HomeMy WebLinkAbout40014_RAWLS, WILLIAM SR_20040923C_CAMA / ❑ DREDGE & FILL / ®.
GENERAL PERMIT Previous permit #
JNew I JModification J,Complete Reissue ! J Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmer.al concerRpursuant to 15A NCAC
t UlOL01", 5(Z &JRules attached.
Applicant Named '� Project Location: County
Address f )' r ti` r .If Street Address/ State Road/ Lot #(s)
City_ x-y v ` of %f State_ ZIP a /,
Phone # (} %d Fax # ( ) Subdivision
Authorized Agent City _.'E' �° �'l �) j`� ZIP
Cw -D EW _! PTA ES [IPTS Phone # ( ) River Basin IV"
Affected OEA HHF ! El UBA N/A
AEC(s): - C, 7 - Adj. Wtr. Body f ('/'` ` Cat /unkn)
C _i PWS: JI FC:
Closest Maj. Wtr. Body
ORW: yes / no PNA yes / no Crit. Hab. yes / no
Type of Project/ Activity
Pier (dock) length- _ T._
Platform(s)
Finger pier(s) _
Groin length `
number
Bulkhead/ Riprap length
avg distance offshore -
r
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other--- --
Shoreline Length
SAM not sure yes ' no
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by:
Notes/ Special Conditions
Agent or Applicant Printed Name
I
Signature Please read compliance statement on back of permit
Application Fee(s) Check #
12
j
See note on back regarding River Basin rules.
Afi:mit dKePsSignature
Issuing Date Expiration Date
Local PlanningJurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar Pamlico River Basin Buffer Rules Other:
euse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888-4RCOAST
Fax: 919-733-1495
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mail
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax: 910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastalmanagement.net
Revised 10/05/01
WILLIAM C RAWLS, M.D. NCDL 1052120 p1WG31/}6AI 4804
HELEN TRAWLS NCDL 1215070
PH 252-728-2985 [�
272 THURMAN RD JOale. —/
BEAUFORT, NC 28516 66-112/531
02201
BB&T
BRANCH BANKING AND TRUST COMPANY
p( BEDDA--UF^^ORT[�ORTH CAROLINA
i:0S310LL20:SLL2309693n5 4804
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I herebycertify that I own roe adjacent to r l / W-2
e r rf S
(Name of Property Owner)
property located at _ 6;� / G) V �2
(Lot, Block, Road, etc.)
on in &-l"t ��e 1r �.� ]- , N.C.
(Waterbody) (Town and/or County)
He has descnbed to me as shown below, the development he is proposing at that location,
and, I have no objections to his proposal.
DES CRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(To be filled in b individual proposing development)
b.
�r 1
//froPose I�flC stow
ID Ur
lays �� ✓� ��G�CC C
Print or Type Name
Telephone Numb - 9 %;
Date: �) C)
ADJACENT RIPARIAN pROpERTY OWNER STA
I hereby certify that I own property adjacent to
property located at � 7a� 7-A4 r of L? 67
s
(Name of Property Owner)
(Lot, Biock, Road, etc.)
on�'ICvN
(Waterbody}
(Town and/or County)
He has described to me as shown below, the development he is proposing at that Iocation,
and, I have no objections to his proposal.
DESCRIp'I'ION AND/OR DRAWING OF PROPOSED DEVELOMMgT
(To be,/Med in by individual proposing development)
tot AA
�, ro�oSe� I'�OG� � �,�► � ; SAP -
I"�lp� 4C,e
Signature
. L- a r.. C. f-L.
Print or Type Name
-4 2$-- S 3 4 v
Telephone Number
Date: Sc�o7 1 2 n o
z
concerning the proposed activity's impact on adjoining properties or on water quality; air quality: coastal welands: cultural or
historic sites; wildlife; fisheries resources: or public taut rights.
(e) This permit does not eliminate the need to obtain any other required state, local, or fede,-al authorization-
(f) Development carried out under this permit must be consistent with all local requirements. AEC rules. acd laal land use plans
current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984,
Amended E, f ..' May 1, 1990; December 1, 1987,-
RRC Objection due to ambiguityEff tifav 19, 1994;
Amended Eff. August 1, 1998; July 1, 1994.
15A NCAC 07H.1105 SPECIFIC CONDITIONS
(a) This general permit is applicable only along shorelines void of wetland vegetation including marsh grb-s and wooded swamp.
or where all construction is to be accomplished landward of such vegetation.
(b) Along natural shorelines e.g. rivers, creeks. bays. sounds, etc., bulkheads and riprap material must be posidoned as follows:
(1) Bulk -heads must be positioned so as not to exceed more than an average distance of 2 fee; watern'-ard of the
mean high water mark, or the normal water level contour, whichever is applicable. In no case shall the
bulkhead be positioned more than 5 feet waterward of the mean high water or normal wate- leV el contour at
any point along its alignment.
(2) Riprap must be positioned so as not to exceed a maximum of 5 feet water,vard of the me2r watermark or
normal water level contour at any point along itsalignment. This location standard alto a:nlies to riprap
proposed waterward of the existing bulkheads.
(c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap maten l must be positioned so as not to
exceed more than an average distance of 5 feet waterward of the mean high water mark or the normal war!: level contour.
whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet water w•2.4 of the mean high
water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atlantic Intracoastal
Waterway (A1WW) is considered a natural shoreline and development must occur as descn—ced in iH .110: i j ).
(d) Construction authorized by this general permit wi l be limited to a maximum shoreline length of 500 fee
(e) All barkfill material shall be obtained from an upland source.
(f) The bulkhead must be constructed, or the riprap must be in place prior to any backfrlling activities.
(g) The bulkhead or riprap must be structurally tight so as to prevent seepage of bail,-f-til materials throuQ.= Le Su Jcture.
(h) Riprap mateial shall be free from loose dirt or any other pollutant. It must be of a size ; rurcieat to pear Tt its movement
from the site by wave or current action.
(i) Riprap material must consist of clean rock or masotuv materials such as but not limiter to F-'-hire o: csza concrete.
Materials such as tires, car bodies, scrap metal, paper, products, tree limbs, wood debris, orgatc mats 'al or ar materiaL are
not considered riprap.
0) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheer piles or oche: s-, itable materials
approved by department personnel. No excavation is permitted except for that which may be required for the r: a,�rction ofthe
bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the mot.
(k) Bulkheads or riprap shall not extend bevond established alignments nor restrict the original width of the : ral or basin
(1) If one contiguous acre or more of property is to be excavated or filled, an erosion and sedimentation conmi Yi—n must be filed
with the Division of Land Resources, Land Quality Section or appropriate local government having jurisdic:ic.. T-nis plan must
be approved prior to commencing the land-disturroina activity.
History Note: Authority G.S. 113A-107(a); 1134-107(b); 113.4-113(b); 113A-118.1; 113A-114;
E'f March 1, 1984;
Amended Eff. December 1, 1991; January 1, 1989; December 1, 1987.
History Note: Authority G.S. 113,1-10-1 113A-118.1:
Temporary ,4doptfon Ef. October 1, 1999.
SECTION.1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS A.N'D THE PLACEMEi'VT OF
RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS
15A NCAC 07H.1101 PURPOSE
This permit will allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters
and estuarine waters AECs according to authority provided in Subchapter U .1100 and according to the following guidelines.
This permit will not apply to shoreline protection within the ocean hazard AEC.
HistoryNote: Authority G.S. 113A-10-(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984.
15A NCAC 07H .1102 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shall provide information on site location, dimensions of the project area_ and his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
wort;. Such notice should instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of+Coastal Management within
ten days of receipt of the notice; and, indicate that no response will be interpreted as no obiection. DCM staff
will review all comments and determine, based on their relevanceto the potential impacts of the proposed
project, if the proposed project can be approved by a General Permit. If DCM staff finds that the comments
are worthy of more in-depth review; the applicant will be notified that he mu--, submit an application for a
major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and appropriate Ditizsion of Coas�al Management
representative so that the proposed bulkhead alignment can be appropriately marked. Written authorization to proceed with the
proposed development may be issued during this visit. Construction of the bulkhead or riprap structure mug begin �A ithin 90 days
of this visit or the general authorization expires and it will be necessary to re-examine the alignmenn dete-.u' if the general
authorization can be reissued.
Histor✓ "ore: AuthoritvG.S. 113.4-10"/a); 113A-107(b); 113A-113(b); 1134-113.1;
, rf March 1, 1984,
Amended E-ff. January 1, 1990; December 1, 1987.
155A NCAC 07H .1103 PERMIT FEE
The applicant must pay a permit fee of one hundred dollars (S100.00) by check or money order payable to the Department.
History :!Vote: Authority G.S. 113A-1071 113A-113(b); 113.4-118.1; 113A-119; 113-119.1; 113A-124;
Fry. Afarch 1, 1984,
Amended E,f. August 1, 2000; March 1, 1991.
15A NCAC 07H .1104 GENERAL CONDITIONS
(a) This permit authorizes only the construction of bulkheads and the placement of riprap conforming to the standards herein.
(b) Individuals shall allow authorized representatives of the Department of Environment, Health. and Natural Resources to make
periodic inspections at any time deemed necessary in order to be sure that the activity being performed under authority of this
general permit is in accordance with the terms and conditions prescriRgd herein.
(c) Them shall be no significant interference with navigation or use of the waters by the public by the existence of the bulkhead
or the riprap authorized herein.
(d) This permit will not be applicable to proposed construction where the Department h >s determined, based on an initial =iew
of the application. that notice and review pursuant to G.S. 113A-119 is necessary because these are un.--solved questions