Loading...
HomeMy WebLinkAbout27660_DUNDLEY, STUART_20010611Your project is subject to the Tar/Pamlico CAMA and DREDGE AND FILL River Basin Buffer Rules due to its 6 66U- t3 G E N E R A L location within theTar/Pamlico Basin. r 77 please contact Deborah Sawyer at (252) PERMIT 946-6481. A as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC 1L\ \k_J Applicant Name Phone NumberSa w 4 �► �'�1:,(+c�L Address 1.- ` �•,.. City State ` Zip Project Location (County, State Road, Water Body, etc.) 63 R��+��` Type of Project Activity INA." PROJECT DESCRIPTION SKETCH `<a_ (SCALE: N\ Length Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. i applicant's signature ' permit officer's signature issuing date expiration date attachments is i t i application fee