Loading...
HomeMy WebLinkAbout30663_WAZETER, BOB_20020125CAMA DREDGE & FILL GENERAL PERMIT Previous permit # 'New Modification Complete Reissue Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC []Rules attached. Applicant Name Address City Phone # O_ Authorized Agent Affected - CW AEC(s): OEA PWS: OIRW: yes / no State — ZIP Fax # (— E41EW E-PTA El HIIHIF 0 1H 1:1 FC: PNA yes / no I Type of Project/ Activity Pier (dock) length__ Platform(s) Finger pier(s)-- Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel CULJIL Ydf UN Boat ramp _ Boathouse/ Boatlift Beach Bulldozing Other El ES [I IPTS El UBA El N/A Crit. Halb. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # River Basin Adj. Wtr. Body 1- ---------Cnat Lman /unkn Closest Maj. Wtr. Body I` , YL' (Scale: Shoreline Length SAV not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: See note on back regarding River Basin rules. Notes/ Special Conditions Yq 4� Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit Application Fee(s) Check # -Permit Officer's Signature Del, Issuing Date Expiration Date Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: L I Tar- Pamlico River Basin Buffer Rules J Other: f N use River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888-41RCOAST Fax: 919-733-1495 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax: 910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 10/C $] ec u SI I_en hanted dac u m rn 1. See hack or de �- - 3063 MEDFORD MARINE CONSTRUCTION 802-B NEUSE DRIVE _ s6-30i5at NEWHERN, NC -L 252 635 5242560 DATE PAY ''' TO THE ORDER OF DOLLARS 8 FIRST' CITIZENS 112 BANK N--B-i=N.Bank bTrust Company • BA1 \ I\ Naw Born. N.C. 28562 ®� FOR � � n•00 306 ail' 1:0 5 3 L00 3001:00 i L 24-3 5 I? LIT' f _ ADJACENT REPARLkN PROPERTY 0WN7ER STATENf -NT (FOR A PIENIMOORING PILINGSIBOATZIF'I'/BOATHOUS.E) r y I hereby certify that I own property adjacent to Mr. & Mrs. Bob Wazeter is (Name of Property Owner) prope:V located at 906 Coral CL (Lot, Block, Road, etc.) on Inner Harbor off Spring Creek, in New Bern Craven Co. , N.C. (Waterbody) (Town and/or County) He has described to me, as shown below, the development he is proposing at dat location, and, I have no objections to his proposal. I understand dw a pie:lrnoorina piliing-,tiboatlift/boathouse must be se: back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. (e1A I do not wish to waive the setback requirement. I da wish to waive that setback requirement. DESCRIPTION AND/OR DR.A.WINtiG OF PROPOSED DEVELOP.vIl~tiT: (To be JMd in by individual proposing development) (see the attached drawing) si Lure Print or Type Name Telephone Number Date: 11- 1 `1' - p 1 JAN-23-2002 12:17 KING'S GRANT 540 634 1599 P.01 VZ ADJACENT R"ARMN PROPERTY OWMM STAMIE`T U' O P 1 (FOR A rIWAf DORM PILJNC-VNOit TUPVSO ! TJ6/ X= l henby eetd(y dw i owe property sdjacmt in Mr. jft mAkEft is MUM or nor O*w4 PWPM kmad of on oowt OL an J.h+n.r Mar6or s�„o Cmk, m mow , ) - •-�---- (To"andr' N.C.�+ cQ- . Ae his 4000 d p m% b shore below, the &Vo!opmm m is and, I days no ot� jea�iau to his F'°P°�►� u �t �oc>�a,, p�Wt. I : WWL,=w . oat a semoofti P 'UT'disc m of M N fact (15) ftae my ZM c(qwm mcm wdgu wiivod by ML PY� I f�a0t b vii��e tlrrt ietbuk tegwTemtnL L.._ I Au wbh w waive tru eetck ngnir maot. DUCIt MON ANWOR DRAWM Or PROM= DXV=PXDT. Rb kimm (n b laA"dpmpt w depworwo (so do ~hod dmvAng) Pleirt Co,7IloA t TOTR- P.01 Inner Harbour Canal I we 2' 75' E--- 22'�-�--�-- 20�a�-15�1 0 20' Primary Boat Slip i 28' (2) Mooring Whips 11 Existing Secondary---�--- Boat Slip 22,-„�,_,,_ 20,---1 1 2, !--- 35' 20'" P/L Kathy Reed Prol Mr. & Mrs. Bob Wazeter 906 Coral Ct. New Bern, N.C. 28560 252-672-5074 Section-7, Lot# 215 139.50 L.F. Waterfront (Scale: 1" = 20') Medford Marine Construction P.O. Box 3556 New Bern, N.C. 28564-3556 252-635-5242/fax: 252-635-4970 P/L Gail Rabai Property 15A NCAC 07K .0203 PRIVATE BULKHEADS: RIPRAP: AND PIERS EXEMPTED (a) The NC Coastal Resources Commission hereby exempts from the Coastal Area Management Act permit requirement work in the estuarine shoreline, public trust shoreline, and public trust waters areas of environmental concern necessary to maintain, repair, and construct private bulkheads with backfill, and to place riprap material along shorelines, and construct piers or mooring facilities in waters of North Carolina. This exemption is subject to the following conditions and limitations: (1) The activities exempted by this Rule shall be private, non-commercial activities conforming to the standards and conditions contained in this Rule. This exemption does not apply to development associated with multi -unit residential developments larger than duplexes or to marinas, commercial harbors, community or neighborhood boat access, fish houses or similar commercial activities. (2) This exemption is applicable only along estuarine and public trust shorelines void of wetland vegetation types described in G.S. 113-229, or where all construction is to be accomplished landward of such vegetation, or where the pier is elevated above said wetlands. (3) This exemption only applies to bulkheads, riprap, and piers in non -oceanfront areas. (4) This exemption does not eliminate the need to obtain any other required federal, state, or local authorization. (5) Before beginning any work under this exemption the Department of Environment and Natural Resources representative must be notified of the proposed activity to allow on -site review of the bulkhead, riprap material, or pier alignment. Notification may be by telephone, in person, or in writing. Notification must include: (A) the name, address,- and telephone number of landowner and location of work including county, nearest community, and water body; (B) the dimensions of the proposed pier, bulkhead with backfill, or the area dimensions to be covered by placement of riprap material, (C) confirmation that a written statement has been obtained, signed by the adjacent riparian property owners, indicating that they have no objections to the proposed work. (These statements do not have to be presented at the time of notification of intent to perform work, but the permittee must make it available to CRC agents at their request.) (6) The landowner must agree to perform the work authorized in this Rule in a manner so as to conform with standards for development in the estuarine or public trust shoreline area of environmental concern. (b) Bulkheads and Riprap: Conditions (1) The permittee shall maintain structure of areas of riprap material authorized in this Rule in good condition. (2) Bulkhead with backfill, and placement of riprap material exempted by this Rule shall be limited to a maximum shoreline length of 200 feet. (3) The bulkhead backfill and riprap materials must be obtained from an upland source. (4) No excavation is exempted under this Rule except that which may be required for installation of the riprap, bulkhead wall, deadmen, cables, or pilings. (5) The proposed bulkhead alignment or area for placement of riprap material must be staked or flagged by the landowner in consultation with, or approved by, a state or federal permit officer prior to any construction activity. The bulkhead must be positioned so as not to extend more than an average distance of two feet waterward of the normal high water line or normal water line; in no place shall the bulkhead be more than five feet waterward of the normal high water line or normal water line. Construction activities must begin 90 days after approval of the alignment or area. (6) The bulkhead must be solid structure constructed of treated wood, concrete slabs, metal sheet piles, corrugated asbestos sheeting, or similar materials. A structure made of organic material, tires, car bodies, or similar materials is not considered a bulkhead. (7) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the bulkhead. The bulkhead must be constructed prior to any backfrlling activities. (8) Riprap material must consist of clean rock or masonry materials such as marl, brick, or broken concrete. Materials such as tires, car bodies, scrap metal, paper products, tree limbs, wood debris, organic material or similar material are not considered riprap. (c) Piers: Conditions (1) Exemptions for pier construction along natural shorelines are available only for lots with shoreline lengths 75 feet or greater. Exemptions may be used on shorelines in human -made canals and basins regardless of shoreline length. (2) Piers and mooring facilities must not exceed 100 feet in total length off -shore; must not be within 150 feet of the edge of a federally maintained channel; must not extend past the four foot normal low water contour line (four foot depth at normal low water) of the water body; must not exceed six feet in width; must not include an enclosed. structure; and must not interfere with established navigation rights of other users of the water body and must have a minimum setback of 15 feet between any part of the pier and the adjacent property owners' areas of riparian access. The line of division of areas of riparian access shall be established by drawing a line along the channel or deep water in front of the properties, then drawing a line perpendicular to the line of the channel so that it intersects with the shore at the point the upland property line meets the water's edge. The four foot normal low water restriction shall not apply to piers constructed in canals and basins dredged from areas above normal high water (NHW) or normal water level (NWL). (3) This exemption shall not apply to docks and piers being built within shellfish franchises or leases unless the applicant for authorization to construct can provide written confirmation of no objections to the proposal from the lessee. (4) Piers authorized by this exemption shall be for the exclusive use of the land owner, and shall not provide either ]eased or rented docking space or any other commercial services. Piers and mooring facilities designed to provide docking space for more than two boats shall, because of their greater potential for adverse impacts, be reviewed through the permitting process, and, therefore, are not authorized by this exemption. (5) Piers and docks shall in no case extend more than 1 /4 the width of a natural water body, canal or basin. Measurements to determine widths of the water body, canals or basins shall be made from the waterward edge of any coastal wetland vegetation which borders the water body. The 1/4 length limitation shall not apply when the proposed pier is located between longer piers within 200 feet of the applicant's property. However, the proposed pier shall not be longer than the pier head line established by the adjacent piers, nor longer than 1/3 the width of the water body. (6) Any portion of a pier (either fixed or floating) extending from the main structure and six feet or less in width shall be considered either a "T" or a finger pier. (7) Any portion of a pier (either fixed or floating) greater than six feet wide shall be considered a platform or deck. (8) "T"s, finger piers, platforms, and decks of piers must not exceed a combined total area of 200 square feet. (9) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands and shall be elevated at least three feet above any coastal wetland substrate as measured from the bottom of the decking. History Note: Authority G.S. 113A-103(5)c; 113A-118(a); Eff. March 29, 1978; Amended Eff. August], 2000; August], 1998; May 3, 1993; December 1, 1991; May 1, 1990; July], 1987.