Loading...
HomeMy WebLinkAbout34783_NC DOT_20030902l r. CAMA / F-I DREDGE & FILL ti 34783 GENERAL PERMIT � � Previous permit# New ❑Modification .Complete Reissue F]Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC CC ❑ Rules attached. Applicant Name Project Location: County Address ;JO /� ��X % j ,Y, % Street Address/ State Road/ Lot #(s)J(`C) 2— % City ?"- State ZIP Phone # Fax # (_) Subdivision Authorized Agent 7, sG 1'� City �' , , t C r, ZIP_ _ Affected ❑ Cw ❑ EW ;Q PTA E I ES Ji PTS Phone # ( ) River Basin AEC(s): ElOEA ElHHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body , n % -` t: k ti nat man unkn ❑ PWS: ❑FC: Closest MaWtr. Body ORW: yes / no, PNA yes / no Crit. Hab. yes / no j. i' Type of Project/ Activity (Scale: ) Pier (dock) length Platform(s) Groin Bulkh Basin, Other Shorel SAV: Sandb Photo Waive l no A building permit may be required by: Notes/ Special Conditions on back regarding River Basin rules. See note f, �' Agent or Applicant Printed Name Signature aseird compliance statement on back of permit V l C.} e �� - clf �, f C �i ✓y Application Fee(s) Check # /fir Permit Officer's Signature17 Isfuing Date Expiration Date r� Local PlanningJurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: �] Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888-4RCOAST Fax: 919-733-1495 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax: 910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) www.nccoastalmanagement.net Revised 10/05/01 NC Department of Transportation 1514 Mail Services Center Raleigh, NC 27699-1514 PAY TO THE ORDER OF NC DEPT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT 1638 MAIL SERVICE CTR RALEIGH NC 27699-1638 State Treasurer, Raleigh, North Carolina Payable at Par Through Federal Reserve System II' L43381611' 1:0S31 LOS941: 66-1059" 531 Warrant 3.433816 Date 05/29/2003 $ 100.00 I a B �• �• �. �. DOIIAI{-)yy-2i-�iyi yiy yyy.�yy.jyi iiy ONE 2110 2ER0 PERIOD 2E00 21NO S"'000"'C30 LIP' C. Wayne Stallings Chief Financial Officer MCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary September 2, 2003 NC Department of Transportation ATTN: Mr. Jay Johnson P.O. Box 1587 Greenville, NC 27835 Dear Mr. Johnson: Attached is General Permit #C-34783 to replace existing 7.5' x 6' x 66' CMP with a new 12'3" x 7'3" x 72' aluminum arch pipe adjacent to South Creek in Beaufort County on SR1002 — 1.1 miles south of SR 1924 at Gum Swamp Run crossing, Aurora, NC. In order to validate this permit, please sign all three (3) copies as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self- addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, Bill Arrington D.O.T. Field Representative BA/srk Enclosures 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper 4 4CAMA / t`DREDGE & FILL ? 34783 GENERAL PERMIT Previous permit# VIA ❑New ❑Modification ❑Complete Reissue [-]Partial Reissue Date previous permit issued } As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC _ fD 71 , Z-3 oD �11 �� �[] — attached. Applicant Name IU, � Project Location: County l7 r'n e.c �D' ftu -f Address/sP�, QF((X f -r K7 Street Address/ State Road/ Lot #(s) S R (I&C) 2 ( City LZI'{ec`�ti, �UL State ZIP 2 j 50,44, � S��(` Z—V 'Z+ �',� z- ��, �Y QIA 1UY,KIP V%uPt Phone # (ZS2) 9" p -3 6 Fax # ( ) Subdivision Authorized Agent 7, .S o kv►1 S'a--Y\- City A -AA Oi- ZIP Affected ❑ CW ❑ EW ;Q PTA ❑ ES )�PTS Phone # ( ) River Basin C(m li c t> ❑OEA ❑HHF ❑IH ❑❑ UBA N/A �" AEC(s): Adj. Wtr. Body�. "A� ;re�.Y� neat lman /unkn) ❑ PWS: ❑FC: ORW: yes no PNA yes / no Crit. Hab. yes / no Closest Maj. Wtr. Body �� i`^� I c-0 c Oc-- Type of Project/ Activity (Scale: b w d cet Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other (f-Lc f V ev'-t R '1 6�4 Shoreline Length SAM not sure yes no _�— Sandbags: not sure yes no Moratorium: n/a yes no Photos: no - -- -} �_ _ ._ ;-- —i— - Waiver Attached: es no -- -- A building permit may be required by: ,-�< See note on back regarding River Basin rules. Notes/ Special Conditions �1 kir+ p � CCA I 4 #- f mCCS P `�- 4 c, c7 J`Tr.ee,,, h_e [\' J Agent or Applicant Printed Name Permi;oi 7 Signature "Please read compliance statement on back of permit "E" l4uineDate xpiration Date loo-O k7kj O—Z 32 P(O Y OF 1q) 7 Application Fee(s)�Check# Local Planning Jurisdiction Rover File Name Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public X Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain). f. Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands 4 vO 2 9 2003 j. Will the proposed bridge affect existing water flow? _ _Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes _ No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed Gum Swamp Run b. Number of culverts proposed 1 @ 12'-3" x7'3"x72' Corrugated Metal Pipe c. Type of culvert (construction material, style) Aluminum Structural Plate Pipe Arch d. Will proposed culvert replace an existing bridge? Yes X No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) Revised 03/95 rf � Form DCM-MP-5 AUG 2 9 2003 e. Will proposed culvert replace an existing culvert? X Yes _ _No If yes, (1) Length of existing culvert 66' (2) Width of existing culvert 7.5'x6' (3) Height of the top of the existing culvert above the MHW or NWL 5.0' (4) Will all, or a part of, the existing culvert be removed? (Explain)Yes, The existing culvert will be removed and replaced with the new culvert. f. Length of proposed culvert 72' g. Width of proposed culvert 1 @ 12.2510.25' h. Height of the top of the proposed culvert above the MHW or NWL 5' i. Will the proposed culvert affect existing water flow? Yes X No If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X _Yes _ _ _ No If yes, (1) Length of area to be excavated 76' (2) Width of area to be excavated 19' (3) Depth of area to be excavated 3.25' (4) Amount of material to be excavated in cubic yards 1444 square feet b. Will the placement of the proposed bridge or culvert require any excavation within: Coastal Wetlands _ SAVs _ Other Wetlands If yes, OPEN WATER IMPACTS 120 sq. ft. total (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? X Yes No If yes, (1) Length of area to be excavated 66' (2) Width of area to be excavated 19' (3) Amount of material to be excavated in cubic yards 1254 square feet d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area Temporary spoil area is existing road bed (2) Dimensions of spoil disposal area 20' x 20' (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. (4) Will the disposal area be available for future maintenance? X Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes _ No If yes, (1) Length of area to be filled 74' (2) Width of area to be filled 14' (3) Purpose of fill Backf`ill with gravel for bedding of the culvert f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: Coastal Wetlands SAVs Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill Revised 03/95 r i Form DCM-MP-5 AUG 2 9 2003 g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical Bridge construction equipment g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail RipRap will be placed at the ends of the pipe NCDOT-Beaufort County -SR 1002 Applicant or Project Name A Signature // o Date Revised 03/95 W. VICINITY MAP SEE ATTACHED SHEET 0 0 cV Q STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS LOCATION:--- SR 1002 BAY_ CIT-YROAD ----------------- RICHLAND—TOWNSHIP--B EAUFORT C0UNTY ------------------------------------- TYPE OF WORK: ---------------------------------------- --PIPE— REPLACEMENT CEMENT _ EXISTING 7.5'x6'x66' CMPA PROPOSED 12' —3"x7'—3"x72' ALUMINUM STRUCTURAL PIPE ARCH GUM SWAMP RUN �— ------------------- -- - - -- ,ryx• n.cs TO AURORA s— u,us r° n.w s. ex• � .w.s r° r.s. um� l.1 MILES TO JCT. OF SR 1924 _ aw CRr Rib �., a._, - ----- z -- -- b 7 I SR 1002 BAY CITY ROAD GRAP= SCAUS 0 RAM u PtDFLE NOWDWALI n PtO LE IT957GK DA TA ADT = -- ADT - DHv = % D % T -%. v - MPH ' TTST % DUAL _% PROJECT LENGTH PREPARED IN THE OFFICE OF DIVISION OF HIGHWAYS m� , RIGHT OF NAY DATE: _ svv p� LETTING DATE: TO BAYBORO TO PAMLICO COUNTY HYDRAULICS ENGINEER DIVISION OF HIGHWAYS ATE OF NORTH CAROLINA ROADWAY DESIGN MWWAP AD6117 YflA7 ON nnrs•.,• n.rnm nrn[[n nnrturt.mm nnrrnm[ T6poZone - The Web's Topographic Map 7 wysiwyg:H5/http://www.topozone.co...8& lon=-76.76602346495179&symshbw=n tulle's Coordinates (NAD27): UTM The TopoZone 0DD. DDDD is Q D/M/S produced by Maps Show a la target carte, Inc - nr symbol 2000 Maps a la Email this map carte, Inc. - All Bookmark this map rights Print this map reserved. Use of this site is - c. Trai3head�TaK+_' Base Cam •rksr -> " ■ P T `•s..:�-tea. t: ��r� 7 3 1 ^�-T AUG 2 9 2003 of 2 8/ 19/03 5:46 PM FOR PERMITTING ONLY: PIPE REPLACEMENT NOT FOR CONSTRUCTION SR 1002 o BEAUFORT COUNTY CIIJ BAY CITY ROAD EXISTING 7.5'x6'x66' CMPA PROPOSED 12'-3"x7'-3"x72' ALUMINUM STRUCTURAL PIPE ARCH PREPARED BY: N.C.D.O.T. NEW BERN DISTRICT ENGINEER'S OFFICE 209 SOUTH GLENBURNIE ROAD NEW BERN. NC 28560 NOTE: NO IMPACTS ON COASTAL OR 404 WETLANDS FOR THIS PROJECT WEYERHAEUSER COMPANY P.O. BOX 139/ NEW BERN, NC 28562 DBK. 8/2, PG. 602 AREA I ZERO WETLAND IMPACTS EXISTING R/W _ GUM SWAMP RUN EXISTING SHOULDER POINT ----------- �-- ----------- --- --- - EXISTING EP EXISTING TIMBER BULKHEAD WITH TIMBER PILINGS PROPOSED I2'-3"x7'-3'x72' ALUMINUM / TO AURORA STRUCTURAL ATE _ UCTURAL PLATE PIPE ARCll - / 1.1 MILES TO JCT.OF SR /924 EXISTING EP EXISTING SHOULDER POINT -------------- EXISTING TIMBER BULKHEAD EXISTING R/W WITH STEEL PILINGS 7 AREA ZERO WETLAND IMPACTS EARL W. BON ER _ 13, BONNERTON ROAD __- URORA, NC 2 7806 404 WETLANDS - DBK. l05/, PG. 2 252 -322 -5 27 30" - - BUFFE BUFFER= ZONE 2 ZONE l- - PROJ. REFERENCE NO. SHEET NO. I TOTAL SHEETS 3 5 STATE PROJECT NO. DESCRIPTION PIPE REPLACEMENT SR 1002 BAY CITY ROAD AUGUST GUM SWAMP RUN IS A BLUE LINE STREAM AS SHOWN ON THE BAYBORO QUADRANGLE OPEN WATER IMPACTS FEET AREA 3 25 SQUARE FEET AREA 4 20 SQUARE FEET TOTAL: 120 SQUARE FEET EXISTING R/W AREA 2 ZERO WETLAND IMPACTS - - - -------------------- / EXISTING TIMBER BULKHEAD EXISTING SHOULDER POINT EXISTING EP WITH TIMBER PILINGS EXISTING 7.5'x6'x66' CMPA SR 1002 � TO BAYBORO BAY CITY ROAD TO PAMLICO COUNTY EXISTING EP EXISTING SHOULDER POINT EXISTING TIMBER BULKHEAD EXISTING R/W p� WITH ST NOTE: NO IMPACTS ON COASTAL OR 404 WETLANDS FOR THIS PROJECT EARL W. BONNER NOTE: TAR -PAMLICO RIPARIAN 404 WETLANDS 13/8 BONNERTON ROAD BUFFER RULES APPLY AURORA, NC 27806 30' DBK. l05/, PG. 102 20' 252-322-5227 - BUFFER AREA 3 ZONE I BUFFER ZERO WETLAND IMPACTS ZONE 2 PROJECT 'NO. CROSS SECTION OF CULVERT CROSSING DATE AUGUST[" 20 2003 ROAD SR 1002 ARCH TYPE PIPE ROAD NAME BAY CITY ROAD ]PIPE NUMBER I COUNTY BEAUIFOIE T EXISTING 7.5' x Wx (6(b' CMFA ROAD SR 1002 SR 1002—ROAD 5.0' NWL AREA TO BE EXCAVATED AND BACKFILLED r5o; EXISTING AREA TO BE EXCAVATED — AND BACKF7ILLED / .5'x6'x66' CMPA UNDERCUT & NOT TO SCALE BACKFILL PROPOSED 12'-3"X7'-3"X72' ALUMINUM STRUCTURAL PLATE FIFE ARCH ROAD A U G 2 9 2003 ROAD SR 1002 SR 1002 19' 5.01' NWL PROPOSED 12'-3"x7'-rx72' Li � o ALUMINUM STRUCTURAL PLATE PIPE ARCH z J W REA TO BE EXCAVATED O AND BACKFILLED 5.0' > r N a w AREA TO BE EXCAVATED — d 0 w W AND BACKFILLED W I J 2.25 PROPOSED RIP PAP 92 END TOP VIEW- v+ o'LL a _ OF PIPE w x I III U w �3 ui vi W W V1 Z UNDERCUT & NOT TO SCALE 160 SQUARE FEET 10' o LL BACKFILL OF NEW FILL GUM SWAMP RUN PROPOSED JE'x as Clf TOTAL SQUARE FEET 10, EDGE OF OF NEW FILL = 320 SO. FT. PAVEMENT PROPOSED 2e 36'x44' CMP EXISTING SHOULDER EXCAVATION ABOVE NWL: FINISHED EARTH SLOPE AS REQUIRED 66'L x 19'w x 11'd = 1,254 SQUARE FEET �— \ PROPOSED RIP PAP @ END EXCAVATION BELOW NWL- I I w OF PIPE 76'L x 19'w x 3.25'd = 1,444 SQUARE FEET c � � I LEGEND SHEET DIFFUSE FLOW THROUGH WETLANDS I' VEGETATED UPLANDS BEFORE ENTERING WETLANDS z w TEMPORARY ROCK SILT CHECK � � I > (=3 O SILT IASIN TYPE 'I' SOIL EROSION CONTROL LEGEND, TYPICAL EACH SHEET TYPE -A UPLANDS / Z a O �t SILT BASIN TYPE B w I w 4 � TEMPORARY ROCK SILT CHECK TYPE -A > % TEMPORARY ROCK SILT CHECK TYPE-B tl I 0 - - � TEMPORARY SILT FENCE SILT BASIN TYPE-B 0 I 2 w� aI CRAOE BREAK u T D I Q DIRECTION OF FLOW o I o III ------ WOODSLINE DIFFUSE FLOW DETAIL DIFFUSE FLOW TEMPORARY ROCK SILT CHECK TYPE 'B' TEMP. STONE DITCH CNEDK ` 0• PTJ EDGE OF PAVEMENT o`y STRLICTUIIAL STONE BACK SLOPE ISOMETRIC VIEW —I• I14. r NATURAL GROUND CROSS SECTION VEE DITCH SASE of DITCH 1' YIN. NATURAL GROUND 12'EMENi 12' YIN. E�'7x ]77[ 77TT T .IIC_y 11 t_� FLOE orrtoxAL TYPE •e• A•.W CROSS SECTION SILT WASIN IY THICK SEDIMENT TRAPEZOIDAL DITCH CONTROL STONE ELEVATION VIEW II. NTS ------- 404 WETLANDS FILL AREA 20' i0 --- NEUSE RIVER RIPARIAN BUFFER ------- 404 WETLANDS $ -- COASTAL WETLANDS GL 0 GL 10 ---- CRASS LINED CHANNEL YJS-a IY N SECTION S-B •i . a• n"., u• w. xl �OIWEL Y WY 1N SECTION. TEMPORARY ROCK SILT CHECK TYPE -A PROPOSED SILT FENCE WETLAND VAR.0'-G' EDGE OF EXIST. ROAD EXISTING FILL , UTILITIES LEGEND, TYPICAL EACH SHEET POWER POLE • AG ❑T TELEPHONE PEDESTAL © CABLE TV PEDESTAL O* SEWER CLEAN OUT ® WATER VALVE FIRE HYDRANT O WATER METER EIPO EXISTING IRON PIPE -Dp- PROPERTY CORNER — IL— PROPERTY LINE GRASS -LINED CHANNEL TRAPEZOIDAL DITCH SECTION T D B E Z = D X-SECTION AREA (A) = BD +ZDI TOP WIDTH (T)= B + 2DZ AREA TO BE (� FILLED OR r— UNDISTURBED AREA DISTURBED 1 FABRIC BURIED BELOW EXISTING GRA SILT FENCE DETAIL NTS PROPOSED SILT FENCE I VAR.O•-6' I WETLAND EDGE OF EXIST. ROAD CERTIFIED MAIL RETURN RECEIPT REQUESTED 8/21/03 Earl W. & Helen Bonnor 1318 Bonnorton Rd. Aurora, NC 27806 Dear Mr. & Mrs. Bonnor 'A U 6 2 9 2003 This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to replace an existing 7.5' X 6' X 66' CMPA with a 12'-3" X 7'-3" X 72' Aluminum Structural Pipe Arch onsite of his/her property located on SR 1002 in _BeaufortCounty. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Bill Arrington N.C. Dept. of Environment and Natural Resources Morehead City District Division of Coastal Management 151-B Hwy 24 Hestron Plaza II Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sin e G. Littleton, Jr. Tech V Bridge Maintenance -Div 11 I have no objection to the proposed project as described in this correspondence. I have objection to the project as presently proposed and have enclosed comments. - (Signature) 0- a-J — 0-3 (Date) CERTIFIED MAIL RETURN RECEIPT REQUESTED 8/21/03 Weyerhaeuser Company C/O Howard Spence PO Box 1391 New Bern, NC 28560 Dear Mr. Spence ,AUG 2 9 2003 This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to replace an existing 7.5' X 6' X 66' CMPA with a 12'-3" X 7'-3" X 72' Aluminum Structural Pipe Arch onsite of his/her property located on SR 1002 in _Beaufort County. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Bill Arrington N.C. Dept. of Environment and Natural Resources Morehead City District Division of Coastal Management 151-B Hwy 24 Hestron Plaza II Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Siy} e . Littleton, Jr. Tech V Bridge Maintenance -Div II L/ I have no objection to the proposed project as described in this correspondence. I have objection to the project as presently proposed and have enclosed comments. (Signature) J 6-r-- (Date) SR 1002 Beaufort County Pi a Replacement Mon 24 :E) -z, 4v Si CI-) 0 0 Ak- 4k- --Vk 4T 14 Ap- 4P 0.8 0 0.8 1.6 SR 1002 Beaufort County Pipe Replacement 7.5 minute quadrangle South Creek Quad USGS Soils Map Beaufort County Inset Page 3 Miles �( 7p� _f`.; '�" ...�.yY G .r � .�, �,��1�a•7fk�M*' � �� t .� r � R�±n., •.�J � .'' all K �.. � - t �