Loading...
HomeMy WebLinkAbout45963_BUCHANAN, WAYLON_20060803❑ CAMA / ❑ DREDGE & FILL GENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name Project Location: County_ Address `> > L- Street Address/ State Road/ Lot #(s) City C i State - Phone # ( ) Fax # ( ) Authorized Agent ❑ CW ❑ EW ❑ PTA ❑ ES Affected AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ PWS: ❑ FC: ZIP ❑ PTS ❑ N/A ORW: yes / no PNA yes /- no Crit. Hab. yes / no Subdivision City ZIP Phone # ( ) River Basin Adj. Wtr. Body -<. , (nat fman /un� Closest Maj. Wtr. Body Agent or Applicant Printed Name��r— Permit Officer's Signature Signature Please read compliance statement on back of permit Issuing Date Expiration Date Application Fee(s) Check # Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules D Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Central Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 400 Commerce Ave Morehead City, NC 28557 202-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 06/29/05 ANY WA ee l NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretar y December 19, 2005 r N. 0. Mrs. Rita Houtchens 19 o A 6037 Martins Point Road Kitty Hawk, NC 27949 DEC 2 7 2005 Re: Objection to the Issuance of CALM nftd&r0`7�oLJft-A Development Project, Location - Dare County Dear Mrs. Houtchens: This letter is in response to your objection as an adjacent riparian property owner to a permit request from Lyn Small Inc., an agent for Mr. Alan Buchfuhrer for the installation of a pier at 6041 Martins Point Road in Dare County. Mr. John Cece, of the Division of Coastal Management staff, was recently on site to evaluate the permit applicant's request. The permit applicant has requested a permit to ■ Remove an existing pier structure, ■ Install a 100 foot long pier with a 14-foot by 23-foot platform, ■ Install a 12-foot by 12-foot gazebo on the pier, and ■ Install a 12-foot by 14-foot boatlift. Under the Coastal Area Management Act (CAMA), the Coastal Resources Commission (CRC) has established Rules for General Permits for this type of development that are found in 15A NCAC 07H .1200. You have notified the Division of Coastal Management of your objections to this proposed development by a letter dated October 27, 2005. Your objections to this proposed development related to ■ The presence of a marsh on the aforementioned property, ■ The gazebo blocking your view of Ginguite Creek, ■ The pier creating a safety hazard for boaters on Ginguite Creek, and ■ The depth of water at the end of the proposed pier. Mr. Cece has reviewed your objections, along with all aspects of this development proposal for consistency with the aforementioned Rules, which describe the CRC's standards and guidelines for this type of development. Our review of the proposed development has found it to be consistent with these Rules. During Mr. Cece's on -site visit, he observed several large clumps of black needle rush (Juncus roemerianus) growing around Mr. Buchfuhrer's current pier structure. The presence of this plant species and its location in and along the waters of Ginguite Creek classify this area as a Coastal 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 30% Recycled by Fiber Weight Mrs. Rita Houtchens December 19, 2005 Page 2 Wetlands according to the Division of Coastal Management's regulations at 15A NCAC 07H.0204(a). However, the proposed structures should not adversely impact the Coastal Wetlands. While on site, Mr. Cece also observed nearby pier structures and thoroughly evaluated Mr. Buchfuhrer's proposal against the Division of Coastal Management's regulations at 15A NCAC 07H.1205 that regulate pier length and location. These regulations state that piers "shall not extend beyond the established pier length along the same shoreline" or "more than one-fourth the width" of the adjacent water body. The regulations also state that these measurements "shall be made from the water ward edge of any coastal wetland vegetation that borders the water body." Furthermore, pier, platform and boatlift structures are not deemed to constitute an unreasonable interference with navigation if they do not exceed the length of other existing piers along the same shoreline. Mr. Cece has determined that Mr. Buchfuhrer's request meets these regulatory requirements. Aesthetic issues such as the blocking of neighbors' views are addressed by the rules that limit the size of platforms and boathouses and Mr. Buchfuhrer's design meets these limitations. The depth of water at the end of this pier is greater than three feet, which is a typically acceptable depth to accommodate vessels that will utilize this size boatlift. After having given careful consideration to your objections to this proposed development, we have determined that it is consistent with the Rules of the CRC and the State's Coastal Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of Coastal Management issued General Permit No. 43043-A on December 15, 2005 (copy attached) for the proposed development. If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form with the Director of the Division of Coastal Management within 20 days of the permit issuance date. If you choose to pursue an appeal, please contact this office so that we can provide you with the appropriate forms and addresses. If you have any further questions regarding this matter, please do not hesitate to contact Mr. Cece, or me, at this office. Sincerely, d Sampson District Manager Northeast District TS:yc cc: Ted Tyndall, Assistant Director, Division of Coastal Management (DCM), Morehead City John Cece, Field Representative, DCM, Elizabeth City Lyn Small Inc., Kitty Hawk