HomeMy WebLinkAbout27314_GORE, ED_20010521r
CAMA and DREDGE AND FILL
G E N E R A L
PERMIT
as authorized by the State of North Carolina
Department of Environment and Natural Resources an
in an area of environmental concern pursuant to 15 N
Applicant Name '
Address
Citv
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
Phone Number `' ( '
State Zip
r,.
PROJECT DESCRIPTION SKETCH
(SCALE:
T
)
Pier (dock) Length
. fi
Groin Length
number
�i
i �'•
'
Bulkhead Length <
max. distance offshore
r
Basin, channel dimensions
cubic yards
)
ti
Boat ramp dimensions
t
Other
.. -,
......
....
This permit is subject to compliance with this application, site drawing /l~
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies that this project
is consistent with the North Carolina Coastal Management Program,
applicant's signature
permit officer's signature
issuing date expiration date
attachments
application fee
State of North Carolina
Department of Environment
_. and Natural Resources
Wilmington Regional Office
Division of Coastal Management
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Donna D. Moffitt, Director
Mr. Ed Gore
435 North Shore Drive
Sunset Beach, NC 28468
VIA FASCIMILE 910 842-7626
C/O Sammy Varnam
Dear Mr. Gore:
9A410V a /I
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
August 8, 2001
AUG 1 0 200,
This is with reference to your request for an approval of additional length for the pier which is
being constructed for you by Mr. Varnam. I have obtained Waterway Photography from the US
Army Corps of Engineers which includes the area in which your property is located. It appears
that the AIWW does not turn exactly where it was believed that it did. However, it appears that
the piers located the most adjacent to the pier under construction are only built out to the right-
of-way and not to the 80' setback. I have discussed the situation with our assistant director,
Charles Jones, and we are both of the opinion that, in this particular case, no impacts to
navigation would result if the pier were to be extended out to the point that the low water depth
is the same as the low water depth at the 80' setback. In discussing this with Mr. Varnam he
indicated that in his opinion an additional 32' from where the pier now stops would provide this
depth.
This letter authorizes the extension of the pier permitted by General Permit # 27314D for e
distance of up to 32' in a waterward direction from the initial terminus set by the nearby piers.
If there are questions concerning the above or if I may be of any other assistance, please advise.
Sincerely,
1
C. Robert Stroud, )r.
District Manager
Cc: ]anet Russell, DCM
Charles Jones, DCM
Keith Harriss, COE
127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-200.3