HomeMy WebLinkAbout56877_FRANCINCO, PETER_20101012❑CAM / 1-1DREDGE& FILL
GENERAL PERMIT Previous permit #
❑New ❑Modification El Complete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
O Rules attached.
Applicant Name_
Address
City State ZIP
Phone # ( ) Fax # ( )
Authorized Agent
❑ CW ❑ EW ❑ PTA
Affected
❑ OEA ❑ HHF ❑ IH
AEC(s):
❑ PWS: ❑FC:
ORW:
yes / no PNA yes / no
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/, Riprap length
avgydistance offshore ¢
max distance offshore
Basin, channel
cubic yards_
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length
❑ ES ❑ PTS
❑ UBA ❑ N/A
Crit.Hab. yes / no
Project Location: County
Street Address/ State Road/ Lot #(s)
Subdivision $ ;
CiZIP
t
Phone # I' 4 �L- 2 S J IZ, River Basin
Adj. Wtr. Body r� �) r nat than: unkn
Closest Maj. Wtr. Body '\"`` ' '"
(Scale: l
Q / r
NEyy ID'X2v HOLE /
8
O
O
7
0
Qi
rV
10 X 25'
POLEr
SAV: not sure yes no
Sandbags: not sure yes noo M E R I ® -
Moratorium: n/a yes no (o
Photos: yes no
Waiver Attached: yes no - - - -
A building permit may be required by: M1
N�-�V —7r4t—�-O"
FOLF- \
CRANDr
0 See note on back regarding River Basin rules.
Notes/ Special Conditions I
or Applicant Printed Name
Permit Officer's Signature
Signature Please read compliance statement on back of permit
Application Fee(s)
Issuing Date
Check # Local Planning Jurisdiction
Expiration Date
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar- Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-648 [)or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888ARCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
1,CAr'wIA /❑ DREDGE & FILL NY 5 6 8 7 7 C
'G E N E FOAL PERMIT Previous permit #
JNew ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 7 i4, 1 10 '-1 2c
'Rules attached.
Applicant Name to-
��c c1r�C t �-fi.�G+ Project Location: County_C;r .itn
Address lei i5i ���c� 1 lr Street Address/ State Road/ Loth#(s)
City— Cr r" 4 StateC'.> ZIP '7� j I D=Uo'nG t� C-T-
Phone # ( ) Fax # (_). Subdivision • o ' r
Authorized Agent Rot CZA-kCc,,' cr.r, LLC City!V1, r ZIP 1
Affected ❑CW ❑EW `XPTA El ES NPTS Phone# ("a&4) 4!�-ZiI5 River Basin (.;r
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body T's . f .�-; z :s v!• (nat an unkn
❑ PWS: ❑FC:
ORW: yes /� PNA yes / Crit.Hab. yes / no Closest Maj. Wtr. Body_ :�d,�Yi +Jt "
Type of Project/ Activity �,Ax , „�y�, �� — 7l"L I^i��
Pier (dock) length-----
Platform(s) C
Finger pier(s) _ /
Groin length New iD X2j' N
DL.E
number
ulkhea Riprap length �1 ,
avg distance offshore_-__
max distance offshore-0 '
Basin, channel
cubic yards
Boat ramp I /
Boathouse/ Boatlift j
Beach Bulldozing i
Other
Shoreline Lengthy
SAV: not sure
yes
Sandbags: not sure
yes
n�
Moratorium: n/a
yes
aq
Photos:
yes
/
Waiver Attached:
`V
no
A building permit may
be required by:�
y'
Notes/ Special Conditions i7
ge r Applicant Printed Name
i�L IUx25�
p uJ
r r Q� V
' � Q
NEYV 1,9 is zs,
POLL New�O"xZr; -
Signature Please read compliance statement on back of permit **
Application Fee(s) Check #
(Scale: j ; A )
I
r is
�� 1 GSZANDr
u 15�ti' See note on back regarding River Basin rules.
Issuing D to *rat, Date
Local Planning Jurisdiction Rover File Name
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary
October 18, 2010
Foley Contractors
PO Box 3482
New Bern, NC 28564
Dear Mr. Foley:
Attached is General Permit #56877C to construct a 40x5 pier, 47' bulkhead and 2 mooring piles
at 903 Diamond Ct., New Bern, NC.
Also, enclosed is two Buffer Authorization Certificate for Shoreline Stabilization, please sign
and print your name as indicated and return one in the enclosed, self-addressed envelope.
In order to validate this permit, please sign the permit as indicated. Retain the white copy for
your files and return the signed yellow and pink copies to us in the enclosed, self-addressed
envelope. If the signed permit copies are not returned to this office before the initiation of
development, you will be working without authorization and will be subject to a Notice of
Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sin erely,
Barry Lthri'
Coastal Management Representative
lsb
Enclosures
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper
N,C Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: Peter Francisco
Date: 10/18/10
Permit #: 56877C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
High Ground
Dredge ❑ Fill O Both O Other 0
470
470
Shoreline
Dredge ❑ Fill I] Both ❑ Other ❑
47
47
Open Water
Dredge ❑ Fill ❑ Both ❑ Other M
200
200
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10
North Carolina Department of Environment Resources
Division of Coastal Management
Charles S. Jones, Director
Michael F. Easley, Governor
Date MU 112010 _
Applicant Name Peter Francisco
Mailing Address 328 Bridge Gate Dr
Cary, NC 27519
I certify that I have authorized (agent)_ Foley Contractors. LLC to act on my
behalf, for purpose of applying for and obtaining all CAMA Permits necessary to
install of construct (activity) Bulkhead/Dock ,
at (location) 903 Diamand Ct New Bern, NC 28560 (FFH)
This certification is valid thru (date) 1 year
William G. Ross Jr., Secretary
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-828-2808/ FAX: 252-247-3330/ Internet: www.nrcoastalmanaaement.net
An Equal Opportunity/ Affirmative Action Employer-500/oRecycled/10% Post Consumer Paper
1 NEY
ILE
U.S. Dollars and Cents
o - - l
0 year, month, Post Office Day +u,P'
Serial Number
173466411904 L ,art 9MU1,
Amount
Clerk
Pay to ... A fAn r� /i• /7 �r%
Address
Address
SEE REV0 LE ONLY IN THE U.S.
REVERSE WARNING NE AND POSSESSIONS
Memo � Its
es Poslel Service. NI Ri9�u Reserves. �'
02000 Uniletl Stet 1 („J ,,, � t ,y
1;00000
800 21'
Adjacent Riparian property Owner's Statement
AdjacentRiparian Property Owner:
Section Number:
Name -
Address:
Telephone Number:
`J F.
Lot Number-
) „2; < /-ram- l
E-mail Address:
I hereby certify that I own. the property adjacent to:
r
Section Number: Lot Number: 9
Owners Nam b _ ;`
V
Address:
Telephone Number:
E-mail Addy
ed copy of the
applying for this permit .has described to me the scope of work
showworan the �hunderstand that
The individualapp y of proposed Work" form and have no objection proposed
Description and Drawing
docks, pilings, tie poles or any other marine structure must be set back a minimum of fi$een feet (15'-0") m my
riparianline unless waived by me.
I do not wish. io waive the -setback requirement.
I do wish to waive the setback requirement.
Adjacent Riparian Property owner:
Signature /
J
print Name - r�
Date I
Adjacent Riparian Property Owner's Statement
r
AdjacentRiparian Property Owner:
Section Number: 7 _ Lot .Number: _
Name:
Address:
Telephone Number:
E-mail Address:
I hereby certify that I own the property adjacent to:
Section Number:
n Lot Number:r
Owners Name: 0 1
Address:
/I
0
Telephone Number:
E-mail Address:` )
The individual applying for this perm;t has described to me the scope of work as shown on the attached copy of the
"Description and Drawing of Proposed W Drk" form and have no objections to the proposed work. I understand that
docks, pilings, tie poles or any other marine structure must be set back a minimum of fifteen feet (1 T-0") from my
riparian line unless waived by me.
do not wish to waive the. setback i quirement.
--7I do wish to waive the setback requiremenL
Adjacent Riparian Prope Owner:
Signature
Print Name �/-
Date 1/ 0 G 1 19 l 2'0) Ci
mEv-) [NO
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Cnr rafnn)
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction &/or
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s.�,, Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.
Pre -project site conditions:_.
6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any asso<;iated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
t Printed Name
ignature
_�4,w
Permit Officer's Signature
(0 12 ru
Issue Date
CAMA GENERAL PERMIT #: 5 6 -577C_
wasttmgton Vitice
943 Washington Square Mall
Washington, NC 27889
Phone 252-946-6481
Version 5, 09/2009
Morehead City Office
400 Commerce Avenue
Morehead City, NC 28557
Phone 252-808-2808
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Nne
orthCarolina
Naturally