Loading...
HomeMy WebLinkAbout20772_NC DOT_19990212r CAMA AND DREDGE AND FILL GENERAL=``'�``�� 0 PERMIT as authorized by the State of North Carolina s MA� �� Department of Environment, Health, and Natural Resources and the CoastResu ommission in an area of environmental concern pursuant to 15A NCAC Applicant Name Phone Number Address City State Zip Project Location (County, State Road, Water Body, etc.) /10 Type of Project Activity PROJECT DESCRIPTION SKETCH (��� (SCALE: Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other ems' L�-Y This permit is subject to compliance with this application, site 1 j — drawing and attached general and specific conditions. Any 1 ~ I —r— f these terms may subject the ermittee to a fine violation o t y 1 p imprisonment the to be �— --i-- applicant's signature or civil action; and may cause permit come null and void., This permit must be on the project site and accessible to the permit officer's signature permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local issuing date expiration date ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. attachments In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee Management Program. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public X Private b. Type of bridge (construction material) steel -reinforced concrete cored slab c. Water body to be crossed by bridge Middletown Creek d. Water depth at the proposed crossing at MLW or NWL +/- 4.5 feet e. Will proposed bridge replace an existing bridge? X Yes No If yes, (1) Length of existing bridge 46.5 feet (2) Width of existing bridge 25 feet (clear rdwy) (3) Navigation clearance underneath existing bridge 5' vertical; 10-15' horizontal (4) Will all, or a part of, the existing bridge be removed? (Explain) all to be removed g. Length of proposed bridge 75 feet h. Width of proposed bridge +/- 27 feet (clear rdwy) Height of proposed bridge above wetlands No wetlands present Revised 03195 j. Will the proposed bridge affect existing water flow? X Yes No If yes, explain Increase flows: One less bent in the channel will provide less obstruction for flows k. Navigation clearance underneath proposed bridge 5 feet (vertical); +1- 35 feet (horizontal) I. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X Yes No If yes, explain New structure will increase horizontal opening due to less bents in water m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. Form DCM MP-5 3. EXCAVATION AND FILL c. Will the placement of the proposed bridge or culvert require any highground excavation? X Yes No If yes, (1) Length of area to be excavated +/-20'(x 2) (2) Width of area to be excavated +/- M (3) Amount of material to be excavated in cubic yards + /- 130 cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following; (1) Location of the spoil disposal area Some will be used on -site + NCDOT-owned Waste Site in Engelhard (SR 1316) (2) Dimensions of spoil disposal area + /- 1.0 acre (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. (4) Will the disposal area be available for future maintenance? X Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled +1-180 feet (2) Width of area to be filled +/- 40 feet (3) Purpose of fill elevate roadway; shoulder & slope fills; backriU of endbents Revised 03/95 Form DCM-MP-5 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project utre the relocation of any existing utility lines? _T Yes *X— No j! If ;=etail ra r,, „� IA IfOf r G GA S c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Stringent application _ .of NCDOT's Best Management Practices for the protection of surface waters f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? _Crane, excavator, dump trucks g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? X Yes No If yes, explain in detail, rip rap stone (class II) Will be used around embankment M. Randall Turner Applicant o roject Napte M, f4l�t Z?//- 7; %'nature February 9,1999 Date Revised 03/95 Nyde Ca nfy Airpoj 16 173E s lilj ♦� 'r 21 x. \ 55 u !i3 �{I 54 12LI K E E T ' F 52 ® 6 Ergelhord t G IF C` 11Il2 tt 1 IQ )' l ll4t bhr �oinl - Ls i1 1, — .! Amity I114 LM 1lQZ I ' .2p,..' lake landhp II jjll • MiddleFI 1.1 uls D l i 1J.!Q .e 13 a e IIa 1U1 L114 ; lloi 1 11JQ !`y 1119 II .e } .F.J b Ull Nebr rko lid 14 •7,!2 _112 Owe ! 169 !{„ 9 l _Y— illy \ ) e 1 1i41 I r� ) ilpa WYESOCKlNG BAY MIDDLETOWN NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: Hyde PROJECT: Replace Bridge No. 12 DATE; February 9 1999 SUBJECT: Vicinity Map SCALE: NTS SHEET: 1 of 3 AN X /0 3 i- FICO R� � l�) Z q-f,S `TJ\ � c. I T y. 416 —'� 7 9 09 WAP — �STA.lo+2Z5 IG�Z4, ��So ��eRoEEx- 0DO Wy�L=�4(o`i Iss 0ED Rti�As►.! �x,ST. Q�.1Kt��Ao� NORTH CAROLINA DEPARTMENT OF TRANSPORTATION COUNTY: HYDE PROJECT: Replace bridge # 0 t'j- SUBJECT: Plan&X-sec SCALE: 1 so' Noe. SHEET: of JER}•