HomeMy WebLinkAbout27488_GAMBIE, CLAUDE D_20010410Applicant Name
Address
City
CAMA and DREDGE AND FILL
G E N E R A L MAY U r 200
P E R M I T COASTAL MANAGEMENT
MOREHEAD
as authorized by the State of North Carolina
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC � 4t , 4� L,
Phone Number
State r?.' Zip
Project Location (County, State Road, Water Body, etc.) , T /1,4
Type of Project Activity
PROJECT DESCRIPTION SKETCH
Pier (dock) Length k ' :.
Groin Length
number
Bulkhead Length
max. distance offshore -
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
r
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies that this project
is consistent with the North Carolina Coastal Management Program.
issuing date
(SCALE: l (.1 )
applicant's signature
permit officer's signature
expiration date
attachments
application fee
PERMITTEE
LOCATION:
MONITORING & COMPLETION REPORT
[CAMA Major Development & State Dredge & Fill Permits]
PERMIT it
FIELD REP.
PHONE: � '�) l �-:)o DATE REPORTEDLY COMPLETE:
DATE OF INSPECTION
1) Do thejpeasured dimensions of the development differ from those indicated in the permit and workplat?
YES/ 9circle one].
COMMENT:
2) SEDIMENTATIGM& EROSION CONTROL:
disturbed areas? ( /NO [circle one]
COMMENT:
Has Permittee seeded, grassed, or otherwise stabilized all
3) FUTURE MOMTORING & ENFORCEMENT ACTION: Is further investigation or enforcement action
needed? YES O [circle one].
COMMENT: