Loading...
HomeMy WebLinkAbout12467_HERRING, OTHA_19931029P CAMAS AND DREDGE AND FIL GENERAL j ! �►� PERMIT a� — r as authorized by the State of North Carolina sav��w�wrrr���p+rrr�p rgr,4irw Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC 1 1 Applicant Name A A.7.0« City State Project Location (County, State Road, Water Body, etc.) Type of Project Activity PROJECT DESCRIPTION SKETCH M Pier (dock) length { � r r Groin length number T Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other Phone Number Zip (SCALE: I ; --1 - - 1 -- ,...- �. -> This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. J A attachments application fee issuing date applicant's signature permit officer's signature expiration date NOTES: 1. ALL TIMBER TO BE PRESSURE TREATED, GROUND CONTACT TYPE, WARRANTED FOR 40 YEARS. 2. ALL METAL PARTS SHALL BE HOT DIPPED GALVANIZED. 3. 5/8" GALVANIZED TIE —BACK BOLTS TO BE INSTALLED THROUGH ALL PILES. 4. CONTRACTOR SHALL PROVIDE ALL LABOR & MATERIALS. 5. 2 RO* S OF 4" x 6" WHALERS GENERALLY, BUT 3 OR 4 ROWS SHALL BE PROVIDED IN THE DEEPER SECTIONS OF THE BULKHEAD. 6. SHEATH.::-'-:; SHALL BE 2" x 8" V—G. 7. TiE—BACK RODS SHALL BE 5/8'0 x 10' MINIMUM GALVANIZED STEEL A.':Ct!^RED TO DEADMAN ANCHORS. 8. PC'L'= FILTER CLOTH SHALL BE BACK OF SHEATHING. 9. LENGTHS OF MATERIALS (PILES, SHEATHINGS, ETC.) SHALL BE BASED ON OVERALL HEIGHT OF BULKHEADS. 8"x 8" SO. MIN. PILING SET 5' Q.C. LENGTH AS REDD. FOR VARIOUS WALL HEIGHTS. 4 ROWS 4"x6" / WHALER EVENLY SPACED. NOT TO rxrttD 36" O.C. TOP ELEV. OF BULKHEAD TO BE ESTABLISHED IN THE FIELD BY THE ENGINEER 2"x8" CAP 5/8"xt0' G ?!ZED TIE —BACK RODS SHEATHING TO BE LINED W/POLY FILTER BACKING TO PROVIDE DRAINAGE 2"x8-xt4'� VG SH. , iING HEIGKET V N N 76033,40"W a) rn BOAT BASIN WHALER WITH TIE ROD TO BE PLACED WITHIN 8" OF TOP OF PILING & SHEATHING 8'0-10' DEADMAN PILING AT EACH TIE —BACK, CONCRETE BLOCKING IS AN ACCEPTABLE ALTERNATIVE TO PILES LOT 5 LCON POINTE RD, Private 401 Right of Way LOT 4 2.32 ACRES ♦s 0 LOT 3 C0 5 h� O n� O O Tie To Existing Bulkhead I , Cal 0 O O co Brick Storage 13uilding PROp�,ED BULKHEAD LOCATION ' f ON i _.;dean 14- igh W ter Line N S 9 42 00 W 82 24, 52�-00,' W f4 5�` EXISTING I/ AV -PIER ' 11 ' �� _ ,CONTROL t BASEL I NC PROF 14E CORNER 0t401 Station Ekevatif 0+00 3. QQ' 0+04 0+05 .-e5' 4 4. 8a1 BARREN INLET CREEK 0+16 0.401 0+32 —1 . 401 0+40 —2. 20t r l LEGEND Indicates Existing Iron Pipp Propnscd Bulk Head 17 -r� WENooVER OGDEN NORTH GORMAt PLANTATION�.�,v : 5 oCOEN BP orl � CAM 6 • t�.� p�� '� .ten .csc�t\ I i IMnnn VieINITY S i6o 38 00" VV 3.4 B' �r SOUTH :;Lk,_u MAP n.t.s. B�E)'BROOK/ E O BAR SCALE $GALE 1" = 40' 40' 20' 0' 40' 801 LOT 4 FALCON POINTE Harnett Tws . New Hanover Co. North Carol PROPOSED BULKHEAD LOC (0N Brian Hobbs 111 = 4 April 5, 1993 SURS-9346 oR^"" Brian Hobbs Q'�1TJER OTH ���� JA��i.0 HETATI.