HomeMy WebLinkAbout36775_PORTIS, ARCHIE_20031216❑CAMA / I_l DREDGE & FILL
GENERAL PERMIT Previous permit #
ILINew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
q-Rules attached.
Applicant Name_���, < �n h_i Project Location: County
Address Street Address/ State Road/ Lot #(s)
CiState ZIPo�-
Phone # Z 77 y Fax # ( ) Subdivision
r
Agent G� i �f Ir� city —A �r+si . Z� ZIP %�-Si�Gy , Authorized ent � � �i� ��, c �,, � �,F. , I
Affected C Cw IXEW QOTA XES ❑ PTS Phone # ( ) River Basin
OEA ❑ HHF ElIH ElUBA [I N/A
AEC(s): Adj. Wtr. Body ' ((natlman /unkn) 9
ORW: yes / no PNA yes / no Crit. Hab. yes / no
Closest Maj. Wtr. Body
`i
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)_
Groin length
number
Bulkhead/ Riprap length
avg distance offshore '2
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length
SAM not sure yes no
Sandbags: not sure yes no.
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no '
A building permit may be required by:
Notes/ Special Conditions
Agent.oi• Applicant Printed a
Signature Please read compliance statement on back of permit
Application Fee(s) Check #
(Scale:
See note on back regarding River Basin rules.
Permit Officer's Signature
Issuing Date % Exp tio6Date
Local Planningjurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules
❑ Neuse River Basin Buffer Rules
❑ Other:
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax: 919-733-1495
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax: 910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastalmanagement.net
Revised 10/05/01
FOLEY & FOLEY CONTRACTORS, INC. 2732
MATERIAL ACCOUNT
1810 OLD AIRPORT RD. PH. 252-636-2515
P.O. BOX 3482
NEW BERN, NC 28564 I - I 66-65/531
DATE
PAY
TO THE ?
ORDER OF 111��� gm,
pU,
�OLLARS
RBC (.T
Centura
RBC Centura Bank lr lOQ co
New Bern, NC 28560 56L
FOR G �(p]5(p�(p7%� -��o� 3
il'0000 2 7 3 2110 1:0 5 3 1008 5��I *b 16 36 Sill
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(Bulkhead/rip rap)
I hereby certify that I own property adjacent to Archie Portis is
(Name of Property Owner)
property located at 218 East Palmer Dr. New Bern, NC 28560 ,
(Lot, Block, Road, etc.)
on Neuse River —,in New Bern/Craven , N.C.
(Water body) (Town and/or County)
He has described to me as shown below, the development he is proposing at the
location, and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(to be filled in by individual proposing development)
\o w
15Q`�
Foley & Foley Contractors, Inc.
Phone#: (252) 636-2515
Fax# (252) 636-3127
PL
quffiM4 %
Print or Type Name
I3IL- 912, 1
Telephone Number
Date
DE, -2003 02:39 PM ZIMMERMAN 410 683 0398
` -- -
ADJACENT RIPARIAN PR0p%KI'Y OWNIM STATEMENT
(Bulkkea&rip rap)
I hereby certify that I own pmperty 4djixent to gre _pert ,
s
(Name of Property Owner)
Praperty located at
(Lot, Block, k6ad, etc.)
(Water body) (
Town and/or County)
He has described to me as shown below, the development he is proposing at the
location, and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(to be filled In by Individual proposing development)
� � Q tom.-.'►
Foley & Foley Contractors, Inc.
Phonek (252) 636-2515
Fax# (252) 636-3127
Signature
Print or Type Name
lephone Number
Date
P . 02
DE -2003 02:38 PM ZIMMERMAN 410 683 0398 P.01
7 Jackson Manor Court
Phoenix, MD. 21131
December 6, 2003
Dear Mr. Foley,
We have received your notification of putting a bulkhead on the property
adjacent to us. We have spoken to the owner of that property and have advised
him of our history with your company in installing a bulkhead on our property.
While we have no objection to work you do for him, we must advise you that
we do not give you permission to put any equipment on our property in
completing work for Mr. Portis. We have felt the effects of erosion after soil was
disturbed on our property in the past, and do not want any disturbance of foliage
that will hold the soil through the winter rains. As long as you can do your job for
Mr. Portis on his property, we have no objection to him putting up a bulkhead_
Sincerely,
C
Carol merman
4
1 i a -� 19wf 0.J