Loading...
HomeMy WebLinkAbout56877_FRANCINCO, PETER_20101012❑CAM / 1-1DREDGE& FILL GENERAL PERMIT Previous permit # ❑New ❑Modification El Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC O Rules attached. Applicant Name_ Address City State ZIP Phone # ( ) Fax # ( ) Authorized Agent ❑ CW ❑ EW ❑ PTA Affected ❑ OEA ❑ HHF ❑ IH AEC(s): ❑ PWS: ❑FC: ORW: yes / no PNA yes / no Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/, Riprap length avgydistance offshore ¢ max distance offshore Basin, channel cubic yards_ Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length ❑ ES ❑ PTS ❑ UBA ❑ N/A Crit.Hab. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision $ ; CiZIP t Phone # I' 4 �L- 2 S J IZ, River Basin Adj. Wtr. Body r� �) r nat than: unkn Closest Maj. Wtr. Body '\"`` ' '" (Scale: l Q / r NEyy ID'X2v HOLE / 8 O O 7 0 Qi rV 10 X 25' POLEr SAV: not sure yes no Sandbags: not sure yes noo M E R I ® - Moratorium: n/a yes no (o Photos: yes no Waiver Attached: yes no - - - - A building permit may be required by: M1 N�-�V —7r4t—�-O" FOLF- \ CRANDr 0 See note on back regarding River Basin rules. Notes/ Special Conditions I or Applicant Printed Name Permit Officer's Signature Signature Please read compliance statement on back of permit Application Fee(s) Issuing Date Check # Local Planning Jurisdiction Expiration Date Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-648 [)or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 1,CAr'wIA /❑ DREDGE & FILL NY 5 6 8 7 7 C 'G E N E FOAL PERMIT Previous permit # JNew ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 7 i4, 1 10 '-1 2c 'Rules attached. Applicant Name to- ��c c1r�C t �-fi.�G+ Project Location: County_C;r .itn Address lei i5i ���c� 1 lr Street Address/ State Road/ Loth#(s) City— Cr r" 4 StateC'.> ZIP '7� j I D=Uo'nG t� C-T- Phone # ( ) Fax # (_). Subdivision • o ' r Authorized Agent Rot CZA-kCc,,' cr.r, LLC City!V1, r ZIP 1 Affected ❑CW ❑EW `XPTA El ES NPTS Phone# ("a&4) 4!�-ZiI5 River Basin (.;r AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body T's . f .�-; z :s v!• (nat an unkn ❑ PWS: ❑FC: ORW: yes /� PNA yes / Crit.Hab. yes / no Closest Maj. Wtr. Body_ :�d,�Yi +Jt " Type of Project/ Activity �,Ax , „�y�, �� — 7l"L I^i�� Pier (dock) length----- Platform(s) C Finger pier(s) _ / Groin length New iD X2j' N DL.E number ulkhea Riprap length �1 , avg distance offshore_-__ max distance offshore-0 ' Basin, channel cubic yards Boat ramp I / Boathouse/ Boatlift j Beach Bulldozing i Other Shoreline Lengthy SAV: not sure yes Sandbags: not sure yes n� Moratorium: n/a yes aq Photos: yes / Waiver Attached: `V no A building permit may be required by:� y' Notes/ Special Conditions i7 ge r Applicant Printed Name i�L IUx25� p uJ r r Q� V ' � Q NEYV 1,9 is zs, POLL New�O"xZr; - Signature Please read compliance statement on back of permit ** Application Fee(s) Check # (Scale: j ; A ) I r is �� 1 GSZANDr u 15�ti' See note on back regarding River Basin rules. Issuing D to *rat, Date Local Planning Jurisdiction Rover File Name NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary October 18, 2010 Foley Contractors PO Box 3482 New Bern, NC 28564 Dear Mr. Foley: Attached is General Permit #56877C to construct a 40x5 pier, 47' bulkhead and 2 mooring piles at 903 Diamond Ct., New Bern, NC. Also, enclosed is two Buffer Authorization Certificate for Shoreline Stabilization, please sign and print your name as indicated and return one in the enclosed, self-addressed envelope. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sin erely, Barry Lthri' Coastal Management Representative lsb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper N,C Division of Coastal Mgt. Habitat Impact Computer Sheet Applicant: Peter Francisco Date: 10/18/10 Permit #: 56877C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount High Ground Dredge ❑ Fill O Both O Other 0 470 470 Shoreline Dredge ❑ Fill I] Both ❑ Other ❑ 47 47 Open Water Dredge ❑ Fill ❑ Both ❑ Other M 200 200 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10 North Carolina Department of Environment Resources Division of Coastal Management Charles S. Jones, Director Michael F. Easley, Governor Date MU 112010 _ Applicant Name Peter Francisco Mailing Address 328 Bridge Gate Dr Cary, NC 27519 I certify that I have authorized (agent)_ Foley Contractors. LLC to act on my behalf, for purpose of applying for and obtaining all CAMA Permits necessary to install of construct (activity) Bulkhead/Dock , at (location) 903 Diamand Ct New Bern, NC 28560 (FFH) This certification is valid thru (date) 1 year William G. Ross Jr., Secretary 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-828-2808/ FAX: 252-247-3330/ Internet: www.nrcoastalmanaaement.net An Equal Opportunity/ Affirmative Action Employer-500/oRecycled/10% Post Consumer Paper 1 NEY ILE U.S. Dollars and Cents o - - l 0 year, month, Post Office Day +u,P' Serial Number 173466411904 L ,art 9MU1, Amount Clerk Pay to ... A fAn r� /i• /7 �r% Address Address SEE REV0 LE ONLY IN THE U.S. REVERSE WARNING NE AND POSSESSIONS Memo � Its es Poslel Service. NI Ri9�u Reserves. �' 02000 Uniletl Stet 1 („J ,,, � t ,y 1;00000 800 21' Adjacent Riparian property Owner's Statement AdjacentRiparian Property Owner: Section Number: Name - Address: Telephone Number: `J F. Lot Number- ) „2; < /-ram- l E-mail Address: I hereby certify that I own. the property adjacent to: r Section Number: Lot Number: 9 Owners Nam b _ ;` V Address: Telephone Number: E-mail Addy ed copy of the applying for this permit .has described to me the scope of work showworan the �hunderstand that The individualapp y of proposed Work" form and have no objection proposed Description and Drawing docks, pilings, tie poles or any other marine structure must be set back a minimum of fi$een feet (15'-0") m my riparianline unless waived by me. I do not wish. io waive the -setback requirement. I do wish to waive the setback requirement. Adjacent Riparian Property owner: Signature / J print Name - r� Date I Adjacent Riparian Property Owner's Statement r AdjacentRiparian Property Owner: Section Number: 7 _ Lot .Number: _ Name: Address: Telephone Number: E-mail Address: I hereby certify that I own the property adjacent to: Section Number: n Lot Number:r Owners Name: 0 1 Address: /I 0 Telephone Number: E-mail Address:` ) The individual applying for this perm;t has described to me the scope of work as shown on the attached copy of the "Description and Drawing of Proposed W Drk" form and have no objections to the proposed work. I understand that docks, pilings, tie poles or any other marine structure must be set back a minimum of fifteen feet (1 T-0") from my riparian line unless waived by me. do not wish to waive the. setback i quirement. --7I do wish to waive the setback requiremenL Adjacent Riparian Prope Owner: Signature Print Name �/- Date 1/ 0 G 1 19 l 2'0) Ci mEv-) [NO NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Cnr rafnn) BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. s.�,, Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. Pre -project site conditions:_. 6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any asso<;iated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. t Printed Name ignature _�4,w Permit Officer's Signature (0 12 ru Issue Date CAMA GENERAL PERMIT #: 5 6 -577C_ wasttmgton Vitice 943 Washington Square Mall Washington, NC 27889 Phone 252-946-6481 Version 5, 09/2009 Morehead City Office 400 Commerce Avenue Morehead City, NC 28557 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Nne orthCarolina Naturally