HomeMy WebLinkAboutGeneral Permits (7663)CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to: 15 NCAC Subchapter 7K .0201
Applicant Name % "fit` 11'fo �1li�` `� 1 Phone Number
Address 1 c'.0 / cI-!,, .
City "h State ' Zips
Project 4-9cation,SCounty State Road, Water Body, etc.)
Type and Dimensions, of Project lip,
� r�-.�.�-
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K :0201 This exemption to
CAMA permit requirements does not•al`Wiate the necessity of
your obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
I SKETCH (SCALE: A/ / ) I
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
ure
LAMA UMclal's signature
6hA
Issuing date
,-'%.
Expiration date`"
Attachment: 15 North Carolina Administrative Code 7K-.0203
MONITORING & COMPLETION REPORT
[CAMA Major Development & State Dredge & Fill Permits]
PERMITTEE' S NAME: c, c v e s PERMIT # S� -�-
LOCATION: `�'�U C— Me rG` D(-, FIELD REP. ;Q
MONITORED BY go(-N
PHONE: C DATE REPORTEDLY COMPLETE: o o
DATE OF INSPECTION Q bQ �6%
1) Do t easured dimensions of the development differ from those indicated in the permit and workplat?
YES N circle one].
COMMENT:
2) SEDIMENTATION & OSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all
disturbed areas? YES/ O -- l ircl S S�� I
e one] \
COMMENTa n..n �,,r) L, A4 IA;a 0 �A Tu nC � .. , �Q Q Ch - c 1
3) FUTURE MONITORING & ENFORCEMENT ACTION: Is further investigation or enforcement action
needed? YES/ O [circle one].
COMMENT: