Loading...
HomeMy WebLinkAbout55702_GARERA, GARY_20100421❑CAMA / ❑ DREDGE & FILL 101 C Previous permit # GENERAL PERMIT ' 1-flNew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources _ i and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 711. n Rules attached. Applicant Name((` Gc( P tL� Address Pic)1�p 2. S Cl City Q'.) tM Statezip ��✓� Phone # Q� Z -2,41 - 3jj(p)� Fax # ( ) Authorized Agentp (r.� Affected ❑ CW ❑ EW] PTA ❑ ES ❑ PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no r• Project Location: County ` Ct . r Street Address/ State Road/ Lot #(s) 1110,1 Subdivision City i ZIP 2.`'150 Phone # River Basin IBC o P Adj. Wtr. Body i " (` t r 33 1 y s' !! 'nat' man unkn Closest Maj. Wtr. Body 'y" �✓p r �� �� Type of Project/ Activity hr fc', N W) ,, - h � �{' � (� rr s (Scale: Q ) Pier (dock) length Platform(s) Finger Bulk Boat Othe Shor SAV: Sand Waiveryes no [ A building permit may be required by: 7 yid 1ni >. f r` ❑ See note on back regardin River Basin rules. Notes/ Special Conditions Groin Basin FT Boat Boathouse/ Beac Moratorium: Photos: pier(s) Agent or Applicant Printed Name Signature ** Pleasead compliance statement on back of permit ** 900 1?�t146 )65% Application Fee(s) Check # Permit Officer's Signature J Issuing Date 4�y L-N Date ,Expiration Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. (Serves: Carteret, Craven, Onslow -above Raleigh, NC 27604 New River Inlet- and Pamlico Counties) 919-733-2293 Fax:919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 APR-21-2010 11:26 From:DCM MHDCTY To:96363127 Page:112 NCDENR North Caroiina Department of Environment and Natural Pesources Division of Coastal Management Bevedy Eaves Percus James H. Gre9son Dee Freeman Governor ,r Director � Secretary BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the parry (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. z. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channetized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only-, sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration_ At minimum, pre -project site Conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. • Pre -project site conditions: 6. Project Drawing: The drawing on the LAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid In compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. Agent or Applicant Printed Name Permit O ar'-% Rinnntimm Agent or plica Ignsture LAMA GENERAL_ PERMIT #:--- 65 70 2— C Issue Date Washington Orfioc Mwehead City Office 943 Washing Square Mail 400 Commate Avenue One, Washml,ton, NC 27899 Morchcatj City, NC 28557 One, + Q'i�til Phone252 946-6481 Plianu 2S2-808-2808 1V An Equal Opporh nitylnfrarrtatire Acton Employer —spy, Recycled/t(Y% Post Consumer Paper ( 6q&j7 dl` Version 5.09l2tx7Q ....... .... ... ........ ... . .... .. ... ........ .. ........ .......... UNITEDSTATES .......... TV XPOST13L SERVI Serial Number Year, Month, Day Post Office U.S. Dollars and Cents 173'46L031588 ma-04-20 2m, $400-92 FOUR HUMORED DOLLARS & 004 ** Pay to ! JClerk Address Aj Memo 10; 0 2008 U,.t,d Stl- Postal Service. All R,gh9'A,s­. ---- 7- SEE REVERSE WARNING - NEGOTIABLE ONLY IN THE U.S. AND POSSESSIONS 1:00000800 21: 17 3466 I L 5818,111 ....... . .. . .... North Carolina Department of Environment Resources Division of Coastal Management Charles S. Jones, Director Michael F. Easley, Governor b Date —April 14, 2010 Applicant Name Gary Garera Mailing Address PO Box 3289 New Bern, NC 28564 I certify that I have authorized (agent) Foley Contractors, LLC to act on my behalf, for purpose of applying for and obtaining all CAMA Permits necessary to install of construct (activity) Bulkhead , at (location) 1409 Brices Creek Rd This certificatill" is valid thru Signature :�6 f William G. Ross Jr., Secretary 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-828-2808/ FAX: 252-247-3330/ Internet: www.nccoastalmanagement.net An Equal Opportunity/ Affirmative Action Employer-50%Recycled/10% Post Consumer Paper ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (Bulkhead/rip rap) I hereby certify that I own property adjacent to Gar 'Garera 's (Name of Property Owner) Property located at 1409 Brices Creek Rd (lot, block, road, etc.) on Brices Creek . in New Bern/Craven , N.C. (Water body) (Town and/or County) He has described to me as shown below, the development he is proposing at the location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (to be filled in by individual proposing development) (Applicant Information) Ga Garera Mailing Address PO Box 3289New Bern. NC 28564 City/State/Zip 252-349-3673 Telephone Number April 13, 2010 Date Foley Contractors, LLC. 252-229-6467 dan@foleycontractors.com yQ (Riparian Property Owner Info ation) i a e Print or Type Name Telephone Number Date I ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (Bulkhead/rip rap) I hereby certify that I own property adjacent to Gary Garera 's (Name of Property Owner) Property located at 1409 Brices Creek Rd (lot, block, road, etc.) on Brices Creek , in New Bern/Craven , N.C. (Water body) (Town and/or County) He has described to me as shown below, the development he is proposing at the location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (to be filled in by individual proposing det ;\A 1 (Applicant Information) (Riparian Property Owney Information) _Gary Garera Mailing Address ature PO Box 3289New Bern. NC 28564 City/State/Zip 252-349-3673 Telephone Number _April 13, 2010 Date Foley Contractors, LLC. 252-229-6467 dan@foleycontractors.com Print or Type Name Telephone Number Date NO Division of Coastal Mgt. Habitat Impact Computer Sheet Applicant: Gary Garera Date: 4/21 /10 Permit #: 55702C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Shallow Bottom Dredge 13 Fill 0 Both ❑ Other ❑ 50 50 Shoreline Dredge ❑ Fill ❑ Both ❑ Other 21 25 25 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised:02/03/10