HomeMy WebLinkAboutGeneral Permits (7606)h
Applicant Name _
Address e%
City -_0 E.
Prooct1 Location
rrbpt�
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
State Road, Water Body, etc.)
C
State
Phone Number I t 9 —Sl r/ -- 17Ss .Sf
U
Type and Din�en5ions of Project S'
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203. This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
Zip 2 �- 57� )
This certification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
SKETCH: 'S %'7 (SCALE:
-{'X �5 �c�-1 � do lC
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
r
Applis s- nature(
CAMA Official's signature.,)
Issuing date
9- 3o-9�
Expiration date
Attachment: 15 North Carolina Administrative Code 7K .0203
1
Existing to remain
i
E;<:1st1nq
t o be
demolished
Existing and rebuilt
t t• wiA1 l
i,
t
e'
E:istinq deck
4- to remain
i�l�i
U1
Damaged
Dock: Pepl acement
V
and
m
,t,
v
Phew BulkheadTie Pest Additions
VZ
E
t
31
Opp Woes Yw to A
--; Min
(ELevn
�!
down
�L
- riot to scale -
Coastal Management Permit Request — Hurricane OPHELIA Damage
September 14/15, 2005 damage dates
IndividuaMocation:
Mike Florence
803 Sherman Point Lane
New Bern, NC 28562
Phone: 252 514 9882
Fax: 252 514 4113
e-mail: weimprint(»cox.net
Brice's Creek waterway
Sherman Point Landing
Extent Of Damage
1. Our bulkhead was completely taken out and what remains are a few posts.
2. Two trees damaged our bulkhead and approximately 601/o of our dock area.
3. Because of the bulkhead damage and trees falling, "major erosion" has taken place. The
erosion is not only undermining the remaining dock section, but is working it's way up to other
tree's (root stock) and removing what vegetation remains.
Extent Of Repairs and Replacements:
1. We need to immediately replenish and stabilize the soil that has eroded By placing a batter board
against the remaining bulkhead posts, we will be able to put back soil temporarily.
2. Once the soil is replaced, we will need to drive new posts about 1 foot outside the old bulkhead
and install a new PVC bulkhead The new bulkhead will be 4 feet high by about 90 feet long.
3. Dock repairs will include new posts, bracing and walk boards for approx. 150 sq.ft.
4. Another section of dock will have to be straightened as it was pushed by the fallen tree.
5. Once the dock repairs are complete, the remaining steps will have to be reattached as access to the
docks.
6. Once the work is complete, the bank area will be replanted with vegetation for soil stabilization.
;.�
a