HomeMy WebLinkAbout56349_HADAD, CATHY_20100921&t;AMA / DREDGE & FILL
�. GENERAL PERMIT
)QNew ❑Modification El Complete Reissue
11-1�-101� N.o
56349c
Previous permit #
El Partial Reissue y r PV Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC r% (U�>
EA Rules attached.
Project Location: Coun +'y.yt�.
Applicant Name 1 tY
Address ` Street Address/ State Road/ Lot #(s)
A211 i
City� ' � Lt'1 State N�. ZIP �ht
Phone # (j(�Z) 2,$"6 -,SC► K Fax # () Subdivision (G,
Authorized Agent cJ r iIi, 0 City NvV LI/N ZIP
Affected ❑Cw ❑Ew 14 TA DES VTS Phone # ( ) River Basin 1 VLv;'L
AEC(s): ❑ oEA ❑ HHF ❑ IH ❑ USA ❑ N/A Adj. Wtr. Body ^�r' r' C a man unkn
❑ Pws: ❑ Fc: J t f-
Closest Maj. Wtr. Body
ORW: yes / no�' PNA yes / no Crit.Hab. yes / no
,
■■■
■■
■■■
iw■i
Mr. 0
■■a■■■■■■��■■■■■_■
• __
.
:.■■�'<`7■W■W��'�[�.'�lll7'f
■■■■■
■■
Simpmum�■■■■■■11■■■�■■_
■■�i■■���r�■■
+
ME
MEN
'1�1.7■■■■■
■
111:■■■
■■
.!■■■�,�■■
■■■■■■
■■■■■■■■■■■■■■NN�1■
..■■..■..SON
.....�.■..
NJ
No
MINNINEMEMILIM
I
No
0
N
0
SIMMMEIP-10
■■■::
■■'
E
.■
■'
:■:
FaINE.■■■■
N:■■■■■■.■
�■■IN■o■■1r�.■■■■■■
■MEN
■�■■■■■■■■■■&1!�ir�-!•f1�
■..■.....■MEMO
...........■■■...■■■■■■■
■■■
■■■■■■■■■■■
...: ■■■■
ENE
Ke I=., -
■ .■■■■
■■■■■■■..■
0
■■■[�I4�1■■■■■■■■■■■■■■■■
■
INKUWAr.
OEM ■■ .■...■■■■■■■.....■■
■■■■■■■■■■■
SON
i\■►V■■■■■■■■■■■■■■■■
ils 0
■®■■■■■■No
■..
■■■■■■■■■■■
ON M EMMONS
■■■■■�■■■NOMIipi�11�1��Iqp III
0 K
i
Agen r Applicant Printed Name Permit Officer's Si re
Signature* Please read compliance statement on back of permit
/Issuing Date Expiration Date
�
Application Fee(s) Check # Local Plannindurisdiction Rover File Name
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary
September 24, 2010
Foley Contractors
PO Box 3482
New Bern, NC 28564
Dear Mr. Foley:
Attached is General Permit #56349C to install (2) 5x2x2 Riprap at 211 Appenzell Lane in
(Taberna) in New Bern, NC.
Also, enclosed is two Buffer Authorization Certificate for Shoreline Stabilization, please sign
and print your name as indicated and return one in the enclosed, self-addressed envelope.
In order to validate this permit, please sign the permit as indicated. Retain the white copy for
your files and return the signed yellow and pink copies to us in the enclosed, self-addressed
envelope. If the signed permit copies are not returned to this office before the initiation of
development, you will be working without authorization and will be subject to a Notice of
Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sincerely,
y
Barry Guthrie
Coastal Management Representative
lsb
Enclosures
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper
11
NCDENR
North Carolina Department of Environment and Natural Pesoiurces
Division of Coastal l ianagement
Beverly Eaves Perdue James H. Gregscn Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone i (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed. _
• Pre -project site conditions: ( );`c,-f
s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
I
Agent r Applicant Printed Name Permit Offif 's Signature
CNlj
gent or Applicant Signature Issue Date
CAMA GENERAL PERMIT #:�;)
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue One
Washington, NC 27889 Morehead City, NC 28557 NorthCarolina
Phone 252-946-6481 Phone 252-808-2808 ���������
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 0912009
NC Division of Coastal Mgt. Habitat Impact Computer Sheen
Applicant: Cathy Hadad
Date: 9/24110
Permit #: 56349C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
High Ground
Dredge O Fill O Both ❑ Other 0
20
20
Dredge ❑ Fill O Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
North Carolina Department of Environment Resources
Division of Coastal Management
Charles S. Jones, Director
Michael F. Easley, Governor
Date August 18, 2010
Applicant Name Cathy Hadad _
Mailing Address Appenzell Ln
New Bern, NC 28560
I certify that I have authorized (agent)_Foley Contractors, LLC to act on my
behalf, for purpose of applying for and obtaining all CAMA Permits necessary to
install of construct (activity) Rip Rap
at (location) Same
This certi
Signature
William G. Ross Jr., Secretary
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-828-2808/ FAX: 252-247-3330/ Internet: www.nccoastalmanagement.net
An Equal Opportunity/ Affirmative Action Employer-50%Recycled/10% Post Consumer Paper
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(Bulkhead/rip rap)
I hereby certify that I own property adjacent to Cathy Hadad 's
(Name of Property Owner)
Property located at_ 211 App mzell Ln 2-6 6, Le 4
(lot, block, road, etc.)
on Brices Creek . in New Bern/Craven ,
N.C.
(Water body) (Town and/or County)
He has described to me as shown below, the development he is proposing at the
location, and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(to be filled in by individual proposing development)
3R=ems 6-arirk
}-14w
{Y
�VI IX
(Applicant Information)
211 A.ppenzell Ln
Mailing Address
New Bern, NC 28560
City/State/Zip
_252-288-5918
Telephone Number
Julv 21, 2010
Date
Foley Contractors, LLC-
252-229-6467
dan@foleycon tractors-com
(Riparian Property Owner Information)
�.L — /.-A v ►J
lg�nae
Print or Type Name
Telephone Number
Date
key
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(Bulkhead/rip rap)
I hereby certify that I own property adjacent to Cathy Hadad 's
(Name of Property Owner)
Property located at_ 211 Appenzell Ln ,
(lot, block, road, etc.)
on _ Brices Creek , in New Bern/Craven ,
N.C.
(Water body)
(Town and/or County)
He has described to me as shown below, the development he is proposing at the
location, and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(to be filled in by individual proposing development)
c.17 (I CN-5fle
i2 ty►si,NS
)3,1 l k4 i a,�
(Applicant Information) (Riparian Property
211 Appenzell Ln
Mailing Address
New Bern, NC 28560
City/state/zip
252-288-5918
Telephone Number
Julv 21. 2010
Date
Foley Contractors, LLC.
252-229-6467
dan@foleycontractors.com
Print or Type Name
Telephone Number
Date
Pd&
2161�)G�