Loading...
HomeMy WebLinkAbout56349_HADAD, CATHY_20100921&t;AMA / DREDGE & FILL �. GENERAL PERMIT )QNew ❑Modification El Complete Reissue 11-1�-101� N.o 56349c Previous permit # El Partial Reissue y r PV Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC r% (U�> EA Rules attached. Project Location: Coun +'y.yt�. Applicant Name 1 tY Address ` Street Address/ State Road/ Lot #(s) A211 i City� ' � Lt'1 State N�. ZIP �ht Phone # (j(�Z) 2,$"6 -,SC► K Fax # () Subdivision (G, Authorized Agent cJ r iIi, 0 City NvV LI/N ZIP Affected ❑Cw ❑Ew 14 TA DES VTS Phone # ( ) River Basin 1 VLv;'L AEC(s): ❑ oEA ❑ HHF ❑ IH ❑ USA ❑ N/A Adj. Wtr. Body ^�r' r' C a man unkn ❑ Pws: ❑ Fc: J t f- Closest Maj. Wtr. Body ORW: yes / no�' PNA yes / no Crit.Hab. yes / no , ■■■ ■■ ■■■ iw■i Mr. 0 ■■a■■■■■■��■■■■■_■ • __ . :.■■�'<`7■W■W��'�[�.'�lll7'f ■■■■■ ■■ Simpmum�■■■■■■11■■■�■■_ ■■�i■■���r�■■ + ME MEN '1�1.7■■■■■ ■ 111:■■■ ■■ .!■■■�,�■■ ■■■■■■ ■■■■■■■■■■■■■■NN�1■ ..■■..■..SON .....�.■.. NJ No MINNINEMEMILIM I No 0 N 0 SIMMMEIP-10 ■■■:: ■■' E .■ ■' :■: FaINE.■■■■ N:■■■■■■.■ �■■IN■o■■1r�.■■■■■■ ■MEN ■�■■■■■■■■■■&1!�ir�-!•f1� ■..■.....■MEMO ...........■■■...■■■■■■■ ■■■ ■■■■■■■■■■■ ...: ■■■■ ENE Ke I=., - ■ .■■■■ ■■■■■■■..■ 0 ■■■[�I4�1■■■■■■■■■■■■■■■■ ■ INKUWAr. OEM ■■ .■...■■■■■■■.....■■ ■■■■■■■■■■■ SON i\■►V■■■■■■■■■■■■■■■■ ils 0 ■®■■■■■■No ■.. ■■■■■■■■■■■ ON M EMMONS ■■■■■�■■■NOMIipi�11�1��Iqp III 0 K i Agen r Applicant Printed Name Permit Officer's Si re Signature* Please read compliance statement on back of permit /Issuing Date Expiration Date � Application Fee(s) Check # Local Plannindurisdiction Rover File Name NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary September 24, 2010 Foley Contractors PO Box 3482 New Bern, NC 28564 Dear Mr. Foley: Attached is General Permit #56349C to install (2) 5x2x2 Riprap at 211 Appenzell Lane in (Taberna) in New Bern, NC. Also, enclosed is two Buffer Authorization Certificate for Shoreline Stabilization, please sign and print your name as indicated and return one in the enclosed, self-addressed envelope. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, y Barry Guthrie Coastal Management Representative lsb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper 11 NCDENR North Carolina Department of Environment and Natural Pesoiurces Division of Coastal l ianagement Beverly Eaves Perdue James H. Gregscn Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone i (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. _ • Pre -project site conditions: ( );`c,-f s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. I Agent r Applicant Printed Name Permit Offif 's Signature CNlj gent or Applicant Signature Issue Date CAMA GENERAL PERMIT #:�;) Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue One Washington, NC 27889 Morehead City, NC 28557 NorthCarolina Phone 252-946-6481 Phone 252-808-2808 ��������� An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Version 5, 0912009 NC Division of Coastal Mgt. Habitat Impact Computer Sheen Applicant: Cathy Hadad Date: 9/24110 Permit #: 56349C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount High Ground Dredge O Fill O Both ❑ Other 0 20 20 Dredge ❑ Fill O Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ North Carolina Department of Environment Resources Division of Coastal Management Charles S. Jones, Director Michael F. Easley, Governor Date August 18, 2010 Applicant Name Cathy Hadad _ Mailing Address Appenzell Ln New Bern, NC 28560 I certify that I have authorized (agent)_Foley Contractors, LLC to act on my behalf, for purpose of applying for and obtaining all CAMA Permits necessary to install of construct (activity) Rip Rap at (location) Same This certi Signature William G. Ross Jr., Secretary 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-828-2808/ FAX: 252-247-3330/ Internet: www.nccoastalmanagement.net An Equal Opportunity/ Affirmative Action Employer-50%Recycled/10% Post Consumer Paper ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (Bulkhead/rip rap) I hereby certify that I own property adjacent to Cathy Hadad 's (Name of Property Owner) Property located at_ 211 App mzell Ln 2-6 6, Le 4 (lot, block, road, etc.) on Brices Creek . in New Bern/Craven , N.C. (Water body) (Town and/or County) He has described to me as shown below, the development he is proposing at the location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (to be filled in by individual proposing development) 3R=ems 6-arirk }-14w {Y �VI IX (Applicant Information) 211 A.ppenzell Ln Mailing Address New Bern, NC 28560 City/State/Zip _252-288-5918 Telephone Number Julv 21, 2010 Date Foley Contractors, LLC- 252-229-6467 dan@foleycon tractors-com (Riparian Property Owner Information) �.L — /.-A v ►J lg�nae Print or Type Name Telephone Number Date key ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (Bulkhead/rip rap) I hereby certify that I own property adjacent to Cathy Hadad 's (Name of Property Owner) Property located at_ 211 Appenzell Ln , (lot, block, road, etc.) on _ Brices Creek , in New Bern/Craven , N.C. (Water body) (Town and/or County) He has described to me as shown below, the development he is proposing at the location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (to be filled in by individual proposing development) c.17 (I CN-5fle i2 ty►si,NS )3,1 l k4 i a,� (Applicant Information) (Riparian Property 211 Appenzell Ln Mailing Address New Bern, NC 28560 City/state/zip 252-288-5918 Telephone Number Julv 21. 2010 Date Foley Contractors, LLC. 252-229-6467 dan@foleycontractors.com Print or Type Name Telephone Number Date Pd& 2161�)G�