Loading...
HomeMy WebLinkAbout27782_GRESKEVITCH, BARRY_20010830CAMA and DREDGE AND FILL Y�182 G E N E R A L .: nt P E R MI - as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Applicant Name Phone Number Address City State Project Location (County, State Road, Water Body, etc.) Type of Project Activity /v PROJECT DESCRIPTION SKETCH Pier (dock) Length c Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing , and attached general and specific conditions. Any violation of these terms � may subject the permittee to a fine, imprisonment or civil action; and - may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. WE issuing date (SCALE: e-,-) -' . ) applicant-s signature permit officer's signature expiration date attachments application fee MONITORING & COMPLETION REPORT [CAMA Major Development & State Dredge & Fill Permits] PERMITTEE' S NAME: I PERMIT # LOCATION: aZ�, /� FIELD REP. PHONE: G 409 DATE REPORTEDLY COMPLETE:4) DATE OF INSPECTION 1) Dot easured dimensions of the development differ from those indicated in the permit and workplat? YES Nq [circle one]. COMMENT: 2) SEDIMENTATI EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all disturbed areas? *NO [circle one] COMMENT: 3) FUTURE MONITORING & ENFORCEMENT ACTION: Is further investigation or enforcement action needed? Y [circle one]. COMMENT: