Loading...
HomeMy WebLinkAbout52610_GRIFFIN, DON_20080917FJ CAMA / 0 DREDGE & FILL GENERAL. PERMIT revious permit # EINew ElModification [-]Complete Reissue ElPartial Reissu' Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resour VsE D" ) and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC El Rules attached. Applicant Name r Address City Qw.r V1_ State ZIP es- 1 33- VW--,,, Phone# ' ) `6 , Fax Authorized Agent &D b. C rA,uti 0 ova Affected El CW Ll EW D PTA El ES 0 PTS AEC(s): [I OEA '-jHHF EIIH D UBA El N/A El PWS: El FC: ORW: yes / no PNA yes / no Crit.Halb. yes / no Project Location: County Street Address/ State Road/ Lot #(s) f Subdivision it - iC r City f ck-cr ZIP Phone# River Basin Adj. Wtr. Body ,"(n-a't*N/man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity (Scale: Pier (dock) length —c,-- Platform(s) Finger pier(s) 3 Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel 7 F 7 cubic yards_ Boat ramp Boathouse/ Boatlift k J, L+1 Beach Bulldozing Other 7- Shoreline Length SAV: not sure yes .,ag� Sandbags: not sure yes Moratorium: n/a yes Photos: yes Waiver Attached: yes A building permit may be required by: Notes/ Special Conditions rules. I See note I)./- r,4� on back regarding River Basin Agent or Applicant Printed Name Signature Please'read compliance statement on back of permit Application Fee(s) Check—# P40-nit Officer's Signature 7- 08 Issuing Date Expiration Date CcCo Loll ? / YA Local Planning jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 �i Michael F. Easley, Governor rj r� William G. Ross Jr., Secretary > North Carolina Department of Environment and Natural Resources O C Coleen H. Sullins, Director Chuck Wakild, Deputy Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER ACCESS A riparian buffer authorization is required for an approved access way through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0233 & .0259. Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have a Buffer Authorization from the DWQ as long as the project can meet ALL of the conditions listed below. If ALL of the avoidance and minimization guidelines listed below cannot be met, a separate buffer authorization request must be submitted using a Pre -Construction Notification (PCN) application to DWQ at the address below. A PCN application may be obtained on the DWQ site http://h2o.enr.state.nc.us/wetlands.htmI- Any questions regarding this process should be directed to the wetland/buffer staff of the DWQ in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central Office at 919-733-6893. A written authorization from DWQ MUST be received prior to any construction activities in the riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to construction &/or land clearing shall subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. ❑ Pier access must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees). The alignment should also be located to minimize the removal of woody vegetation to the greatest extent practicable. ❑ Walkway/access shall be made of pervious materials like open -slatted wood, mulch, or grass. The use of impervious materials like concrete, pavers, or gravel will require a PCN review and a separate Buffer Authorization. A request for an impervious walkway shall include a justification of need. ❑ The width of the access is limited to six (6) feet or less. A width of greater than 6 feet wide shall require a PCN review and a separate Buffer Authorization. A request for an access greater than 6 feet shall include a justification of need. ❑ Please submit a project map of your property indicating the location of the pier and any requested walkway/access. North Carolina Division of Water Quality Internet: www.ncwatergtialitLorg One 943 Washington Square Mall Phone: 252-946-6481 NorthCarofina Washington, NC 27889 FAX 252-946-9215 Naturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Version 1, 9-08 1 Page 2 - r This Buffer Authorization is not considered approved until the DWQ has received both this signed form AND the project map. Submit the requested information to: Division of Water Quality Attn: Surface Water/Buffer Program 943 Washington Square Mall Washington, NC 27889 By your signature below you agree to be held responsible for meeting ALL of the above listed conditions and verify that all information is complete and accurate. Please be aware, violations of the above -listed conditions are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000.00) per violation per day. Signature CAMA General Permit Number: _�Jt � -C_- North Carolina Division of Water Quality Internet: www.ncwaterquality.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Date NorthCarolina Naturally Version 1, 9-08 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIERIMMOORIIVG PILINGSBOATLIFTBOATHOUSE) I hereby certify that I own roe p p rh' adjacent to <;� / y Jam, ,s (Name of Property Owner) property located at 2 5-�4 o e Z" :7 e� X 2 i (Lot, Block, Road, etc.) (Waterbody) (Town and/or County) N•C: He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse must be set back a minimum distance of fifteen feet (15) from my area of riparian access unless waived by me. Of you wish to waive the setback, you must initial the appropriate blank below.) I do not wish to waive I do wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) We propose to furnish the labor, equipment and materials necessary to install: 7 K Tide Tamer boat lift using 9" butt x 30' piles. Remove existing piles (2) and the 10, shore to dock ramp. Install approximately 12' of 5' W ramp to existing dock We will also install 3' x 16' step down, hand rail on one side of down ramp, replace several bad boards on existing dock, check all naiLs/fasteners, and aluminum overboard ladder. Fall and remove one 6" tree and cut one stump off to ground level. Haul off all debris. Permits and administrative fees not included m this price. Signature 1-il/c Print or Type Name �j Telephone Number Date: / d 1✓ ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/11IOORIIVG PILINGS/BOATLIFTBOATHOUSE) I hereby certify that I own propertyadJacent to�G ;e /Cis -4z �— i,Ve s (Name of Property Owner) property located atr- (Lot, Block, Road, etc.) (Waterbody) (' N'C Town and/or County) j He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings / boatlift / boathouse must be set back a minimum distance of fifteen feet (15) from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do not wish to waive I do wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) We propose to furnish the labor, equipment and materials necessary to install: 7 K Tide Tamer boat lift using 9" butt x 30' piles. Remove existing piles (2) and the 10' shore to dock ramp. Install approximately 12' of 5' W ramp to existing dock. We will also install 3' x 16' step down, hand rail on one side of down ramp, replace several bad boards on existing dock, check all nails/fasteners, and aluminum overboard ladder. Fall and remove one 6" tree and cut one stump off to ground level. Haul off all debris. Permits and administrative fees not included in this price. Signature Print or Type Name Telephone Number Date: WNW North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G R Date Applicant Name Mailing Address L: ,A) . oss Jr., Secretary I certify that I have authorized (agen y P/� �C-6 to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary to install or construct (activity) &AT kr-Tr'C`� at (location) is —VI _ /ZEx&f �C_ This certificatio4k,is valid thru (date) a r-, Signature 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110%Post consumer Paper t BOBBY CAHOON WACHOVIA BANK, NA MARINE CONSTRUCTION AND LAND DEVELOPMENT BAYBORO, NC 28515 DBA BOBBY CAHOON CONSTRUCTION, INC. 66-21/530 6003 NEUSE RD. GRANTSBORO, NC 28529 PH (252) 249-1617 9/17/2008 5762 PAY TO THE NCDENR ORDER OF I $ "`200.00 Two Hundred and DOLLARS 8 NCDENR 400 Commerce Avenue Morehead City, NC 28557 1 ) . a -,-A 11§00 5 7 6 211n I:O 5 3000 2 L 91: 20000 L 7 68 48 2811' FA 19