HomeMy WebLinkAbout55702_GARERA, GARY_20100421❑CAMA / ❑ DREDGE & FILL 101 C
Previous permit #
GENERAL PERMIT ' 1-flNew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources _ i
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 711.
n Rules attached.
Applicant Name((`
Gc( P tL�
Address Pic)1�p
2. S Cl
City Q'.)
tM Statezip ��✓�
Phone # Q� Z -2,41 - 3jj(p)� Fax # ( )
Authorized Agentp
(r.�
Affected ❑ CW
❑ EW] PTA ❑ ES ❑ PTS
AEC(s): ❑ OEA
❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS:
❑ FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no
r•
Project Location: County ` Ct . r
Street Address/ State Road/ Lot #(s)
1110,1
Subdivision
City i ZIP 2.`'150
Phone # River Basin IBC o P
Adj. Wtr. Body i " (` t r 33 1
y s' !! 'nat' man unkn
Closest Maj. Wtr. Body 'y" �✓p r
�� ��
Type of Project/ Activity hr fc', N W) ,, - h � �{' � (�
rr s
(Scale: Q )
Pier (dock) length
Platform(s)
Finger
Bulk
Boat
Othe
Shor
SAV:
Sand
Waiveryes no [
A building permit may be required by: 7 yid 1ni >. f r` ❑ See note on back regardin River Basin rules.
Notes/ Special Conditions
Groin
Basin
FT
Boat
Boathouse/
Beac
Moratorium:
Photos:
pier(s)
Agent or Applicant Printed Name
Signature ** Pleasead compliance statement on back of permit **
900 1?�t146 )65%
Application Fee(s) Check #
Permit Officer's Signature
J
Issuing Date
4�y L-N
Date
,Expiration
Local Planning Jurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Morehead City Headquarters
Mailing Address:
400 Commerce Ave
1638 Mail Service Center
Morehead City, NC 28557
Raleigh, NC 27699-1638
252-808-2808/ 1-888ARCOAST
Location:
Fax: 252-247-3330
2728 Capital Blvd.
(Serves: Carteret, Craven, Onslow -above
Raleigh, NC 27604
New River Inlet- and Pamlico Counties)
919-733-2293
Fax:919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
APR-21-2010 11:26 From:DCM MHDCTY
To:96363127 Page:112
NCDENR
North Caroiina Department of Environment and Natural Pesources
Division of Coastal Management
Bevedy Eaves Percus James H. Gre9son Dee Freeman
Governor ,r Director � Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the parry (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
z. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channetized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only-, sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration_ At minimum, pre -project site Conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.
• Pre -project site conditions:
6. Project Drawing: The drawing on the LAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid In compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
Agent or Applicant Printed Name Permit O ar'-% Rinnntimm
Agent or plica Ignsture
LAMA GENERAL_ PERMIT #:--- 65 70 2— C
Issue Date
Washington Orfioc Mwehead City Office
943 Washing Square Mail 400 Commate Avenue One,
Washml,ton, NC 27899 Morchcatj City, NC 28557 One, + Q'i�til
Phone252 946-6481 Plianu 2S2-808-2808 1V
An Equal Opporh nitylnfrarrtatire Acton Employer —spy, Recycled/t(Y% Post Consumer Paper ( 6q&j7 dl`
Version 5.09l2tx7Q
....... .... ... ........ ... . .... .. ... ........ .. ........ ..........
UNITEDSTATES
..........
TV
XPOST13L SERVI
Serial Number Year, Month, Day Post Office U.S. Dollars and Cents
173'46L031588 ma-04-20 2m, $400-92
FOUR HUMORED DOLLARS & 004 **
Pay to
! JClerk
Address
Aj
Memo 10;
0 2008 U,.t,d Stl- Postal Service. All R,gh9'A,s. ---- 7-
SEE REVERSE WARNING - NEGOTIABLE ONLY IN THE U.S. AND POSSESSIONS
1:00000800 21: 17 3466 I L 5818,111
....... . .. . ....
North Carolina Department of Environment Resources
Division of Coastal Management
Charles S. Jones, Director
Michael F. Easley, Governor
b
Date —April 14, 2010
Applicant Name Gary Garera
Mailing Address PO Box 3289
New Bern, NC 28564
I certify that I have authorized (agent) Foley Contractors, LLC to act on my
behalf, for purpose of applying for and obtaining all CAMA Permits necessary to
install of construct (activity) Bulkhead ,
at (location) 1409 Brices Creek Rd
This certificatill" is valid thru
Signature :�6 f
William G. Ross Jr., Secretary
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-828-2808/ FAX: 252-247-3330/ Internet: www.nccoastalmanagement.net
An Equal Opportunity/ Affirmative Action Employer-50%Recycled/10% Post Consumer Paper
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(Bulkhead/rip rap)
I hereby certify that I own property adjacent to Gar 'Garera 's
(Name of Property Owner)
Property located at 1409 Brices Creek Rd
(lot, block, road, etc.)
on Brices Creek . in New Bern/Craven , N.C.
(Water body) (Town and/or County)
He has described to me as shown below, the development he is proposing at the
location, and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(to be filled in by individual proposing development)
(Applicant Information)
Ga Garera
Mailing Address
PO Box 3289New Bern. NC 28564
City/State/Zip
252-349-3673
Telephone Number
April 13, 2010
Date
Foley Contractors, LLC.
252-229-6467
dan@foleycontractors.com
yQ
(Riparian Property Owner Info ation)
i a e
Print or Type Name
Telephone Number
Date
I
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(Bulkhead/rip rap)
I hereby certify that I own property adjacent to Gary Garera 's
(Name of Property Owner)
Property located at 1409 Brices Creek Rd
(lot, block, road, etc.)
on Brices Creek , in New Bern/Craven , N.C.
(Water body) (Town and/or County)
He has described to me as shown below, the development he is proposing at the
location, and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(to be filled in by individual proposing det
;\A
1
(Applicant Information) (Riparian Property Owney Information)
_Gary Garera
Mailing Address ature
PO Box 3289New Bern. NC 28564
City/State/Zip
252-349-3673
Telephone Number
_April 13, 2010
Date
Foley Contractors, LLC.
252-229-6467
dan@foleycontractors.com
Print or Type Name
Telephone Number
Date
NO Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: Gary Garera
Date: 4/21 /10
Permit #: 55702C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
Shallow Bottom
Dredge 13 Fill 0 Both ❑ Other ❑
50
50
Shoreline
Dredge ❑ Fill ❑ Both ❑ Other 21
25
25
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised:02/03/10