Loading...
HomeMy WebLinkAboutGeneral Permits (7395)CERTIFICATION OF EXI FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources a in an area of environmental concern pursuant to 15 NCAC Su Applicant Name CE` t-9 ±__i 0035E Address 1 • City ta2 S ,1,_ C Project Location (County, State Road Water odyetc.) 1 > " C', Qi- ail PC: �� c :t;,i% UtTL-, t�', i=-a� Type and Dimensions of Project c�(') x A Vc A,?4 jivA LJ, i The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. AUG 0 6 2001 in Phone Number c 52`� '` Zip This certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. SKETCH (SCALE: vp e11, Any person who proceeds with a development without the con- sent of a CAIVIA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. CAMA.Offic a signature Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 r 4 , MONITORING & COMPLETION REPORT [CAMA Major Development & State Dredge & Fill Permits] PERMITTEE' S NAME: �1 5 Zi PERMIT # LOCATION: FIELD REP. PHONE: q C1 S DATE REPORTEDLY COMPLETE: DATE OF INSPECTION4D 1) Do th easured dimensions of the development differ from those indicated in the permit and workplat? Y /N [circle one]. COMMENT: 2) SEDIMENTATI & EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all disturbed are Y /NO [circle one] COMMENT: 3) FUTURE MQ9TORING & ENFORCEMENT ACTION: Is further investigation or enforcement action needed? YESr O [circle one]. COMMENT: