks of piers on lots with shorelines 100 feet or greater in length shall not
exceed a combined total area of 400 square feet. The combined total area for lots less than 100 feet shall not exceed
four square feet per linear foot of shoreline.
(h) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands.
(i) Boathouses shall not exceed 400 square feet and shall have sides extending no further than one-half the height
of the walls and only covering the top half of the walls. Measurements of square footage shall be taken of the greatest
exterior dimensions. Boathouses shall not be allowed on lo*s with Lss than 75 linear feet of shoreline.
@ Areas enclosed by boat lifts shall not exceed 400 square feet.
(x) Piers, docks, decks, platforms and boat houses shall be single story. They may be roofed but shall not be
designed to allow second story use.
0) Pier alignments along federally maintained channels must also meet Corps of Engineers r tgulations for pier
corsuuction pursuant to Section 10 of the Rivers and Harbors Act.
-, L:�-
.s, docks, and boat houses shall in no case extend more than 1/4 the width of a natural water body, h=. a---
..., .._
made canal or basin. Measurements to determine widths of the water body, human -made canals or basins shall be
made from the waterward edge of any coastal wetland vegetation which borders the water body. The 1/4 ken-gth
limitation shall not aDDly when the proposed pier is located between longer piers within 200 feet of the at7D'ucaIli's
property. However, the proposed pier shall not be longer than the pier head line established by the adjacent piers,
nor, longer than 113 the width of the water body.
(n) Piers, docks and boat houses shall not interfere with the access to any riparian property, and shall have a
minimum sefoacb of 15 feet between any part of the Dier and the adjacent property lines extended into the water at
the points that they intersect the shoreline. The minimum setbacks provided in the rule may be waived by the written
agreement of the adjacent riparian owner(s), or when two aajo=,— riparian owners are co -applicants. Should the
adjacent property be sold before constrnction of the pier commences, the applicant shall obtain a written agreement
with the new owner waiving the minimum setback: and submit, it to the Division of Co2stal Management prior to
initiatiyg any development of the pier, dock, or boat house. The line of division of areas of riparian access shall be
estabHshe d by drawing a line along the channel or deep water in front of the property, then drawing aline
perpendicular to the line of the channel so that it intersects with the shore at the point the upland property line mees
the water's edge. Application of this Rule may be aided by reference to the approved diagram in Paragraph (q) of
this Rule illustrating the mile as applied to various shoreline configurations. Copics of the diagram may be obtained
from the Division of Coastal Management. When shoreline configuration is such that a perpcndi--War alignment cannot
be achieved, the pier shall be aligned to meet the intent of this Rule to the maximum extent practicable.
(o) Piers, and mooring facilities shall be designed to provide docking space for no more than two boas.
(p) AppIicants for authorization to constrict a dock or pier shall provide notice of the permit application to the
owner of any part of a shellfish
franchise or lease over which the
proposed dock or pier would extend.
Tbc applicant o 9a` shall allow the lease
holder the opportunity to mark a
navigation route � irom the pier to the
edge of the _ I lac.
(q) The -_:= I diagram shown below
illustrates the various shoreline
configurations.
_;EXAMPI.ES,
"71UPARIAWACCESSAREAS- -
PROJFCT-AREA
-'- EDGE OF CHANNEL OR
-`-DEEP WATER.--* -
_—_ = PROFEKTYLINE= ---
RIPAH'JAN LLMrr=_
_•/' MEAN HIGH WATER -
y44k = —
Rotary Nore. Authori.y G.S. 113_Q-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
NORTH C_4ROLIX4 A.DMI_YISTR.4TIiT CODE 08121198
Page 3
CO.-ISTIL MAN4GEMENT
Y'154: 07H.1200
Eff. March 1, 1984;
Amended Eff. December 1, 1991; May 1, 1990,-,A4arch 1, 1990;
RRC Objecrion due 10 ambiguity Eff. March 18, 1993;
Amended Eff. August 1, 2998, April 23, 1993.
r , - , 4 " 7 , , " -, -7 �' " I-, � � � - � �:, -, , , ,7 , - T,� 1 7, - �I- � i , 1 -1 , "I 7 , , - - - - - - - - - - - - - - -- - -,
ENR -COASTAL MANAGEMENT T1 A: 07H .1300
SECTION .1300 - GENERAL PERMIT TO MAINTAIN: REPAIR AND CONSTRUCT BOAT
RAMPS ALONG ESTUARINE SHORELINES AND INTO ESTUARINE AND PUBLIC TRUST
>i c WATERS
.1301 PURPOSE
'ik+`XS This permit will allow the construction of boat ramps of suitable materials along estuarine shorelines and into
estuarine and public trust waters AECs according to the authority provided in Subchapter 7J .1100 and according to the
following guidelines. This permit will not apply to the Ocean Hazard AEC.
76
HistoryNote: Authority G.S.113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984.
.1302 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting
approval for development. The applicant shall provide information on site location, dimensions of the project area, and
his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice should instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management
within ten days of receipt of the notice, and, indicate that no response will be interpreted as no objection.
DCM staff will review all comments and determine, based on their relevance to the potential impacts of the
proposed project, if the proposed project can be approved by a General Permit. If DCM staff finds that the
comments are worthy of more in-depth review, the applicant will be notified that he must submit an
application for a major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal
Mana-ement representative so that the proposed boat ramp alignment can be appropriately marked. Written
authorization to proceed with the proposed development will be issued during this visit. Construction of the boat ramp
structure must bean within 90 days of this visit or the general authorization expires.
ZP
History Nose: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. January 1, 1990.
.1303 PERMIT FEE
The applicant must pay a permit fee of fifty dollars ($50.00) by check or money order payable to the Department.
HistoryNote: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-119; 113A-124;
Eff. March 1, 1984,
Amended Eff. March 1, 1991.
.1304 GENERAL CONDITIONS
(a) Structures authorized by this permit shall be non-commercial boat ramps constructed of acceptable material and
conforming to the standards herein.
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to
make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under
authority of this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no unreasonable interference with navigation or public use of the waters during or after
construction.
(d) This permit will not be applicable to proposed construction where the Department has determined, based on an
initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are
unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality;
coastal wetlands; cultural or historic sites; wildlife; fisheries resources; or public trust rizhts.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
'Zt ;J_w�_ t nArr.,'r.CT trr r ",r>>: tin.:-_
ENR - C ; AANAGEME T15A: 07H .1300
(f) Development carried out under this permit must be consistent with all local requirements, AEC rules, and local
land use plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. May 1, 1990;
RR Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August 1, 1998; July 1, 1994.
.1305 SPECIFIC CONDITIONS
(a) Boat ramps shall be no wider than 15 feet and must not extend farther than 20 feet below the mean high water
level contour in tidal areas, or the normal water level contour in nontidal areas.
(b) Excavation and ground disturbing activities above and below the mean high water level or normal water level will
be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size than
specified by this general permit.
(c) Placement of fill materials below the mean high water level, or normal water level contour, will be limited to the
ramp structure itself. Boat ramps may be constructed of concrete, wood, steel, clean riprap, marl, or any other
acceptable materials as approved by department personnel. No coastal wetland vegetation shall be excavated or filled
at any time during construction and subsequent use of the proposed ramp.
HistoryNote: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124,
Eff. March 1, 1984.
NORTH CAROLINA ADMINISTRATIVE CODE 08121198 Page 2
IMPORTANT MESSAGE
Scf}-�-
DATE 'tea TIME fa S' P.
M �o_ vk VN C S '
OF y �' p
PHONE 9 - Q.3`3 1
AREA CODE NU ER EXTENSION
FAX
Cl MOBILE
AREA CODE NUMBER TIME TO CALL
TELEPHONED it PLEASE CALL
CAME TO SEE YOU WILL CALL AGAIN
WANTS TO SEE YOU RUSH
RETURNED YOUR CALL SPECIAL ATTENTION l
MESSAGE-:�c - "LAA 1q2c' S4- ULS, 7—
�J
SIGNED
FORM 3002S
MADE IN U.S.A.
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGS/BOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent to ""
(Name Property Owner)
property located at
(Lot, Block, Road, etc.)
on �0-1 ,ow t CP6 ki in �p.� k , N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
I do not wish to waive the setback requirement.
I da wish to waive that setback requirement.
JUN 2 0 2000
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPNIENT:
(To be filled in by individual propgszng development)
i4A kr� �t ( a4G." —
Print or Type Name
Telephone Number
Date: '' , � �' 2��e y-,
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent to „ �<�Se, 's
(Name df operty Owner)
property located at
(Lot, Block, Road, etc.)
on A( L-jw L CO.AgA , in Cos �e RA , N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatliftlboathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
I do not wish to waive the setback requirement. I P,�� ( `gyp'
I da wish to waive that setback requirement. . JUN 2 0 2000
----------------------------------------------- ----------------------------------- --f'5t!3ff AY`;EME
DESCRIPTION AND/OR DRAWIi iG OF PROPOSED DEVEL4' NME?v-r-'- EA°
(To be filled in by individual proposing development)
--IA m `ow -t- Cav a. k
Print or Type Name
Telephone Number
Date:��°
7hirJ�
A R L O WE
_ 234.37' — C 1, U B T 0 0 T �r
S 26, 09'00"E 159.81' 159.81, C A 1V A
S 26°09'00"E .c 0 140.22' 169. A L
io v S 26 09'00"E oS 26°09'00TEmo - -Q 1G9_GG'°'2G 09'00"E S 26°09'00"E � rj
175.0' A.E.CI (C.A.M.A.) SETBIC —
K LINE
FOOD ZONE A5 KITH BASE FLOOD ELEVATION `-----
8.0 FEET
10.0' SANITARY I
I C I W I,.O-- CROSS TIE I SEWER EASEMENT
I c0 10 WOOD DRMGE
JUN 20 000 d
W o
Cz
RIIl`k_A.�l LC -TRACT
R-ACT2'TRACT COASTALr
�EMEN►�j�RCT , TRACT rI---- - - -_ OREH
IQ T iV0 0. 33'00"1 334.40 t�
�
v 3 -.- - a �V 0 . � .i a Z j
T�Ra�L olI -----
1093 Acres 3.719 FOUR
i al I 3.872 ACRES � 3.845
3.694 �I I 3.221 AC' Jkcres
- - - - - - z Acres
o
o GARAGE I rt - -
FLOOD ZONE, "B" Im I I I I w
�o�Io
ko' x 160, 610 , w SANITARY Io I I C? I'd I : o p� n
.. I SEWER TWo 1 I o Oa
ou I 1 EASEMENT Q STORY n d0 I
N 9'10.08"W FRAME
50.-0 DWELLING 2° � O
FL00 ZONE ,1C,� _.
z� r �lo r
I
z l NOTE: z l H 0) I oo I r
rn l SANITARY o f o
rn
rn SEWER
0 oW Jo EASEMENTS Wo Cn o oo 0 o
IT 28°33'00"IY _ o I, BEGINS 450.0' O o o o o
p o p FROM RIGHT o : l t= � n, O
204.00' o OF WAY OF I,j t 7 j d
7 I I,j I N.C. HIGUWAY I I (0I
d I I � 1 NO. 101 0 l (0 I N
O O
a L�J z
�• j I
io y T— wo
T T 1 �� I T T- -0---L- T-
K o
01 OIO
O � �
id I i OVERH 1AD ELECTRIC TRANSMISSION LI, ES
`1 I I 1
T I
40.00' T LT N
N. C. HIGHIATAY
SITE
'� I Y MAP
to Scale
N0. 101,
Paved — Public — 60.0' Right of Way
S T T E 1) A T A 1
Zoning: ivone
Tay; Parcei: 6470.03 43 1426
Area In Tract: 22.443 Acres
Utilities: lni!ivld\aal Trolls and
Septic Tanks
Minimum Building Setback Lines;
Front: 40.0' Sides: 10.0'
Rear: 75.0" A.E.C. Lne
f
CENTERLINE
�, , i•, IS PROPERT
100
-:7- GRAPHIC
COr•,m,St ioti
C R E E K
CLASCO'
NOTE: TO CONTACT OWN
Ixa:-lo <, e To;; nsn:p
Tieing ino Eastern
of the Survey foi
%r.,i. Hardesty, October 15, 1
� r _ �/`.
���