Loading...
HomeMy WebLinkAbout52677_MINNESOTT LANDING LLC. & HASDAD, MIKE_20081203icAMA / ❑ DREDGE & FILL GEkJERAL PERMIT Previous permit # ❑New ❑Modification r IComplete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name Project Location: County Address Street Address/ State Road/ Lot #(s) City __ StateZIP Phone # ( ) Fax # (} Subdivision Authorized Agent City 1 ZIP_ Affected EJ CW Cl EW ❑ PTA ElES ❑ PTS Phone # ( ) River Basin / AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body _ (nat /man /unkn) ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab, yes / no Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length l 5 x Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards_ Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions Agent or Applicaht Printed Name Signature Please read compliance statement on back of permit ** ❑ Rules attached. (Scale: / ) .l See note on back regarding River Basin rules. Permit Officer's Signature / IssuingDate Expiration Date Application Fee(s) Check # Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 9 10-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 s• No�A Caraiinr Denaat,ment of Envicon—, ,er.t end Natural Res urCes C`. - "Iffio S. `anals, Dir,- 'or ii`r4, L _ Fcss J•.. Date O Q$_ c Applicant Nar.'_e i4Taiiiatg Address ,�vr1IAA� to act on my behalf, : s$ ^ pazrprjse ,i' a piyin- fog and ro tainkag all CAIAIA. I'e-;nits necessary to stc Ed or constrm-t ( cc vi -i/i at (location) ( Viis, certitac!o io a as all ,, a' e'ea (date 10 z Sinrature 400 Commerce Avenue: Morehead Cb, MOrth Cambria 28557 Phone: 252-808-28081 FAX: 252-247-3330 t Intemet: www.nccoastalmanagement.net An Equal CppodunrpI N Alf!imati,,e A,ctior Employer— 50% Rest//tlPai 1 ?o% Post Consumer Paper Page 1 of 1 LEGDESCI SR 1123 N/S-MOBILE HOME PK LEGDESC2 PCA 128-4 TOTACRES 10.65 CRNTTOTUSE 0 CRNTTOTOEF 110 ilCRNTLANDVA 1133076 CRNTBLDGVA 110 CRNTOBLDGV 79844 TOTCRNTVAL 112920 IFIRECODE JJA IIHOUSECODE 1 [SEWERCODE i SALEAMNT 330000 SALEDATE 7/5/2002 SALEDATE2 1173,603 SALECODE I S ROADNUM 1123 -IIPCTCOMP 100 WILLBOOK 110 WILLPAGE 0 DB_PG 381 /223 DEED BOOK 381 DEEDPAGE 223 PLAT -I -132 II MOBHOME 1131 I http://www2.undersys.com/scripts/testadv/usiwebpc.dll/usi?fonnis=ptmap&MouseX=488... 11 /5/2008 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILEVGSIBOATLIFTBOATHOUSE) I hereby certify that I own property adjacent to MZuZ- 7i- Nt�i f LL& (Name of Property Owner) property located at } C flo to i 2q �a' (Lot, Block, Road, etc.) on �ySe , in nmN (Waterbody) (Town and/or Coun ) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatUdboathouse must be set back a minimum distance of fifteen feet (15) from my area of riparian -access unless - waived by me. I do not wish to waive the setback requirement. 1/ I do wish to waive that setback requirement. ~r DESCRIPTION AND/OJ DRAWING OF PROPOSED DEVELOPMX�T: (To be filled in by individual proposing development) I AZC Signature / Print or Type Name Telephone Number Date: 3 ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: % / ' � .L N/UZSqOTF �y-40W - r . C o G.Ar2U1n% 1�.4 Rf\a� /a030 AX 140JY 3o(�, A. Sig�tu e � zyl ih A. Agent Addressee B. � ce' d by Ponied me),, C. Date of Dell'iv�ry M I A; j 5�j/11I I( ! T Try, D. Is delivery addresh different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type ❑ Certified Mail 0 Express Mail ❑ Registered ❑ Return Recelpt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7004 0750 0002 3353 2944 (Transfer from service label) - PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 U.S. Postal ServiceTM CERTIFIED MAIL. RECEIPT (Domestic Mail Only; No Insurance Coverage Provided) For delivery information visit our website at www.usps.com,., _ r I or =::-:��. State,, PS Form 3800. June 2002 See Reverse for Instnictions 6528 BROAD CREEK CONSTRUCTION 66-112/531 PH.252-745-4252 11 CREEKVIEW CT MERRITT, NC 28556-9572�� 1 Fearurek Olt ki;e on Bknk. 1 BRANCH BANKING AND TRUST COMPANY 1-;.-BANK BBT BBT.com A t� A��f1L4� f�-y fynn 7,e l i:053 ID 112 0:0005 29 2784 nzrantl Clarke - - .. moo, G Michael F. Easley, Governor DLE r William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Chuck Wakild, Deputy Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER ACCESS A riparian buffer authorization is required for an approved access way through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have a Buffer Authorization from the DWQ as long as the project can meet ALL of the conditions listed below. If ALL of the avoidance and minimization guidelines listed below cannot be met, a separate buffer authorization request must be submitted using a Pre -Construction Notification (PCN) application to DWQ at the address below. A PCN application may be obtained on the DWQ site http://h2o.enr.state.nc.us/wetlands.htm1. Any questions regarding this process should be directed to the wetland/buffer staff of the DWQ in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central Office at 919-733-6893. A written authorization from DWQ MUST be received prior to any construction activities in the riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior -to construction Wor land clearing shall subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. ❑ Pier access must cross the riparian buffer perpendicularly (which is defined as between 75 and 105 degrees). The alignment should also be located to minimize the removal of woody vegetation to the greatest extent practicable. ❑ Walkway/access shall be made of pervious materials like open -slatted wood, mulch, or grass. The use of impervious materials like concrete, pavers, or gravel will require a PCN review and a separate Buffer Authorization. A request for an impervious walkway shall include a justification of need. ❑ The width of the access is limited to six (6) feet or less. A width of greater than 6 feet wide shall require a PCN review and a separate Buffer Authorization. A request for an access greater than 6 feet shall include a justification of need. ❑ Please submit a project map of your property indicating the location of the pier and any requested walkway/access. North Carolina Division of Water Quality Intemet: www.ncwaterguality.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper NorthCarolina Naturally Page 2 This Buffer Authorization is not considered approved until the DWQ has received both this signed form AND the project map. Submit the requested information to: Division of Water Quality Attn: Surface Water/Buffer Program 943 Washington Square Mall Washington, NC 27889 By your signature below you agree to be held responsible for meeting ALL of the above listed conditions and verify that all information is complete and accurate. Please be aware, violations of the above -listed conditions are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000.00) per violation per day. ture CAMA General Permit Number: e�;Z6 ;7 �> c North Carolina Division of Water Quality Internet: www ncwaterqualitv.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Date Nne orthCarohna Nati(rally '1-`1,�"Q Michael F. Easley, Governor William �O �_G G. Ross Jr., Secretary � North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director 5 w Chuck Wakild, Deputy Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar - Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have a Buffer Authorization from the DWQ only if the project can meet ALL of the conditions listed below. If ALL the avoidance and minimization guidelines described below cannot be met, a separate buffer authorization request must be submitted using a Pre -Construction Notification (PCN) application to DWQ at the address below. A PCN application may be obtained on the DWQ web site http://h2o.enr.state.nc.us/wetlands.htm1. Questions regarding this process should be directed to wetland/buffer staff of the DWQ in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central Office at 919-733-6893. A written authorization from DWQ MUST be received prior to any construction activities in the riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to construction &/or land clearing shall subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. o Minimize removal of woody vegetation in Zone 1 to what MUST be removed for the installation of the shoreline stabilization project. Zone 1 begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward. Unnecessary clearing is a violation of the riparian buffer rules and may result in a civil penalty assessment of up to $25,000 per day per violation. ❑ The property owner is responsible for site restoration of woody vegetation. Pre -project site conditions MUST be re-established. A site that was wooded prior to this shoreline stabilization project MUST be restored with native hardwood trees at a stem density of 320 trees per acre. Hardwood restoration must be completed by the first subsequent planting season (November 1 through March 30). ❑ Disturbance in Zone 2 of the riparian buffer, which begins at the landward edge of Zone 1 and extends 20 feet is restricted to uses listed under 15A NCAC 2B .0233(4)(b) & (6), and 15A NCAC 2B.0259(4)(b) & (6). Clearing and grading of Zone 2 is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused flow of storm water runoff through Zone 1. North Carolina Division of Water Quality Internet: www.ncwaterquality.org One 943 Washington Square Mall Phone: 252-946-6481 NorthCarolina Washington, NC 27889 FAX 252-946-9215 Naharally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Page 2 ❑ For vertical shoreline stabilization projects (bulkhead) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward from the structure may be maintained as a stable lawn in order to provide for structural stability. This certificate condition is intended to apply only to projects adjacent to larger water bodies where the conditions may routinely produce severe overwash. ❑ Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored, see the first condition of this authorization. ❑ When restoration is required Please submit a project map of your property indicating the area to be restored, and a restoration plan. The DWQ website (Helpful links), hftp://h2o.enr.state.nc.us/ncwetlands/RiparianBufferRules.htm may be helpful in the preparation of the restoration plan. This Buffer Authorization is not considered approved until the DWQ has received both this signed form AND the project map. Submit the requested information to: Division of Water Quality Attn: Surface Water/Buffer Program 943 Washington Square Mall Washington, NC 27889 By your signature below you agree to be held responsible for meeting ALL of the above listed conditions and verify that all information is complete and accurate. Only the property owner is responsible for the second condition. Please be aware, violations of the above -listed conditions are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000) per violation per day. s Signa CAMA General Permit Number: a /3 6�2_ �a 7 ;�7 C_ North Carolina Division of Water Quality Internet. www.ncwateroualitv.or� 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Date Nne orthCarolina