HomeMy WebLinkAbout55044_IRELAND, JACKIE_20091120❑ CAMA / ❑ DREDGE & FILL
GENERAL PERMIT Previous permit #
[:]New'❑Modification ❑P
Com lete Reissue ❑Partial Reis ue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resou c s .1-7
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Applicant Name
)r, C I '
j
Address
City `� i r;rn �„ State zlP - J
Phone # (`''�"�) '�
�l ' � Pax #
Co
Authorized Agent
` j_"",`�.( i '� /i ,
Affected ❑ CW
❑ EW ❑-PTA iNLES ❑ PTS
AEC(s): ElOEA
ElHHF ElIH ❑ USA ElN/A
❑ PWs:
❑ FC:
ORW: yes / no
PNA yes / no Crit.Hab. yes / no
Type of Project/ Activity /,-, ( ' ! K. I`+ 41,i
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
n
Project Location: County 9 "• fI; ! ,+ L G�
Street Address/ State Road/ Lot #(s)` ;
I
r.4 r1f"i!Q �T'r krY
_i
Subdivision
City zip f(1
Phone # ()---f'� River Basin
Adj. Wtr. Body~ (cf� (_. (f "A_ 3-0/man /unkn)
Closest Maj. Wtr. Body i ue
max distance offshore
Basin, channel - -N - - -- - - S l '" _? c
��
cubic yaras-_
Boat ramp _
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length / C--c
SAV: not sure yes
Sandbags: not sure yes Dn/
Moratorium: n/a yes 4
Photos: yes
Waiver Attached: t' Yes no —
A building permit may be required by:
Notes/ Special Conditions !
1
� f
VC i
i'
Agent or Applicant Printed Name Permit
,i
Signature Please read compliance statement on back of permit Issuing'
r • ,..1
Application Fee(s) Check # Local P
XSee note on back
(Scale: )
r4piranon vau
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar- Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
Date // // r/a
Applicant Name V
Mailing Address
/V- !/ef 2.)
C
I certify that I have authorized (ages to act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or cot
at (location)
This certification is valid thru (date)
Signature
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastaimanagement.net
An Equal Opportunity t Affirmative Action Employer— 50% Recycled 110°% Post Consumer Paper
CERTIFIED MAIL — RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER
FORM
Name of individual applying for the permit:✓-G7 /% ,JCL /fi��
Address of
property:
-
(Lot or street#, street of road)
(C'ty county)
I hereby certify that I own property adjacent to the above referenced property. The
individual applying for this permit has described to me (as shown on the attached
drawing) the development they are proposing. A description or drawing, with
dimensions, should be provided with this letter.
I have no objections to this proposal
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808-2808
within 10 days of receipt of the notice. No response is considered the same as no
objection if you have been notified by Certified Mail.
Waiver Section
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or
sandbags must be set back a minimum distance of 15' From my area of riparian
access unless waived by me. (If you wish to waive the setback, you must initial the
appropriate blank below.)
1 do wish to waive the 15' setback requirement
I do not wish to waive the 15' setback requirement
Signature
Print Name
U -S 'A
Telephone number with area code
Date
CERTIFIED MAIUL - RETURN RECEIPT REQUESTED
DIf7ISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAWER
FORM
Name of individual applying for the permit:
Address of property:
(Lot or streetf#, street or road)
r & unty)
I hereby certify that I own property adjacent to the above referenced property. The
individual applying for this permit has described to me (as shown on the attached
drawing) the development they are proposing. A description or drawing, with
dimensions, should be provided with this letter_
,f
I have no objections to this proposal
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808-2808
within 10 days of receipt of the notice. No response is considered the same as no
objection if you have been notified by Certified Mail.
Waiver Section
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or
sandbags must be set back a minimum distance of 15' From my area of riparian
access unless waived by me. (If you wish to waive the setback, you must initial the
appropriate blank below.)
I do wish to waive the 15' setback requirement
I do not wish to waive the 15' setback requirement
Signature Date
c'
Print Name
Telephone number with area code
I
06
,S7 �
cP-cam C�
UL- 6 c6L
6XI
s
/��/ 1?41�f
NCDENR
n, _ o
nf�,nrr J,nT^# �'�1'�'' r Qi
Division iaf ;oasial 'vlaragemer,
8e'/eriy vies Jef u. James H. Giec�SOr eei^,^n
Governor Director Secre ir\j
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.
Pre -project site conditions:
6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
G Ovo
Agen or Applicant Printed Name Permit Officer's Si nature
09
Agen r Applicant Signature Issue Da e
zml
CAMA GENERAL PERMIT #: :�_ 0
Washington Office Morehead City Office Mlle
943 Washington Square Mail 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557 NorthCarolina
Phone 252-946-6481 Phone 252-808-2808 ��tlfr�ill�
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 0912009
BOBBY CAHOON
MARINE CONSTRUCTION AND LAND DEVELOPMENT
DBA BOBBY CAHOON CONSTRUCTION, INC.
6003 NEUSE RD.
GRANH (BO) O,�N 618529
P
PAY TO THE I V
ORDER OF N
5,5644C--,-,
WACHOVIA BANK, NA
BAYBORO, NC 28515
66-21/530
11800 7 S801I■ i:0 S 3000 2 L 91: 20000 17 68 48 281I'
7580
DOLLARS n