HomeMy WebLinkAboutGeneral Permits (7311)CERTIFICATION O
-1r-
FROM REQUIRING A CAMA P
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural
in an area of environmental concern pursuant to
Applicant Name (-_ �-C r Ir--, ..)t-,
Address
City
Project Location (County, State Road, Water_ Body, etc.)
_ Your project is subject to the Tar/Pamlico
"20POAltt�f
n Buffer Rules due to its
ithin tlieTar/Pamlico Basin.
tact Deborah Sawyer or Tom
at (252) 946-6481.
ZAXeources Commission
03
Phone Number
State Zip
=,k' I l "> L'bl t CryC
sty t f Fn:� „ fn�,_ Ccmk \,�ua• C?r�E,r1tiC,',
Type and Dimensions of Project L,�c<, k;, t E,�� i u r c. `� c rn C,r
The proposed project to be located and constructed as described
This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re-
valid for 90 days from the date of issuance. Following expiration,
quirement pursuant to 15 NCAC 7K .0203. This exemption to
a re-examination of the project and project site may be necessary
CAMA permit requirements does not alleviate the necessity of
to continue this certification.
your obtaining any other State, Federal, or Local authorization.
SKETCH (SCALE: )
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
Applicant's signature
�-� x A;
A icial'6 signature
Jac -yG 1
Issuing date }
Expiration"date
Attachment: 15 North Carolina Administrative Code 7K .0203