Loading...
HomeMy WebLinkAbout30570_NC DOT_20030310❑ CAMA / ❑ DREDGE & FILL i'` . ` 30570 GENERAL PERMIT Previous ' evious permit ❑New ❑Modification E Complete Reissue [-]Partial Reissue Date previous permit issued /011; As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name i��� _1 Project Location: County Address Street Address/ State Road/ Lot #(s) City 1 i , , . ; i ")c State A) C ZIP 2 �- `11 Phone # ( ) 26 r - � 72 j Fa[[xtt# ( ) Subdivision Authorized Agent City ZIP Affected ❑ CW ❑ EW U,PTA ❑ ES L]:PTS Phone # ( ) River Basin AEC s : ElOEA ElHHF ❑ IH ElUBA ElN/A Ad'. Wtr. Body; i '�' �� ❑ PWS: ❑FC: I r' ) (nat /man /unkn) ORW: yes / no PNA yes / no Crit. Hab. yes / no Closest Maj. Wtr. Body Type of Project/ Activity (Scale: Pier (dock) length Platform(s) Finger pier(s) �._I Groin length I ' — ! ti ,�- number — - Bulkhead/ Riprap length i avg distance offshore i149 max distance offshore t T I Basin, channel I� JL cubic yards � I.. t Boat ramp Boathouse/ Boatlift 1 -'-- -, — — -- — -- -- -- - — r- t �— Beach Bulldozing Other . Shoreline Length SAM not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions Agent or Applicant Printed Name Signature Please read compliance statement on back of permit "7 r Application Fee(s) Check # See note on back regarding River Basin rules. Permit Officer's Signature t Issuing Date Expiration Date Local PlanningJurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: El Tar - Pamlico River Basin Buffer Rules " Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888ARCOAST Fax: 9 19-733-1495 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax:910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 10/05/01 DEPARTMENT OF TRANSPORTATION DIVISION 03 OFFICE 124 DIVISION DRIVE WILMINGTON, NC 28401- Pay DATE 03/06/2003 66-1059 STATE TREASURER, RALEIGH, NORTH CAROLINA 531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM r r r r r r r r rt r r r r r r r r r .r r r rt r r r r rt r r r r r r r r r 9 Pay DIVISION OF COASTAL MANANGEMENT Pc�uae►�y►a�i�yy►=one,uo:cRorcRioc;xc�o to the 151-B HWY 24 HESTRON PLAZA II Order of MOREHEAD CITY, NC 28557 AUTHORIZED SIGNATURE "'000 1 2499ii' i:O S 3 1 1O S941: STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETT GOVERNOR SECRETARY March 6, 2003 Bill Arrington, Field Representative Division of Coastal Management North Carolina Department of Environment and Natural Resources 151 — B Highway 24 Hestron Plaza Morehead City, North Carolina 28557 SUBJECT: Replacement of Bridge 81 (TIP No. B-2924) on SR 1321, Brunswick County Dear Mr. Arrington: Please find enclosed a CAMA General Permit Application from the North Carolina Department of Transportation for the replacement of Bridge 81 (TIP No. B-2924) in Brunswick County. A CAMA General permit had been acquired for this project (GP #C-30569), however due to delays in getting a contract completed, construction has not begun on this project and the current GP expires on 3/21/03. Construction is now scheduled to begin April 2003. The scope of the project which includes the removal of the existing three span 75.6 ft x 24.1-11 steel I beam supported reinforced concrete deck bridge with a three span 120 ft x 27 ft prestressed concrete core slab deck bridge has not changed. However, the contractor has requested authorization to construct a temporary work platform on either side of the existing end bents to access the drill shaft sites on this project. Each proposed work platforms will extend approximately 10 ft from the existing end bents and will be supported by two H-piles. The project will impact 50 linear feet of streams associated with Wet Ash Swamp, which is classified as C Sw by the Division of Water Quality. Stream impacts will be largely associated with the removal/installation of piles and installation of drill piers. A letter requesting modification to the existing ACOE Nationwide 14 permit (Action ID #200200568) to include a NWP 33 for the construction of the work platforms has been sent to Dave Timpy with the Army Corp of Engineers. Per the Division of Water Quality General Certification #3366 for NWP 33, no written concurrence from the DWQ is required. If you have any question or concerns, please feel free to contact me at (910) 251-5724. Enclosures Sincerely, Mason Herndon, Division Environmental Officer Division 3 124 Division Drive, Wilmington, NC 28401 PHONE: (910) 251-5724 FAX: (910) 251-5727 Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public EK Private b. Type of bridge (construction material) Prestressed concrete core slab bridge c. Water body to be crossed by bridge Wet Ash Swamp d. Water depth at the proposed crossing at MLW or NWL 9.5 ft e. Will proposed bridge replace an existing bridge? MYes -ONo If yes, (1) Length of existing bridge 75.6 ft (2) Width of existing bridge 24.1 ft (3) Navigation clearance underneath existing bridge 7.1 ft. (4) Will all, or a part of, the existing bridge be removed? (Explain) Yes, the entire structure will be removed including pilings. f. Will proposed bridge replace an existing culvert(s)? E Yes � No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge 120 ft h. Width of proposed bridge 27 ft i. Height of proposed bridge above wetlands 6.9 ft j. Will the proposed bridge affect existing water flow? M Yes El No If yes, explain New bridge will allow greater flow of water. k. Navigation clearance underneath proposed bridge 6.9 ft Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? F� Yes ONo If yes, explain Decrease height by 3 in. and widen opening by 20 ft depending on water level. in. Will the proposed bridge cross wetlands containing no navigable waters? _a Yes _ENo If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? a Yes JQNo If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed b. Number of culverts proposed c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? -0 Yes -ONo If yes, (1) Length of existing bridge (2) Width of existing bridge Revised 03/95 Form DCM-MP-5 (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? n Yes F No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL i. Will the proposed culvert affect existing water flow? F Yes El No If yes, explain j. Will the proposed culvert affect existing navigation potential? ❑ Yes -ONo If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? a Yes EINo If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: \ F Coastal Wetlands L1 SAVs F Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? ER Yes EL No If yes, (1) Length of area to be excavated 45 ft (2) Width of area to be excavated 40 ft (3) Amount of material to be excavated in cubic yards 200 d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area Upland site to be determined (2) Dimensions of spoil disposal area N/A (3) Do you claim title to the disposal area? n Yes 2 No If no, attach a letter granting permission from the owner. (4) Will the disposal area be available for future maintenance? Q_ Yes M No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes E No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? 0 Yes ER No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? M Yes a No If yes, (1) Length of area to be filled (2) Width of area to be filled 4@a 10",42 3.5 ft (3) Purpose of fill Piles for temp.work platforms, drill piers for permanent bridge f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled N/A (2) Width of area. to he filled N/A Form DCM-MP-S (3) Purpose of fill g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? E Yes n No If yes, (1) Length of area to be filled 160 ft (2) Width of area to be filled 10 - 15 ft (3) Purpose of fill Rip Rap will be place on either side and in front of end bents to prevent scouring_ during high flows 4. GENERAL a. Will the proposed project involve any mitigation? n Yes 0 No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? [l Yes EL No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? n Yes r;� No If yes, explain in detail d. Will the proposed project require any work channels? 0 Yes EK No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical bridge construction equipment g. Will wetlands be crossed in transporting equipment to project site? n Yes M No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? M Yes _0 No If yes, explain in detail See 3 NCDOT - Brunswick 81 Applicant or ProjectNNaaamee % Signature 03-06-03 Date ` J',• IIU 7 16 J % Exu Freeland Cy �,� �• � 2.5 n I \ 13 17a 3:±� r' New, m 13 Britton ti 137) hh, _1377 , OCI J 3_Ya f 329 Ah .•� I 133p��. 1 \ a• > Weovnti.r 1333 BRIDGE #81- �: 'S� 1372 1321 .;3� •J 1331 � J V �/• J• 1 � 5 �1.3 O p \ 9q 1323' Ira ® 6 Regan a 3.3 \ 1351 \ s 1332 — Longwood .:� _ . 131-3 ?6 • � % ' . B I j(Y1 131 1` 13j5 SII � �::ni rr lenaanlo .P 1,0 13n 1 1306 - 30] PA .315 �tpY- 1 W p 6 3�0p 1 ' 13C5 � / i 30541 1 k- 1 • �' , 1305 Shnllo t r e ). 1, 6 1315 \ t1 l 6 1 BRUNSWICK COUNTY NORTH CAROLINA NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS — BRIDGE MAINTENANCE UNIT --ROJECT ROAD :_,,OUNTY SR 1321 WORK PLATFORMS BRUNSWICK 10" H-PILE ON- 3.5 ft DRILL PIER 03/05/03 EXISTING END BENT ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: sa o� Rol( A. R eived by (Please Print Clearly) B. Date of Delivery RA12111 15Pc rJCC� C. Sig ure ❑ Agent X�� ❑ Addressee D. Is deliver. reskderent from item 1? ❑ Yes It YES, enter delive dress below: ❑ No 3. Service Type ❑ Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) PS Form 3811, July 1999 Domestic Return Receipt 102595-99-M r789 ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: A. Received by (Please Print S C. Signature '„ I � Q � l ❑ Agent X �" jrJ ./�. L.X/� ❑Addressee D. Is delivery ado" different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type Certified Mail ❑ Express Mail Ga-gegistered ❑ Return Receipt for Merchandise . ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) PS Form 3811, July 1999 Domestic Return Receipt 102595-99-M•7789 ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: H e-, A. Received by (Please Print Clearly) I B. Date of Delivery C. Signature r 11 ❑ Agent X j al 06 10, �� ! _ ❑ Addressee D. Is delivery address different from &fn 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type ❑ Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes irnP-� dwncrS No,:i,c,c�rco� 2. Article Number (Copy from service label) ' ,099 540C GGG 3 59Ga 2 3`35 PS Form 3811, July 1999 Domestic Return Receipt 102595-99-M-1789 r,./l T 1-C' EXISTING BRIDGE No. 81(TO BE REMOVED > W.P. 12 24'-0" CLEAR ROADWAY JT. @ BENT "1 SPANS • 1 to 25'-3". 1 0 25'-0" & 1 0 25'-1" w P "1 STA. 10+09.96 -L- RC FLOOR ON STEEL I -BEAMS END BENTS & BENTS ;RC CAPS/ TIMBER PILES FILL FACE (0 END BT."1 STL.CRUTCH Q SIDE BENTS STA. 9+73.88 -L- 10'-0" BEGIN APPROACH SLAB STA.9+62.88 -L- Cocc S S�- CLASS II 0 0 WOODS 00 WOODS RIP 00 i TYPE87'-G" GUARDRAIL -TO - - - - - - - - - - - GR. ANCHOR __ - t � . N 27°-30'-OO-E m v~i H X / N W - - - - - - - - - - - - - - - - - TYPE-350 L GR. ANCHOR 212'-6" GUARDRAIL - WOODS WOODS TBM BEGIN PAVEMENT BRG. NAIL IN BASE OF 18" SYCAMORE STA.(PK 010 00) -L 26' RT. OF STA. 7+69 -L- ELEV.= 500.00 ( ASSUMED DATUM (L SURVEY -L---i J U ti rId �I 15'-0" SHOULDER 2, 12'-0" TO 1 /2" PER FT 7 ( TYP. I lb I/<" PER FT: rem -0" TAPER TO BRIDGE 1/4" PER FT. I /z" PER FT. 11/2 I I 11/z I 1 490 480 470 90° \ ILSRU 321Y) -L 55'-1" - PLAN W.P. "4 w.P. "3 FILL FACE @ END BT. "2 JT. (Z BENT "2 STA. 11+01.13 -L- STA.10+65.04 -L- END APPROACH SLAB STA.11+12.13 -L- 1.THE QUANTITY OF RIP RAP TO BE PAID FOR WILL BE THE ACTUAL NUMBER OF TONS OF EACH CLASS OF RIP RAP WHICH HAS BEEN INCORPORATED INTO THE COMPLETED AND CERTIFIED PLATFORM SCALESPORILL BE OTHER CERTIFIED BYEDIN TRUCKS ACCEPTED WORK. THE RIP IEDWIGHINGEDEVICES.THE ON QUANTITY OF RIP RAP WILL BE PAID FOR AT THE CONTRACT UNIT PRICE PER TON: PLAIN RIP RAP CLASS II (2'-0" THICK ) END PAVEMENT WOODS STA.12+00.00-L- Cd�b Q SM�i� 0 WOODS of r - END BENT No.l 200 TONS END BENT No-2 200 TONS TOTAL 400 TONS 212'-G" GUARDRAIL TYPE 350 CHOR PP TT TT - - - - - - - - - - - - - - - - - - x _ - - - - _ - - - - - - - - I 2.PILES FOR END BENTS No.'s I AND =b TYPE XI / 2 SHALL BE DRIVEN TO A MINIMUM �11 ll���� CLASS IIJ RIP RAP IS'-0" SCALE : 1" = 20' DENOTES GEO-TECH BORE HOLE LOCATIONS. DENOTES T12" FUNNEL AND FUNNEL DRAIN REO'D (SEE ROADWAY STANDARDS ) 2" S-9.5A J L 4" B-25.OB OR 8" ABC TYPICAL ROADWAY SECTION WITHIN CONSTRUCTION LIMITS W.P."2 JT.Q BENT "1 W.P. "1 STA. 10+09.96 -L- FILL FACE G) END BT. "1 STA.9+73.88 -L- BEGIN APPROACH SLAB STA. 9+62.88 -L- GRADE BREAK STA.9+25.00 -L- EL.500.25 +0.2% BEGIN PAVEMENT lw STA. 9+00.00 -L P.I. = 9+25.00 -L- FEATHER EL.= 500.25 TO EXIST. FIX. EXP, HP 12 x 53 STEEL PILES ESTIMATED LENGTH = 40'± 2'-0" CLASS II GRADE TO RIP RAP ( TYP. ) EL. 490.65± TOP OF DRILLED PIER BEARING CAPACITY OF 45 TONS EACH. STA. 11+U L TO SR 1324- NAIL) 3. WHEN DRIVING PILES. THE MAXIMUM BLOW COUNT SHALL NOT BE EXCEEDED. TYPE-350 GR.ANCHOR r 4.STEEL PILE POINTS ARE REQUIRED FOR PILES AT END BENT No.'s 1 AND S 2. SEE POINTSQL PROVISION FOR STEEL WOODWOODS PILE 87'-6" GUARDRAIL 5.THI5 STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH FHWA'S TECHNICAL ADVISORY T5140.20 ( SCOUR AT BRIDGES >. 6.THE SCOUR CRITICAL ELEVATION FOR BENT No.1 IS 463 FEET AND FOR BENT No.2 IS 457 FEET. THESE ELEVATIONS ARE FOR USE BY MAINTENANCE FORCES TO MONITOR POSSIBLE SCOUR PROBLEMS DURING THE LIFE OF THE STRUCTURE. J 7 THE EXISTING BRIDGE SHALL BE REMOVED BY SAWING AND/OR NON -SHATTERING METHODS SUCH THAT DEBRIS WILL NOT FALL INTO THE WATER. 8. FOR DRILLED PIERS. SEE SPECIAL PROVISIONS. 9.SLURRY CONSTRUCTION SHALL BE USED FOR THIS PROJECT. SEE DRILLED PIERS SPECIAL PROVISION. 10.CASINGESHALLENOTCEXTENDTBELOWUELEVDATIOND475LFEDETIWITHOUTBTHE ENGINEER'S PERMISSION. PERMANENT STEEL CASING AND DRILL PIERS SHALL END AT THE CONSTRUCTION JOINT AT THE BOTTOM OF THE CAP. ll.FOR PERMANENT STEEL CASING.SEE SPECIAL PROVISIONS FOR DRILLED PIERS. 12 THE AND DTIPLLED PIERS AT BENT No.'s 1 BEARI G. THE REQUIRED TIP ABEARING VCAPACITE BEENDYEIS 8 TTSFSIGNED OATBBENTS No.sOTH SKIN RDI AND 2. 13.THE REQUIRED TIP BEARING CAPACITY AT INTERIOR BENT No.'s 1 AND 2 SHALL BE VERIFIED. 14.DRILLED PIERS FOR BENo.'s 1 AND 2 HAVE BEEN DESIGNED FOR AN APPLIED LOAD OF 190 TONS EACH AT THE TOP OF THE COLUMN. 15.DRILLED PIERS AT BENT No.'s 1 AND 2 SHALL EXTEND TO AN ELEVATION NO HIGHER THAN STA.10+37.50 -L- 433 FEET AND SATISFY THE REQUIRED BEARING CAPACITY. C.G. EL.500.48 16.SPT TESTING IS REQUIRED TO DETERMINE THE TIP BEARING CAPACITY OF THE DRILLED PIERS AT BENT No.'s 1 AND 2. SEE DRILLED PIERS SPECIAL PROVISION. W.P."3 17.CSL TUBES ARE REQUIRED AND CSL TESTING MAY BE REQUIRED FOR THE DRILLED JT.G) BENT "2 PIERS AT BENT No.'s 1 AND 2. SEE DRILLED PIERS SPECIAL PROVISION FOR CROSSHOLE STA.10+65.04 -L- W,P,"4 SONIC LOGGING. FILL FACE (;D END BT."2 18.SID INSPECTIONS ARE REQUIRED TO DETERMINE THE BOTTOM CLEANLINESS OF THE DRILLED STA. 11+01.13 -L- PIERS AT BENTS No.'s 1 AND 2. SEE DRILLED PIERS SPECIAL PROVISION. 19.ALL EXISTING PILES IN THE AREA OF CONSTRUCTION SHALL BE REMOVED.eaw END APPROACH SLAB LAYERS I STA.1TRACOR 1+12.13 -L- 20 AONBOTHTENDIBENTDSIPILDOF THE E DRIVINGRSHALLEB�FMONINOREDKCAREFULLYTTOIPREVENT PILEAT WS EL.490.57 EXP. _ +0.2% FIX. EXP. FIX. OVERSTRESS OR DAMAGE. GRADE BREAK PROJECT NO. 6.503427 STA. 11+50.00-L- END PAVEMENT EL.500.70 BRUNSWICK COUNTY STA. 12+00.00-L- FEATHER TO EXISTING STATION: 10+37°50 -L- - - - - - - RFPI ACES BRIDGE No. 81 HP 12 x 53 / STEEL PILES ESTIMATED LENGTH = 50'± (PIER '-6" 0 DRILLED V/2: 1 SLOPE (TYP.) GRADE TO ( TYP. I EL. 490.65 *- TOP OF DRILLED PIER DENOTES ROADWAY FILL TO BE REMOVED I 1 11+00 8+00 9+00 10+00 PROFILE ALONG q, SURVEY _M_ RRTTT n TP . 4-12-02 SCALE : I" = 20' 1 12+00