Loading...
HomeMy WebLinkAbout28152_TIME WARNER ENT_20010801CAMA and DREDGE AND FILL G E N E R A L PERM I T as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Applicant Name Address City Project Location (County, State Road, Water Body, etc.) Type of Project Activity Phone Number State zip PROJECT DESCRIPTION SKETCH Pier (dock) Length i Groin Length Til m (SCALE: ..::, , ) number ;. Bulkhead Length max. distance offshore 1 a I Basin, channel dimensions cubic yards � Boat ramp dimensions I Other. E m.. F , This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. issuing date r ' applicant's signature I ` permit officer's signature expiration date ` J attachments application fee A74 oil LIAV� F4CDENR- North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary Mr. Don Butler Time —Warner Cable 3809 Peachtree Avenue Suite 102 Wilmington, NC 28406 Dear Mr. Butler: 22 August 2001 R ;; 2001 .FIED MAIL r 4 Re: Suspension of Work / Appeal of CAMA Permit Decision The Chairman of the Coastal Resources Commission, Eugene Tomlinson, has received a request for an administrative hearing to challenge CAMA Permit 28152-C. The Third Party Hearing Request was filed on behalf of petitioner on August 21, 2001. Under N.C.G.S. §113A-121.1 (the Coastal Area Management Act), your CAMA permit is automatically suspended upon receipt of a hearing request and will remain suspended until either: (1) the Chairman denies the hearing request (under standards set out in the statute); or (2) there is a final Coastal Resources Commission decision on the permit appeal. You may not undertake any development under the permit decision until further notice after Chairman Tomlinson issues his decision. The Division of Coastal Management will prepare a recommendation for the Chairman on whether to grant or deny the hearing request. The Chairman must make a decision within 15 days after receipt of the hearing request, in this case no later than September 5, 2001. If you wish to submit any materials for the Chairman's consideration in ruling on the request for contested case hearing, please send them to me as soon as possible. Sincerely, Donna D. Moffitt cc: Chairman Gene Tomlinson Ryke Longest Jessica Gill Dave Heeter Meme Jo Alcoke Tere Barrett Ted Tyndall Charles S. Jones 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: hftp://dcm2.enr.state.nc.Lis An Equal Opportunity \ Affirmative Action Employer —50% Recycled \ 10% Post Consumer PaPer r State of North ("arOhna Reply to: I i( )l' C( )( )I'1 :1 t .,Ryke Longest Environmental Division Iit>x 629 Tel: (919)716-6600 I l.\LI:R it I Fax: (919) 716-6767 2 760 )3-062• ) September 4, 2001 n Lawrence F. Baldwin U 2001 Hollis L. Batson - 137 Stoneybrook Rd. CERTIF[ED MAIL Wilmington, NC 28411 RETURN RECEIPT REQUESTED Re: Third party Hearing Request for Coastal Area Management Act General Permit No. 28152 to Time Warner Entertainment Company Dear Mr. Baldwin and Mr. Batson: The Chairman of the Coastal Resources Commission has decided to deny the hearing request which you submitted concerning Coastal Area Management Act General Permit No. 28152 to Time Warner Entertainment Company. Enclosed please find a copy of the order, signed by the Chairman of the Coastal Resources Commission, denying your request. You may appeal the Commission's decision by filing a petition for judicial review in superior court within thirty days after receiving the order. A copy of the judicial review petition must also be served on the Coastal Resources Commission's agent for service of process at the following address: Daniel C. Oakley, General Counsel Dept. of Environment and Natural Resources P.O. Box 27687 Raleigh, NC 27611 Enclosure cc: Dave Heeter ✓6arles Jones Donna Moffitt Sincerely, ke Longest Special Deputy Attorney General STATE OF NORTH CAROLINA COUNTY OF CARTERET IN THE MATTER OF THE THIRD ) PARTY HEARING REQUEST BY ) LAWRENCE BALDWIN AND ) HOLLIS BATSON ) BEFORE THE CHAIRMAN COASTAL RESOURCES COMMISSION CMT 2001-10 I. INTRODUCTION FINAL ORDER Pursuant to G.S. §113A -121.1(b), Lawrence Baldwin and Hollis Batson have filed a third party hearing request with the Coastal Resources Commission. They seek permission to challenge the issuance of Coastal Area Management Act General Permit No. 28152-C by the Division of Coastal Management. Permit No. 28152-C was issued to Time Warner Entertainment Company to install an underwater fiber optical cable from the mainland to Harkers Island. II. STANDARD OF REVIEW Under the Coastal Area Management Act (CAMA), a third party may file a contested case hearing petition to challenge the issuance of a CAMA permit only if the Coastal Resources Commission (CRC) first determines that a contested case hearing is appropriate. G.S. § 113A - 121.1(b) provides that the determination as to whether a hearing is appropriate should be based upon a consideration of whether the Petitioner: 1. Has alleged that the decision is contrary to a statute or rule; 2. Is directly affected by the decision; and 3. Has alleged facts or made legal arguments that demonstrate that the hearing request is not frivolous. 2 The CRC has delegated the authority to its Chairman to determine whether a third party hearing request should be granted or denied. Rule 15A NCAC 7J .0301(b). A third party whose hearing request is granted may file a contested case hearing petition with the Office of Administrative Hearings. G.S. § 1 13A- 12 l (b). A third party whose request is denied may seek judicial review. Id. M. FINDINGS OF FACT A. The Petitioners own a piece o`f prope ty on Harkers Island with water frontage on the so-called Straits between the mainland and Harkers Island. B. The N.C. Department of Transportation (DOT) has a right-of-way for the NC Highway 1335 causeway and the two bridges between the mainland and Harkers Island. C. The Petitioners' property abuts the south or southeast side of the right-of-way for the causeway and the approach to the swing bridge on the way to Harkers Island. D. The Petitioners' property corner is located about 300' south of the end of the swing bridge. E. Time Warner Entertainment Company sought a CAMA general permit to install a 5" fiber optic cable running under the Straits from the mainland to Harkers Island. (Attachment A is a location map showing the crossing site which is hereby incorporated by reference.) F. The cable would be installed by directional boring and would be located some 20 feet below the bottom under the main channel. G. The put in point for the cable would be located above the high water line and within the DOT right-of-way about 208' south of the end of the swing bridge. (Attachment B is a copy of two sheets from the Plan showing the put in point which sheets are hereby incorporated 3 by reference.) H. A 10' wide by 20' long by 8' deep pit would be dug on the shoreline before boring horizontally under the waterbody to run the cable to Harkers Island. I. Time Warner Cable obtained an encroachment agreement from the Department of Transportation dated July 16, 2001, to locate the cable within the highway right-of-way. (Attachment C is a copy of the Encroachment Agreement between the DOT and Time Warner Entertainment which is hereby incorporated by re f�-rence.) J. Time Warner Cable notified the Petitioners of the proposed project. K. The Petitioners objected saying that the put in point for the cable would be on their property because DOT's right-of-way is only 60 feet wide, not 100 feet wide, as shown on the plan for the project. (Attachment D is a copy of the Petitioners' objection which is incorporated herein by reference.) L. The right-of-way is apparently 60' wide towards the swing bridge but widens to 100' at some point before the Petitioners' property. M. The Petitioners also contended that the cable would interfere with their "riparian and littoral rights". N. After receiving assurances from the DOT that the project was located within the highway right-of-way, the DCM issued CAMA General Permit No. 28152-C to Time Warner on August 1, 2001. (Attachment E is a copy of CAMA General Permit No. 28152-C which is incorporated herein by reference.) O. In a letter dated August 6, 2001, Ted Tyndall, DCM's District Manager, Morehead City, sought to address the Petitioners' objections but mistakenly referred to the M encroachment agreement as a right-of-way agreement. (Attachment F is a copy of the letter from Ted Tyndall to the Petitioners dated August 6, 2001, which is incorporated herein by reference.) P. The Petitioners sought to challenge the issuance of CAMA General permit No. 28152-C by attempting to file a third party hearing request with the Coastal Resources Commission on August 10, 2001. (Attachment G is a copy of the Petitioners' incomplete hearing request which is incorporated herein by reference.) �. The DCM verbally informed them that their attempted hearing request was incomplete and needed to be submitted on the proper form. R. The Petitioners then filed a hearing request with the Commission on August 21, 2001. Their request was on the correct form but was filed 21 days after the permit decision. (Attachment H is a copy of the Petitioners' second hearing request which is incorporated herein by reference.) or rule. IV. CONCLUSIONS OF LAW Petitioners have not alleged that the proposed development is contrary to statute 2. For purposes of this Request, Petitioners have demonstrated that they are directly affected by the decision.The Petitioners own riparian property adjacent to the put in point for the cable. Their property also abuts the highway right-of-way within which the cable will be located. 3. For the reasons set forth in the Recommendation of the Division of Coastal Management, the Petitioners have failed to demonstrate that their hearing request is not frivolous. Specifically, those reasons are as follows: A. The Petitioners contend that their real property rights will be violated because the highway right-of-way within which the cable will be located is only 60' wide, not 100' wide as shown on the project plan. The disputed width of the highway right-of-way is a real property issue for resolution by the General Court of Justice, not the Division of Coastal Management or the Coastal Resources Commission. In addition, the Petitioners have raised this allegation without any supporting evidence. Finally, the Division of Coastal Management received assurances from the DOT in response to the Petitioners' objection that the right-of-way is 100' wide at the Petitioners' property. B. The Petitioners also contend that their riparian/littoral rights will be violated by the underwater cable crossing. As the owners of riparian property, they have a right of access to navigable water. They also have the same rights as members of the public to operate a boat, gather shellfish, set pound nets, etc., in the waters and bottom in front of their property. The Petitioners have made no showing that any of these rights will be affected by a cable entering the ground above the high water line and then running underneath the bottom of the Straits. C. The Petitioners' hearing request was not filed with the CRC within 20 days of the permit decision, and this alone is sufficient to support a denial of their hearing request. Since this request is untimely, it must be denied. �� In conclusion, Petitioners have not met the criteria justifying a contested case hearing. Petitioners have failed to timely file a request. Petitioners have not alleged facts or made legal arguments that demonstrate that the request for the hearing is not frivolous, and thus have not satisfied the criteria for hearing established at N.C. Gen. Stat. § 113A -121.1(b)3. Therefore, Petitioners' request for a Third Party Hearing is hereby DENIED. This the 44-1- day of September, 2001. Eugene B. Tomlinson, Jr. Chairman Coastal Resources Commission CERTIFICATE OF SERVICE This is to certify that I have caused a copy of the foregoing Final Decision to be served upon the Petitioner by depositing a copy thereof in the U.S. Postal Service with sufficient postage for delivery by first class mail and addressed to: Lawrence F. Baldwin Hollis L. Batson 137 Stoneybrook Rd. Wilmington, NC 28411 This the" day of September, 2001. P. Longest, Jr. eaes . Department of Justice P.O. Box 629 Raleigh, NC 27602-0629 (919) 716-6954 EP50137 Chur4s S'rA,ri: OF NORTI I CAROLINA COUNTY OF C'ARTERLT IN THE MATTER OF THE THIRD ) PARTY HEARING REQUEST BY ) LAWRENCE BALDWIN AND ) HOLLIS BATSON ) 131 FORE TI II: CTI COASTAL RESOURCES COMMISSION CMT 2001-10 RECOMMENDATION Of TIII: DIVISION OF COASTAL NIANAGE:NIE'NT 2001 1. BAC K(AZOUND TAA MA IV0,1EH! Pursuant to G.S. ti 1 13A -121.1(b), Lawrence Baldwin and 1-10111s Batson have; filed a third party hearing request with the Coastal Resources Commission. They seek permission to challenge the issuance of Coastal Area Management Act General Permit No. 28152-C by the Division of Coastal Management. Permit No. 28152-C was issued to Time Warner Entertainment Company to install all underwater fiber optical cable from the mainland to Harkers Island. Under the Coastal Area Management Act (CAMA), a third party may file a contested case hearing petition to challenge the Issuance of a LAMA permit only if the Coastal Resources Commission (CRC) first determines that a contested case hearing is appropriate. G.S. § l 13A- 12 1. 1 (b) 3A-121.1(b) provides that the determination as to whether a hearing is appropriate should be based upon a consideration of whether the Petitioner: I. Has alleged that the decision is contrary to a statute or rule, 2. Is directly affected by the decision; and 3. Has alleged facts or made legal arguments that demonstrate that the hearing request is not frivolous. The CRC has delegated the authority to its Chairman to determine whether a third party hearing request should be granted or denied. Rule 15A NCAC 7J .0301(b). A third party whose hearing request is granted may file a contested case hearing petition with the Oflice of Administrative Hearings. G.S. § 113A -121(b). A third party whose request is denied may seek judicial review. Id. The Division ofC'oastal Management (DCM) recommends denying the hearing request by Lawrence Baldwin and Hollis Batson. H. FACTS A. The Petitioners own a piece of.property on Harkers Island with water 1rontaj�c on the so-called Straits between the mainland and Harkers Island. B. The N.C. Department of Transportation (DOT) has a right-of-way for the NC Highway 1335 causeway and the two bridges between the mainland and Harkers Island. C. The Petitioners' property abuts the South or Southeast side of Che right-of-way for the causeway and the approach to the swing bridge on the way to Harkers Island. bridge. D. The Petitioners' property corner is located about 300' south of the end of the swing E. Time Warner Entertainment Company sought a CAMA general permit to install a 5" fiber optic cable running under the Straits from the mainland to Harkers Island. (Attachment A is a location map showing the crossing site which is hereby incorporated by reference.) F. The cable would be installed by directional boring and would be located some 20 feet below the bottom under the main channel. G. The put in point for the cable would be located above the high water line and within the DOT right-of-way about 208' south of the end of the swing bridge. (Attachment B is a copy of two sheets from the Plan showing the put in point which sheets are hereby incorporated by reference.) 3 If. A 10' wide by 20' long by 8' deep pit would be; dug on the Shoreline betin-c boring horiontally under the waterbody to run the cable to Flarkers Island. Time Warner Cable obtained an encroachment agreement from the Department of Transportation dated.luly 16, 2001, to locate the cable within the highway right -OC -way. (Attachment C is a copy of the Encroachment Agreement between the DOT and Time Warner Entertainment which is hereby incorporated by relcrencc.) J. Time Warner Cable notified the Petitioners ol'the proposed project. K. The Petitioners objected saying that the put in point l'or the cable would be on their property because DOT's right-of*way is only 60 feet wide, not 100 feet wide, as shown on the plan fa• the project. (Attachment D is n copy of the Petitioners' objection which is incorporated herein by reference.) L. The right-of-way is apparently 60' wide towards the swing bridge but widens to 100' at some point before the Petitioners' property. M. The Petitioners also contended that the cable would interfere with their "riparian and littoral rights". N. Atter receiving assurances from the DOT that the project was located within the highway right-of-way, the DCM issued CAMA General Permit No. 28152-C to Time Warner on August 1, 2001. (Attachment E is a copy of CAMA General Permit No. 28152-C which is incorporated herein by reference.) O. In a letter dated August 6, 2001, Ted Tyndall, DCM's District Manager, Morehead City, sought to address the Petitioners' objections but mistakenly referred to the encroachment agreement as a right-of-way agreement. (Attachment F is a copy of the letter from Ted Tyndall to the 4 Petitioners dated August 6, 2001, which is incorporated herein by reference.) P. The Petitioners sought to challenge the issuance of CAMA General permit No. 28152-C by attempting to'hle a third party hearing request with the Coastal Resources C'on1111ission on August 10, 2001. (Attachment G is a copy of the Petitioners' incomplete heal -1110 request which is incorporated herein by reference.) Q. The DCM verbally Informed them that their attempted hearing recluest was incomplete and needed to be submitted on the proper form. R. The Petitioners then tiled a hearing request With the Commission on AUgUst 2 1, 2001. Thcir request was on the correct tbrm but was tiled 21 days atter the permit decision. (Attachment 1-1 is a copy of the Petitioners' second hearing request which is incorporated herein by reference.) Rule? M. DCM'S RECOMMENDATION A. Have The Petitioners Allegecl That The Decision Is Contrary To A Statute Or No. The Petitioners have not cited any statute or rule which was violated by the issuance of CAMA General Permit No. 28152-C. B. Are The Petitioners Directly Affected By The Permit Decision? Yes. The Petitioners own riparian property adjacent to the put in point for the cable. Their property also abuts the highway right-of-way within which the cable will be located. C. Have The PetitionersDemonstrated That Their Hearing Request Is Not Frivolous? No. For the following reasons, the Petitioners have failed to demonstrate that their hearing request is not frivolous: 1. The Petitioners contend that their real property rights will be violated because the 1 highway right -of -Way within which the cable will be located is only 00' wick:, not I()()' wide as shown on the project plan. The disputed width of the highway right -of -Way is a real property issue for resolution by the General Court of Justice, not the Division of Coastal Management or the Coastal Resources Commission. In addition, the Petitioners have raised this allegation Without any supporting evidence. Finally, the Division ofCoastal Management received assurances frons the DOT in response to the Petitioners' objection that the right-of*way is 100' wide at the Petitioners' property. 2. Tile Petitioners also contend that their riparian/littoral rights will be violated by the Underwater cable crossing. As the owners of'riparian property, they have a right ofaccess to navigable water. They also have the sante rights as members of the public to operate a boat, gather shellfish, set pound nets, etc., in the waters and bottom in front of their property. The Petitioners have made no showing that any of these rights will be affected by a cable entering the ground above the high water line and then running underneath the bottom of the Straits. D. Was The Petitioners' Hearing Request Titnely File(l:' No. The Petitioners' hearing request was not tiled with the CRC within 20 days of the permit decision, and this alone is sufficient to support a denial of their hearing request. IV. CONCLUSION For the reasons given above, the Petitioners' hearing request should be denied. This the 3 -OH, day of August, 2001. FOR THE DIVISION OF COASTAL MANAGEMENT 6 David (;. 1-Icctcr -- - Assistant Attonicy Gcncral N.C. Department Ut .lushcc 11.0. Box 629 Raleigh, NC 27602-0620 (919) 716-6954 7 ('F:RTI ElCAT E 0E SE11VICF, This is to certify that I have caused a copy of the foregollig Recom111endatloll 01' 'File Division of'C'oastal Management to be served upon the Petitioners by cicpositing a copy thercol'in the U.S. Postal Service with sufficient postage for delivery by first class mail and addressed to: Lawrence F. Baldwin Hollis L. Batson 137 Stoneybrook Rd. Wilmington, NC 28411 This the 9066 day of August, 2001. GP50055 David G. Fleeter Assistant Attorney General N.C. Department ofJustice P.O. Box 629 Raleigh, NC 27602-0629 (919)716-6954 aYl<<•' �'.<. fl .� - '~tel, •' 1 ' `Ir r `,• j -j . �. Gkucesbr -MILmhallberp N 7''`,,CROS8ING SITE Lr) c:5 ! cm SMA ♦ _ _ I Nr.! I' ff' YOUTH 9rawu wy LOUfX 0 N C\iCRISER & TROUTMAN CONSULTING ENGINEERS plm 36M Pravu anA�ut; Sun 102 .rh e, µ'tJmclC% -'c"H Ulcim 29463 (91.0) 337-2529 Foot (910) 397-2971 32 "I`1E TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA OFSC91Rf10'1; DIRECTIONAL BORE CABLE CROSSING Ir DgMWL Om i 0Y5010 9�iEET: co, r s. LL - CD z Lc) :'' -A 0 N C\iCRISER & TROUTMAN CONSULTING ENGINEERS plm 36M Pravu anA�ut; Sun 102 .rh e, µ'tJmclC% -'c"H Ulcim 29463 (91.0) 337-2529 Foot (910) 397-2971 32 "I`1E TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA OFSC91Rf10'1; DIRECTIONAL BORE CABLE CROSSING Ir DgMWL Om i 0Y5010 9�iEET: co, r �NEsso�� JIedo SHOO �VNOUDI O =NOiLd�lvv<C39 VNI-10WO HPJON 'ONYISf SN:]MVH TIEWO ? ]N�AVM llgli IL6Z—L6l• (01Q -j &Z:U —LGC (UCGN CDpBL tartar "ININ 'Kcn?e"& Z_Dl AWS '2�tiO�y 1JaikQfl,� &3W SURNIDNa O�ilsZnsxo� KVIN.LfIDaLL ?? HHSIU3 r - ,oOI=.L :33tJOS •ONVAYHa Sot NO MkIMSV SI t ION %-� f 3MLL 31Hd 1V MME10-sled SVAA_-Murs %WCNnOB ON -C 133h'S I Y N l YY �I d 'RMVC1 SZ MON NO 03SYe 37dY SNOLLVA-TU 7W -1 33S 31U08d 2 0j N 'S310 N ry 01 U1 RV V W Ill 1 -J r 8 $ OO W O O Cid V�r+pp+ IN/l t + O Lin O O � CNA O + 1 ►Nit fi N C1�C/ —rc6l' ..._�1//._ ti y YT1 31bwlxoadcly u 8 $ ,e x 'n X ,01 A_13 VhlXC8ddY 3:LVAVOX3 — INIOd oNi--Lnd,, N O } S O O HLbON mF'(rtSSSr r ry U1 V W Ill 1 -J r 8 $ OO W O O Cid C"7 AUG -27-2001 MON 04:55 PM NC DIV OF COASTAL MGMNT FAX N0. 2522473330 P. 23 "PUT --IN" POINT - EXCAVATE APPROXIMATELY 10' X 20' X 8' PLAN sG1"-100' _, oo' APPROXIMATE "PUT --IN" POINT APPROX. 208' FROM BRIDGE ABUTMENT APPROXIMATE GROUND LINE i APPROXIM -WL 4 2 ,.�_.. 0 HWL s $ s __6 —_-- —S + 2 �--, — —12 —14 lb a>k b Q3—in 10 Oat N �.:: • ��` _ J�� - y _--� N n N N t3RIDCE asiT>.E t`_��-�� 5 No, 1 33_5 R„ iLROAD Eacf CF PAVEt.lEl,7 __ -- ELEV ,. 12 6E' "PUT --IN" POINT APPROX. 208' FROM BRIDGE ABUTMENT APPROXIMATE GROUND LINE i APPROXIM -WL 4 2 ,.�_.. 0 — —;— ---4 __6 —_-- —S 2 �--, — —12 —14 PX `10. H,,) AITACHMENT C � r STATE OF NORTH CAROLIN,\ DEPARTMENT OF TRANSPORTAMN DIVISION OF HIGHWAYS LYN Do T'PLTT GO VER;lOR SECRETARY July 16, 2001 COUNTY: Carteret (1e-01-22) SUBJECT: Encroachment Contract --- Time Warner Cable 9ruce Sheldon Construction Supervisor Post Office Box 999 Newport, N.C. 28570 Attached hereto, for your files, is a COPY of the Right of Way Encroachment Contract which has been properly executed. This contract covers the following: Installation of appro)dmately 3200 linear feet of steel casing for fiber optic cable along SR 1335 and under The Straits via directional bore as shown on attached drawings, APPROVEb SUBJECT Tp; (1) Notify the District Engineer's Of`ice in New Bern (252) 514-4716 prior to beginning and upon completion of work. (2) Workmanship and materials to conform to D.O.T. standards and specifications, (3) Contact the appropriate Utility Company(ies) involved and make satisFactory arrangements to adjust the utilities in conflict with the Proposed work prior to construction. (4) Any pavement or drainage structure disturbed or damaged shall be restared to its original condition as directed by the District Engineer. �- P.O. Box 178 Greenville, NI -C, 27S35 Phone- (250830-3420 pax: 51) FM `JC `F FfIX .`IG. 2�221� �3?C Tune VJ`arner CrAU;o _ C3ra,�at (1F 01-22} Pane (5) Traffic Control Devices sh,3if be in accordance with the Manual on Uniform Tra,Fic Control Devices and amendments or supplements therato Proper traffic control devices; signs, etc. shall be installed to insure public safety. (6) Trenching, bore pits, and/or other excavations shall not be tett open or unsafe overnight. (7) Fill areas/backfill material to be thoroughly compacted to 95% original density. All trencrned material shaft be compacted in maximum 6" layers by mechanical tamp or other previously approved method of compaction. Any material removed from the trench/pit that is contaminated or unsuitable for backfill shall be disposed of off DOT right of way. (8) Dress, seed and mulch all disturbed areas. This operation to be parformed on a weekfy basis. (9) Proper temporary and permanent measures shall be used to control erosion and sedimentation in accordance with all focal, State and Federaf regulations. (10) When surface areas in excess of one acre will be disturbed, the Encroaching Party shall submit to the District Engineer a Sediment and Erosion Control Plan which has been approved by the appropriate regulatory agency or authority prior to beginning any wont on the Right of Way. Failure to provide this information shall be grounds for suspension of operations. (11) It shall be the responsibility or the encroaching party to remove ail temporary erosion control measures once a satisfactory vegetative cover has been established. (12) Alf rO,,Uay signs are to be replaced befcre the end of the same work day. (13) No open cut of pavement will be permitted for this instalfation. (14) Remain 3 feet minimum or 1 foot distance per 1 foot depth from edge of pavement whichever is greater for shoulder installations, Remain 5 feet minimum from edge of pavement to edge of bore pit. (15) All concrete and asphalt driveways within NCDOT sight -of -way shall be crossed by dry bore methods_ Any deviation shall be by written Permission of the affected property owner and shall be warranted for 5 years to cover all damages resulting from the open cut. L P.O. Box 1573 Greenviife, N, .C. 27835 Phone: (252)830-3490 Fax, (252)530-3352 ;ii �T rime 'N�rnr�r C,.b' - C .rt�ret (18-� •?2) Parc , (16) Boring operations will be installed by an approved method by the Department as outlined in the manual "Policios and Procedures for Accommodating Utilities on Highway Rights of Way" (January 1, 1975 — Revised April 1, 1993). if these approved methods are not being used, the encroachment will be revoked. Any other boring operation will be approved by the Department on a case by case basis. (17) Strict compliance with the Policies and Procedures for Accommodating Utilities on Highway Rights of Way Manual shall be required. (18) In cases where less than minimum bury is necessary or where bores are greater than 6", the fiber optic cable shall be protected with a casing. (19) Splice boxes, pedestals, and other appurtenances shall be located at or beyond the right of way so as not to interfere with maintenance activities. (20) The Department of Transportation does not guarantee the right of way on these roads, nor will it be responsible for any claim for damages brought by any property owner by reason of the installation. (21) Upon completion of the work, the utility owner shall submit an "as built" set of plans to the District Englneeris Office which shall include accurate information as to the horizontal distance to the facility from edge of main travel way and general depth in relation to existing natural ground. (22) No portion of the Right of Way shall be used for parking of equipment during construction. Sincerely, C. E. Lassiter, Jr., P -E_ DIVISION ENGINEER CEL, jr: rrf Attachment cc: Mr_ J. B, Williamson, Jr., Manager of Right of Way Mr. A. C. Everett, District Engineer Mr. David Livingston, County Maintenance Engineer File P -O. Box 1578 Greenville, N.C. 27935 Phone:25Z { )530-3490 Fax: (252)530-3352 Hui) ff PROJECT �" STATE OF NORTH AROI INA F'! / �rt�� .. COLINrY OF pit v,l�� - SSL+ •rte DEPARTryENT OF TRANSPORTATION -AND- - RIGHT OF WAY ENCROACHMENT AGREEMENT' PRIMARY AND SECONDARY HIGHWAYS THIS AGREEMENT, made and entered into this the /Z day of C7l �c)/ by and between the Department of/ Transportation, party of the first art; an /1 r Par -EY of the socon part, W I T N E S S E T H: THAT WHEREAS, the party of the second part desires to encroach on tit right of way Of the publI roe day gn ted as Rnute J Y f.? Tf'/'"'J!� , located with the COnSLrUe[i m. yn end or crnc[jon o f•�, WHEREAS, It Is to the ma ter IaI advantage of the party of the second part to effect this encroachment, and the party of the First part in the exercise of authority conferred upon It by statute, Is willing to permit the encroachment within the limits of the right Of waY as Indicated, subject to -he conditions of this agreement; NOW, THEREFORE, IT IS AGREEn that the party of the first part hereby grants to the party of the second part the right and privilege to make this encroachment as shown on attached plan sheet (s), 3pecificatlons and special proviSions which are made a part hereof upon the following conditions, to wit; 11tet the thet Palati on, apefirson and aulntansr,oa of the above dea­3 Alcrlb•d fealllty will bo accorpllahed Sn a C"dA... with the Partly o! the first part's lot.rt OLI T; — on as toathonaa .t Mone and aJtendmen n there a ea Al • evF a CCC 1NG lffrLI fMAc- AolLclss end Y n • oN tl�e party of the first Part. Droa•dur•s aaY b• obtalnad trots the Dirt Lon Engineer or stateaUtll/ln ant o Y n4 t Is 11 l tYtl ntla u""d s•te r"Irandsppfropor rscond conditioon t•.J6at ita,IIIibooQeinrarr.aa himself to install and m Lntnin the oncroachlnq ol:e true! not antur(sre with the proper na lnisnance lRa Crof, to rolraburau with the r sn as ogee iteral upon •aid hag hway, nor tncurrn,J for y ropyaaLra or ranintonauco to Its ro4owaya and atructuras nocas wrYYdue to of the the first lnrtallat/un lstencu °f the fec111fLe• of the Part fir the „oat roy7lre the rernval t or ch in pity of the e.canV part, and 1[ of any time the party of the [lent part shaJ]a- bind• hln1 ell, his euccoa■ orernend seethe lest°Lion ul tRe cald fACLlttLea, that the to the ealtl requlroaont, wlthov qna, to TPe"Ptly meow• or alter the geld facllltloarty of the aucond tart t any coat to the Party at the first part, in ardor to co,tlorn altln•nrat rho party of (he •-tend Pert agrece to Provlaa during eenetruetlon and •ny suhaeryu•nt r,u iota r.o ncc ken gnat lJgh rA ftetIGqAlGA and other w rn log tlovfcce for the protection of traffic In conformance with the latest 1�,Jor _hn•1l n�_Tr� c f`n of D�a.lc o• �proper mut cr an to [ha nS ro ru ss and —r a� tt ons rwr.a cEt er n° gnwE�1 Lod A.andnante or ^ Past. ro,. aha Division Engineer'uppl•a•nts thereto• Infor• 71'4of the parry of the !,rat ty from all tdttpR7oArend f [h^ ciczntrlaatru hardy 09-04 eto iraemenfyfAnd -oro hnrmlons the party of the ileal part ersacl.,esnt, cls Lna J lRa[ wo ll,o lnetallatIon and malntonance of (hie on - That the party of the nncond rvfrt hVrooa to router, all areae disturbed during Installation to the aotlafacllon of tlta nlvle Lon Englncor of the party of the first ptrt. The party of the see ir.d to he every rtaoonat,io end rM lntenenoa P°llullon of rLrcr■ Prai.outlon durlLq eona[rucvlon and nalntenanco to prorcnt eroding of aail�aallLingeir GtollutLnn of the at' stroaira, lel•.ea, rcaorvofre, other atur trPoundnnn U, ground •urfetaa or other lvl•fan of Envlronacnt alezi hW n Ann) 17 p°?'pl lance with ar•r•l lenble rules and r•9wlatlono of the North C1rul tnA or fegul•elone of vnrieuo eountlou ort}' Ca rcllnn Sndironte cion Control Co.enlualon, end with ortllnancoe and control. when any inetallatlon" uru aalntensnti°aend ether nf[lctnl ageneter. ralating to pollution the party of the aaeond n� rl arrcoa to Pr•ruticn dlcturbs the ground our(acc and the Pollution Prarenrton and the e•ltlafactl f )ono r• ted replace the nrl or Llha rwlae raaatnblleh th g 4reund rover, vn vl thu Dlrlalon Cnglnr;nr of the party of the llrat part. o Vraoc corYr to hast T1mt :hu party ej the accord f»rt -green to h&c",, lhu .dual teat of Loa r"'c"Oe7' tY the U1 IC an Engineer ct the party, of thv "Sect pc -c, any lnsl'+ce2lon of the tory cats U oared trvcTh`n,tA party of the .cccnd port agrees to have evadable et the conat"ctlon alta, at all tta,ae Burin a lira[ a voPY of this a?r earent shat lr,y cv !done, of app rural by the re rty cf the d rat tort roaarvai tho right to ate g con - P all vwrY un to r.e arluenee of approval can ba ahovn. Pert, 21,a td rty of the 1'r Ovidod the work ,ontil—d In this ugrecnunl le iulnq portol'rad cn a cosi plolcd hl hva o party of the oceond part n�rc os to ql vn written net(co ei lM U1rlaJ on Englnoer of the vhon all tort ccnlolnod heron hna ben U y pen to first the vrlLton notlro of cird>lct w, Unlcas els eclltcllJy rnVtto sled L !hearty of the tint part C 4'zPl^!lits n! r:ork on h1v..vuY f•r i)aet'. under con•lrvctl en - ,II nat be requlrodf the flat part, of thTh"t in the talo of nuwampllance with the toren t[ LRIo :,•Trsnnent by the party of the second taoradafromatltca N htaofrte rho right In •top all wet until the. foe111C part g Y fee Losn trough! into coa.(lpslegpotar rt- Y �'Y t nt• cost t� lam 1%a:ty nl the fleet Tort. ll,nl 11 lu v.Jua.; :•r L,.16 p., ttYY l; v,t lata agrronanl .hal: l.an G,.:v va;d 1[ r+Anco„piato•r nvrctn an not n•xftt11 vllnln one Ill ynnr rroe coo data or 4trrha rl teTlon L the "I'll. written totter Se eacured },y tj1e n=lvvl conntrueLlan of taw u.lra f>rrty of tl,e second p•trt frca the Y tarty or the n r•c pare ' Duron the Carty of the fleet part, Ih•)eiraffir ser-fravm¢e thethte cintrorl to graecau lallo,afor itself, Its aaelgneea and euCCPoaora In lntercn2 !n[arrcr! to cGnLfatCOf-}, e• Car• ]Innen with ( LrLtcne•r ror,r i,c ;n ten e t or .li.tll "*rly with the 1?nVuIatlonr rola tiro to n,ndl zerinln_ aC on an vara Iy-u r.-aeT7' Requlntlono, Marc ?1, tl.o ? ref eLa U, (•• Ce FNrrtnont of Tre,nzportatf un, Title 19, Cod° o! Jbd, rel tla,,, ), which rr r,. herein lncoryuia C�eJ', 1'y 10 ilea �o t1 m4, (here,na (tor rale °",I d` a rrart of thte read to as [hc IctVula- con[ruct. FORM R/W 16,1 (Rev. ,July 1, 1977) 'u:� , r, , 4`l;�� ,, 7 F :r 'r ,� �:,�N r-rjV vc. �� , c. •1 ' . i 4th M •..I .glnare ,•1 Irw4,+. u, rrrA, a r """nal n4` "Jin to tai UIKtaJn and r•luAtIon of •YIJCOM Pulp[tactor•, tncL141n� �rA<u(•■enta 4`f eletorleln and lana■ Ol noull>Mnt,l1■ centrYoter •hell net Pa(tlel- in,1 elthdf 01r•Otty of lndlrea [ly to 1M dtaarl.l netlon prehlblted Ly .'1.Ot lona 11.3 O! the Reaulatlon•, lnalurllnp •■plevwent pr watts•. vh•n the aontradt cnref• n praprce at forth to ,%ppaAdIX U of the Reaulgtlone, o. .70110 one of .col. tgolu l•n`wIy}/ �T -I-n-a-� o �lfi�.UtlL yoipl-eaynt• 001, tract, 4`,r ••urar,. •upplad 1`d to w ueu o�if ot nequ/wlpct e<e:nr• l oerr eevho 1D.t eMLt [ Mtro foarl♦l e4•Under itounW• 11 L• notlflotl by the contractor of the eentr•eter'a obl� •el•n.ouwderal -UZOeetreetor of Rbgule a on• relatlr• to nenele0rl,.lnitlnn 4`,n tho �rounda .1 race, tJSl0 GOAtteat and the color, or national arta le. A. ^n^wrrl: :;n .,I Orterl •, IA• .raw t4`. •,u4` ew.11 " "' •^/ {AI/.ld, Ina <n•1111 wlOr a4`, as •II.IAf01Y 1104 -114 f•p4ft{ ranulfld of the Ileylalla.{, a1 J:f •all.. 1l •tttla IY ,fa fM10.1, r.<•r1<, ••tarwf•, .I\.♦ .•r r.• e! Inl•rMll•n. •we I,. fAalllll. •1 Y1' a• J111fw1n•• ey In. )•: a11••ai el .r•^. r•rany ,n1•Ilnw • • .• nl..wy •wwlwll t/•ll •n'4• •• p•rllle.t le ete</n In COeellw[. rlln Ir.\ a•grl•11ow1 •r Ill••. Ir.•. N.r l•rYll e. tea ..... at sl a <OAlraClef la 1• [A. •.lir{I.• ......e... e/ •n•Ih,/ `"•• (•111 or Nlrua 1• Lrnl In lel. Isle Wllan, la. Qnlfa<t•P'pall 14 ­tit,Ie 1L• ou•IIw•wl •f Tn,yern .l•w, •f lA• /.Nisi N17�'.Y •ee1.1. 1/•IIM .1 erre; rl•1 •, aM •MII ,•{ far t1` 4`•.1 [1l•r Ia 11 nJl Olde to obt•In the IAferYllo., •. l.wn 1• ] ter �e�l�o. Ilaw(i; In tlw •4`.a til u• c•nIn•fu •. w. •.►I uwu ri.A In• w•n.l•an ..n•1'on Orar7u•n. •I t■11 canln•t T• 1•J.r u.wl 1161.41.2, ,�LU.a .n•I I Lnw,. . •wtloot ,u<U on' JI It or the 4`a dant til glover .nnlnittru ,•n uy •.acral^. tw •• •11/'•4`4` la's, InalrJ int, art r.nl Iln,lcJ Is, -.w . (:1 rllwholJl Ap el prwta l/ :a Ina 64.14`64W vIWSP the contrJ01 uall the .e.fn<le/ elwnllu, u1/•♦ Ifl uw1•I LII«, t,4`+I w.0 on of f.ap.nllon of the'(.traet, In .1014 or in Date, f• Iwe nrventlww wl Prs.l•lu.. t\, ...ve<t.e I J tit PIr6.rcw.nt• or IerlJit n•II IAe1rJt tF1 7rOrlllOw/ -1 W Hilar\• "a" 4`F reJdh "/" Iw, •4`f •.aa•w.r•a{, Ih•n to, foo ao.tneter ch 111 ane lu ua of .O VI M'•wt, v.11u .••ql by Ih• A•g.1.Il..•. or Ile<tl.•Irl eve! e•rau•nl ,A• r.e•nl I Ira A let• ,u,1` •e IIM rltn 4`•.f •{{ l0 1wy {relent nal Of pra,coftYAl At the OeOarle.nl of (If.INIn IIs. rrOr le.1, hOwtv•r� thJt.'yAwth •fet Qr •4`A a•ten.r.•IH a L,aw actin. L.Jrin^e.frll IAfN 10.N .1 [A. JIIIlOe[IOw awl [. J S �•� IJ<e l•f1er CM: . re.rlt ./ .ran rinallac, In. c.Antlar war rr.4e.at In. 01 Nrlwul el ffut4`u l.11•n a .w,•4` Iwu , w Ilu•AU on 1• le glitch., el A•II. [•fall• •I .F ••Uel../ S••healllen, ch• d"tt"t., w.y r•gra61 Iha unit.• Il•1.1 to •wa.f Irl• 6wn II[Ip.tlon IN WIT?IESS WH MMM, oath of the partlos to this agreement has caused the lama to ba executed in tho day and year first above urittell. DEPARTMENT OF TRA PORTATION BYl DIVISIONdjNE1JR ATTEST 01 rJI=. s, /'% fJ 4`i"...)• r� T-' %•S/�-CAIli �� li✓�..t.� tee �s� Second Party ^ J-66 /� •4`+•Z, l�?r✓Y�/`l When FAa •p0'Icant II l cby,Ih-ll On Or . nrnlcl.•Ilty, tb lc ,gr•wet oust 1`•y the G9rp•r•ie ata: eM 1e •[[alto( Dy the c•ar poratlm .Gregory or 6y IcI I [a0. F city oleic lel, unlcl/ a wirer or corporate teal and Me,, tell -n by tA• Aur,t.ry r FY Ifo a•p04•ret City dff lclli II on File In he aalellh elf lc• el ch. Maw•q.r •/ Alght •/ Jay. In Ina qac• pra.lded In lhlt a!4`.6n•ne IsI .a •ertl.n, ln• naw. •/ t1`. nrPO ration e4` eunlclpell ly abell be t►ped ebev the nave int IIt11 e/ all per aan• a12-1-1 the .graan•nt Should be [yo.d directly a•leu th-Ir /1•n.lr1•, Thl, Info .9-_, 044`1{ Da ecce lip anted, In IFC rOre d( •n all's Ghw•At, by PIJAI of JI -Ing. 0•r1n1 In. fa111ving applI.W. I. All roadwyl and fanpS 7. p17h1 df ..ay lines and rh•r, ,ppllnblo, n U......I of •ce... llnet J. k "tldn of the chilling IWO( prcpOt'd tfefi.ehfAj 6. LanOth, 'lu and type of .Ate..c hw,•t t. M.Ihee o/ Initlll•tl-n b, OLenllon/ lhutln7 the dlit`nev free t1`. ._,.act._., t- .J q. of --t, inovl dere, atruct.f.e. etc, 7. teeallon 6y nipnray curry t+tion nln6ar, If tu[loncannot be ooulNd, lecatlen 'NJIJ ►• 6he..,. by JI,- Ylatanec from IOM[ .dant I'l/ale Pettit, Such At A bel4g,. rod , Interacllun, •tee (T..plat In r+q•ratloA of the •4 I.Igh1'••f ICalan, tn. Oepa nw.n.'a roaJr6y plane wSy le 'tut •1 Int rAlto., Mlghwy OSA lion OfflNt, e, at Sha rte 1.1 n 1 0. Drainage 'ttvelulse e, bre du ­ If Affect" by Ane... eA,w.nt 111`04 vtrtleal and hofltontel dl-cI lone fted, 1A6rN CR• wet t• Aur•ft f•rl of 61fve tura) S. Mc(hod of ate+cM•At to On lea q• nrrelurea or 6rlJga.. to. Manhole d. 117n II. on undergrounJ ytJ lit lA' MI. the depth of 4ury redo, all lnr•I.1 IAA.{, uwrld.n, Jltd,.a, .IJ w.. r„� ,,,• eng tn, Ili. rad type 0! •nt••wntregrfr.4. I. e'[Ia Sol y<ancfwt,noN[lon .1 to welAnd of clotting - boring and Jaebinp, .pen tut, rrc, erutlAt nCOU MM[)ITS Any •11•ehr.ne to • er107• a4` -that are ln.gt Ilrretufe waft be +Py/ova 1Y the Ilea( of tVuelvr. /•a law Iw 41.1[1` prior l0 /ubnlltlOn of aneroaehnml agreew.nt to the e1+Icl•n f....... ell ero•.Inp IhovN 6..S our •• 4`417161• norw.l to Ire atnlcrllnc of the hlgfluay. Ml n1^w re rel eel cl..nncal Of ov e4`nGd ulfel and cabltl sacra alI roed.,ayt 0446 con rafr to el•enncea tel cut 14 tA• Mell-n.l Clect rIA SAf.,y C.d., (nNllemts shell WOMI frac dllch III,. to dltth IlIt In eut aeetJa.t and S' 6cyend tae of Slopet In fel, .actlom. All van el Inn." 1. eelmdrd [o t1`. rlgh6 0/ .ay Ile: a4` ..-tnAr,.l<• r. rr.d a All spec .n e• . n .1 [e 4`•t.1.4l led Air- U h thell .cot the ltandifdtt Ind . peel l lcalloal f the t of n ant DapartA,Al. j. Any tluIrldGprovllOnl or IPlclflutlont It :a In. p{IlefNne• of IN. wrb .r ,,...thea or cAnitrrcll.n [het nay be rein red by 11`. D.n•rtw tit Haft Y. tFea a • ISM al Iched Ia G-c,O.cIInan/ egre.rgnt provldlJ tMat ..,a, in /o 4`w+tion wnnol b. 1Ftlrn nn Olen, or drarinyt. Th. peoartn<At'I Dlvl{t.n tng,n<<r .AorIJ 61 at+.n nallcc ay in,-ppl,e•nl 1111-1 to •ewal st"Ijov of In1tN NN on Inelv.ed In the. fgr<ewsn r. AI;(, -2;' 2011 MON 04:51 FM '1C D'1 ;F !;(;A:;Tr�l. MOMV'1 Fr.X `IG. 2522.17'1 CLP llr.:rc^cL,:� �•211;'Ill.:t.r.n pUn•.t_r RC GGrJI(.i)ai ;5dll •,vCt hdfln,• t�•r(h u!'Ut11;1 j�lrGlln�; or cnca,emC ;;j .n.ler caremea(s be alley, �Q• Smco() wall or Spiro( 1, eld ,tar! Pi e ? �U. b. ;ac::ed c;lrourh dr: buret �►;I! t1 , iar,er th1r, thu prpc bared proer2s,iV�ly a teed I;adinz ed;: or'hc adv r,cirt� i P Fa s spoil rnucad o\ the au�e- oac.l' through [he lot. > ro or Ills ne'.v se=;ion .)r th_ r,c�;zr ttt;t pine stroll be bLa-we ided plod. s, ttc Cir oorin, occr;ic:; prugr2 :o :he stC..on ;.rcvlousl. jacked mto pl-ca. Enc�serr:� res ;i:all ex(c 1dserotrt dcia lint ro di;c l litre In cut aCcuons. 5 b2.:onC the toe of slopes in rill s-c;lons. Ind ;' beh:r.j cars secticr.s. of Illi SIODi 'NC E, casernz nt P!oe C-'.1 (dr of Di:ctl Carrier pion .-A 11 10103 ar: cncoLon e1•!•:.r .x;Ir oL" OCC .a(v� the erC IJJt c.:..:' i ;d P1=e• 7r3L'.:101dS 3aal od In, tion -`;± .r, f ;,',d VO1�5 �11_r♦ w•Itil _ S:ZIiCG 1(; 011: 'OC Stc Oe . �!1C1idrTtd^� _ fit ;he .•. _. 1•.-• :o pr2�2r.: �t r, seRl:;t in th- ro_d•.\ay ^t ;tn o :.; lct:„ i5 L:!Cou tcrad ` CLC _ r iurlr+y the jor:n a.1d ,cl:- (?C -2r l ori. cape z..� ti !ems 'A ! a 1 3 o:: to ; to ,,.q,r i ro ba • ' ;:d r0r and c2 l�at j: Qu; 1I aL. ?C;�" .: CiSL'i (0 (Ili dll b i a 1 1'' l 2 iilt Cxcoss Vii.` IS to oiLl3 Jr ��r_ 'r'O ir. 51: � a^ '.�•�:! -� 3 :other boric, .1, i.,:2.- . ';1;.:,rs 3T0' Ch '.�_:I or T:i: i c �cr;rry 1ndj:tz!-i. iS �s ,01:t S: I- ;-; . �Qq ,1•iac:ri; i5. jpl�:ii. �rot_ct:t � cua[ir� or wall i " JlIt1R3. iicX",ess Or car7!!r IC2, u -- !ds, indcs� \ )r !z0% ,meatal cod_s. as 1\ell 1 P -ids, and c-chodic protecrion shzll spdciticatic so[.h, ' Dzpa;tme,;t of Tr2r.;COr.i:;icn. Ca3;:,h Pioe Shall beat the endo C=;:er. - " w oravz;,t t ow;'._ .vette ar.' is f ar r„ [h2 :r1C Qt ih: (op oP(h_ pipe orca;Eno 1L'ithin riches OFwa\ jitOlrl% Orc," de nlinirnutr[ A. Lor,g>itudirni In.,s;alliltions.... 8. Cros3inR; Ur,d:, Road\vays. ...,�...�.. ...,�................ �. .............. C. Cms3iR,S Under Ditches (pa\•2 av 3' (Below Travel Surface) vZ Unpaved)... .1• Nreilrots C1ii ""rS tl lmmahle CO[j'Qjl�'d 1SIYc, er�e��Tl7e'd Or L •q: l� CM;2. In [l0 CC,c. shall th- �ep(h of bl ry t)t Ie S t ,, 'la•-- -' (i$ 1r1i1t3 mLSt Cornpi Wictl &a C2. P2d2'^I and L'.:lI7J i1Rn a5 i1dicactd a, -Ove. Directional 13o;7e NCDOT right of — Directional methods have not been+ way, Under no, gi,�en st�•cwidz approval °or use on Utility pipelines condition be a11oti�•ed � q $hall jetting cutter head alone or wet boring with water of shall be Directional borin T using jeltitlg with Bentonite slurry at a used on tht� is approved tip of the drill strinv. S' tninirlu,'11 depth below the strecim bed and a 5' hori�orjtal for the creek crossings neo n:st par. t of any structure, win,',. X111, footnc; Clearance from the or pipe culvert. ATTACL HENT D DATE, June 8, 2001 SUBJECT: Planned Time Warner Cable Crossing near Harkers Island Bridge #73 Harker's on the east side NCSR 1335 and concerns from the adjacent southeastern riparian landowner. Located within the Straits area of Carteret County, North Carolina. TO: Ms. Terri Barrett Mr. Don Butler CAMA Office Criser & Troutman Engineers NCDE&NR Division of Coastal Management 3809 Peachtree Ave, #201 151-B NC Hwy 24W, Hestron Plaza II P.O. Box 3727 Morehead City, NC 28557 Wilmington, NC 28406-3727 cc Mr. R. Wheatly, Atty (910) 397-2929 (910) 397-2971 (fx) As adjacent riparian landowners to the southeast of the planned Time Warner Cable Crossing we have the following concerns: Our property corner is —300 ft south/southeast from the south end of Harker's Island bridge, our deed (Book 872: Pg 168) includes riparian and littoral rights from this property corner, north to the actual bridge structure or The Straits . This was agreed upon when NCDOT or NC Highway Commission built the current road & bridge structures to Harker's Island (Book 306; Pg 499 11/01/1968). While we have no problem with constructions within the 60 ft right- of-way, we do object to any structures outside of the 60 ft right-of-way and any direct or indirect effects this project may have upon our riparian & littoral rights to this property. The plans incorrectly show the NCDOT right-of-way to be 100 ft wide. The highway right-of- way is only 60 ft wide. The cable boring according to the letter is suppose to be in the right-of- way. If it is in the 60 ft right-of-way we have no objections. If it is outside this 60 ft right-of-way it will likely effect our properties and/or riparian property rights. Please check your drawings and the right-of-way width for correctness. We would like detailed drawings of what is being planned, its location, and potnetial impacts to our properties. Thank you. Hollis L. Batson & Lawrence F. Baldwin (910) 686-4034 137 Stoneybrook Rd, Wilmington, NC 28411 Project Locatlon (County, State Road, Water'sody, etc.) �' lype of Project Activity 6..r( � ll` t -r;: >>r 1 ,_.5-- PROJECT DESCRIPTION 20,)1 116!1 04:413 FM `IC G''v )F i;i;ri Tr,L MGTI"r Ft?X V0. 25'1?17?33C AT.r E jibs 1 -• � . fJ 1 CAMA and DREDGE.'AND FILL (SCALE'. .N ,r.. E,ti:; R A �: �a of rel..', r Ir r%)- as:authorized by the State of North Carolina Pi N (dock) .Langlh , ;Department of Environment and Natura)'Resources'and the Coastal Resources Commission,. • . . in an area of environmental concer pursuant to 15 NCAC _ �i .1, i.. ,�^•( Applicani Natnc I , r' E� t hone Num Addre/art Ci (� � . �a'�,�i'� �-�:�,. state `-'f � A. I Project Locatlon (County, State Road, Water'sody, etc.) �' lype of Project Activity 6..r( � ll` t -r;: >>r 1 ,_.5-- PROJECT DESCRIPTION SKETCH --- -• � . fJ 1 1 I J I (SCALE'. r Ir r%)- Pi N (dock) .Langlh .�L, numbv ( C 8ulkhead'�enph miii. diuince'afhhan - 1 ' a. ` J j t t •` �{ - ` ,I r. .ti ,lamJ 92sU, d" mandoits di r � 'sr 9 }�• ._ _ _ t f � � jj CubIC yards _ y Boal ramp dhnenslons '" • othei i JI (\ (/ti - / i 1�C \ -:: �tJ�ri` -Z- -� -1 ( — d �..r• ;- ', ;'' This permitIs subJectto compliance with this application, -`site drawing a�hd attached general and speciric' conditions. Any vlolation of these terms' ` may subject; the permittee to a .fine, imprisonment orcivil action; and _ may cause the.permit to become null and void::" :. :',This permit must be'on the project site and accessible io the permit of-' ficer'when 'the project is inspected fornce. Thi'appljcant certi- . fes by signing this permit that 1) this project iscampli.aconsistent- •th•th 1 1 - • • : appll an ,itofficer's signature '••land use plan and all.local ordinances; and z) a written statem n't has 1 issuing date'lration date been obtained from: itdjatent riparian landowners certifying that they • • _'_ l jh! . �� (1 have no I.objections to the proposed work. 3tr3chments � ' In issuing this permit the State of North Carolina certifies that this project • ^J� is consistent withth North Carolina Co9tal Management Program.' �r(` `� . C� application fee - - - - -- North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Euley, Governor Bill Ross, Secretary Dow& D. Moffitt, Director Augusc 6, 2001 Ms. Hollis L. Batson & Mr. Lawrence F. Baldwin 137 Stoneybrook Road Wilmington, NC 2841 L Dear Ms. Hollis and Mr. Baldwin: ATTACI-HENT E 7*AA NCDENR This correspondence is in reference to your June 8, 2001 objection letter to the recent cable crossing project proposed by Time Warner Cable located near the Harker's Island bridge, on the east side of NC 1335, in Carteret County. The proposal involves the installation, via directional boring, of 3200' of fiber optic cable within the D.O.T. right -of - way. It appears that your concern focuses on ensuring that the project is actually located within the road right-of-way. As I understand the situation, a new right-of-way agreement has been signed and dated on 7/16/01. The permit applicant has assured the Division that the current project is within the agreed upon right-of-way. Based on this latest information, the North Carolina Division of Coastal Management has careful reviewed your objections and has determined that the project is consistent with the pertinent regulations of the Division. Therefore, on August 1, 2001, the Division issued CAMA General Permit /t28152 -C to Time Warner Enterprises for the aforementioned work. If you wish to appeal this permit decision, you may file a request with the Director of the Division of Coastal Management, Department of Environment and Natural Resources within 20 days of the permit decision. If you have any questions regarding this matter or would like to request a copy of the permit, please do not hesitate to contact Tere or me at our Morehead City Office (252-808-2808). Sincerely, T-e�TICL// M. Ted Tyndall District Manager cc: Charles Jones - Assistant Director, DCM Tere Barrett - Field Representative, DCM Morehead City District, 151-B Hwy. 24, Hestron Plaza 1I Morehead City, North Carolina 28557 Phone: 252-808-2908 1 FAX: 252-247-3330 1 Internet: http://dcm2.cu.state.nc.us/ AN EQUAL OFPOR17JNTTY 1 AFFD ATiVE ACTION EWLOYER — 5CoA RECYCLED / 10% POST CONSUNC-R PATER ATTACFNELNT C DATE: August 10, 2001 SUBJECT: CAMA permit and planned Time Warner Cable Crossing near Harkers Island Bridge #73 Harker's on the east side NCSR 1335 and concerns from the adjacent southeastern riparian landowner. Located within the Straits area of Carteret County, North Carolina. TO: Ms. Donna Moffitt, Director Mr. Don Butler NCDE&NR Division of Coastal Management Criser & Troutman Engineers 1638 Mail Service Center 3809 Peachtree Ave, #201 Raleigh, NC 27699 - 1638 P.O. Box 3727 (919) 733-2293 Wilmington, NC 28406-3727 cc Mr. R. Wheatly, Atty at Law (910) 397-2929 cc CAMA Morehead Office (910) 397-2971 (fx) This letter is serve as our formal objection and appeal with the NCDENR - CAMA permit #28152-C within the 20 day allocated time period for a Time Warner cable crossing within our riparian/littoral rights as adjacent property owners. Our main objection is the stated project is to be within the NCDOT right-of-way which is 60 ft wide, but the project shows a 100 ft wide right-of-way where the actual project is to take place. Thus, the cable project is not within the NCDOT right-of-way, but within our riparian/littoral rights area. Our principle objection is NCDOT and utility projects similar to this one, want to use the NCDOT right-of-way but consistently and incorrectly state it is a 100 ft right-of-way, rather than 60 ft wide. Basically our riparian and littoral rights are being infringed upon, if not completely ignored. The CAMA letter of 08-06-2001 also states a "new" right-of-way agreement was signed and approved on 07-16-2001. We have not been contacted and have no knowledge of any "new" right-of-way agreement. As previously stated in our former correspondences, our property corner is —300 ft south/southeast from the south end of Harker's Island bridge, our deed (Book 872; Pg 168) includes riparian and littoral riqhts from this propertv corner, north to the actual bridge structure or "The Straits". This was agreed upon when NCDOT or NC Highway Commission built the current road & bridge structures to Harker's Island (Book 306; Pg 499 11/01/1968). While we have no problem with constructions within the 60 ft right-of-way, we do object to any structures outside of the 60 ft right-of-way and any direct or indirect effects projects may have upon our riparian & littoral rights to this property. Plans incorrectly show the NCDOT right-of-way to be 100 ft wide. The highway right-of-way is only 60 ft wide. We have not been informed or have any knowledge of any "new" 07-16-2001 right-of-way agreement. Any project outside this 60 ft right-of-way will effect our properties and/or our riparian/littoral property rights. Again this letter serves as our formal objection and appeal against this project if it is outside the recognized NCDOT 60 ft right-of-way. We are seeking legal counsel to prevent any encroachment or loss of our riparian/littoral rights within these properties. Thank you. k�w ��OL Hollis L. Batson & Lawrence F. Baldwin (910) 686-4034 137 Stoneybrook Rd, Wilmington, NC 28411 AUi;. -? ID l 17E 1 1 I - 1- DEHNR COSTAL k,101T P12B5706.BMP DCM FORM i L4wrrltce � G,;H PETIT'IONER'S NAME fi p /l, G. 4 lar Q ti COUNTY C v f se - e t FILE NUMBER {PCtidoner leave this line blank) TEL:919 -55 1495 ATTACHMENT f [ RECEIVED AUG ?- 1 2001 COASTAL MANAGEMENT THIRD PARTY HEARING UQ[1EST ON CAMA PERMIT D13CISION PLEASE TAKE NOTE that the undersigned, a perwn affected by the decision of (check enc): a LOCA Fwmit Officer acting on a CAMA Minor Develoymi Permit appucation; or the Division of Coutal MAnagirnent, Department of Environment and Natural Resources, acting on a CAMA Major Dovolopn=t Permit applicadon or LAMA OcncrM Permit applica ioa litrcby requests permission from the Coastal Rwources Comalinsion to file an appeal pursuant to N.C. Glen. Stet. § 113A -121,1(b) and N.C. Admin. Codo tit. 15A, r. 710300 (Plaare artach a copy ofthe permit appllmlon der -004 1fyou cannot obtain a copy ofA& permit tpplicatton decision, please provide the name of the permittee, the project location and rhe permirnmunber.) Requests are reviewed by the Chapman of the Coastal Resources Corrwm scion to determine whether a hearing should be granted. The dete�minxtion of whathar to grant a ldag is is the sole discretion of the Chairman. N.C. Admin, code dL i SA, r. 71.0101(b). For this application to be totaplctc, the Pctitionor must address oath factor Iistcd below on a separate sheet of paper. You moat address these factors before your rrqumt will be reviewed. The Chairman's decision to giant a haa64 will be based on whether the Petitioner. (1) Haw alleged that the decision is cwt-ary to a s=e or wle (N.C, Geri. Stat. � 113A -121.1(b)(01; (Please cite the statute or regulrnion allegedly violated by the permit dacisivn. ) (2) Is di,rrctly aff ctad by tho decision [N.C, Gen. Stat. § 113A -121.1(b)(2)1; and (pleare dirseribe haw you are directly qffeetad by the permit dectsion- Persoat directly el fecred by a dec%rion include, bur ars not hmited to: (a) am owner of real property in the vicinity of thea property to be drmloped who eon Thaw 0wr the prppored development it 11k3ly to have a significant adverse ipTjct on the value and enjoyment of his property; and (b) aqV p,raon who crm dei"o,6s ore a hirlory of subsrnmial use ofpublle resources In the area directly affected by tho P 00? AUf; - 21' 01 M,EI I I - I - DEHNR USTAL ';1017 P1285442.BMP TEL:919 733 1495 P 003 davelopmfnt when lha dew/opwont fs wirhln or roaches upon an wva Mjecr to the public tram.) (3) Hw allegod facts at made legal erg=== that demona mto that the requast for the bearing is not (}ivolnus [N.C. Ocu. Stat. 6 113A -121.1(b)(3)]. (Plaase summarise the evUrnce or argvmentr you will presser at a hearing in ,rapport Qf yow appeal.) Band on the attached ruponseo to the above factors, the undersigned hereby requests a third piny herlring. 9' -~ / 9 Date jpaturo of Petitioner or Attomey Ce /,C- Al /Wt, Noma of�Petitionay�or Attorne y / L �1 12 Address City Stato Zip Teiephoue Number NOTES: This request rnwt bo served on the Director, Division of Coastal Management, at the addrem shown on the attached Cexti&MC of Service Form, within twenty (20) days of the diegutedpermit decision. N.C. Cion_ Stitt. § 113A -121.1(b). Failure to do so consii ft= waiver of the right to requwt a hearing. A copy should also be scat to the Attomry 0mral's OfEm Environmental Aivision4 at the addmsses jhoW]% ori the &tWU4 Cmtifieitte of Service Form. Approval of a Third Party Hearing Request allows a petitioner to ale ti coatcd*d case petition with the Office of Adminimt vt Bearings within twenty (20) days of rcccipt of tho Chairmen's Order, N.C. G n. Stat. § 113A -121.1(b). Dcnial of a Third Party Hearing Request is a final agency decision which may be appealed to t1t4 Superior Court in the county when the property Is located under N,C- Oren. Stat. § 113A -121,1(b) and Chapter 1508, Article 4. al!r,. -21 01 ITI;EI I1 ; 1- DEHNR CUST�L M(INIT TEL;919 1495 P. 004 P1284152.BMP CERTIFICATE OF SPAVICE I hereby ceatify that this "Third Party Hearing Request hes been sawed on dw Sate agencies named below by deposidq copies of it with the United States Postal Service with sufficient postage fm delivery by mail or by personally debverinq copies to the named agoncioa. �- brlginal served = Dircctnr Divisiou of Coww Muraganutt 1631 Mai Service Center Meigh, NC 27 699-1 63 9 and a copy served an: Attorney (}atter N Office Environmental Division P.O. Box 679 Mc,ig% NC 27602-0629 This the 2-6 6day of Stgnut = of Petitioner or Attorney LTF/30110/rrp tlpdmcd: July rd, 1999 AUG. -21' U i71 -'EI I1 - lDEHNR DOSTIL MMMT TEL:919 755 1495 P 00 1'Lzmztlnu.bmt North Carolina Depmmant of EnvironmcM urd Natural Rcsourres Division of Coastal Managemant Michad F. 94sky, Gavereor Bill Rasp, Secretary Donca D. Moffitt, Virrtdr August 6, 2001 Ms. Hollis L. Batson & Mr. Lawrence P. Baldwin 137 Stoneybrook Road Wilmington, NC 28411 Dear Ms. Hollis and Mr. Baldwin: ��n NCDENR This correspondence is in reference ro your June 8, 2001 objection letter to the recent cable crossing project pmposcd by Tirnr Warner Cable located near the Harker's Island bridge, on the east side of NC 1335, in Carteret County. "Ile proposal involves the installation, via dir mional boring, of 3200' of fiber opric cable within the D.D.T. right -of - ,way. It appears rU your co=rn focuses on ensuring that the prvjoct is actually located within the road right-of-way. As I understand the situation, a now right-of-way agreernent hae been signod and dated on 7/16/01. The permit applicut has assured the Division that the current project is within the agreed upon right-of-way. Based on this latest information, the Nortb Carolina Division of Coastal Management has careful reviewed your objections and has determined that the project is consistent with the pertinent regulations of the Division. Therefore. on August 1, 2001, the Division is6uod CAMA General Permit #28152-C to Time Warner Enterprises for tt aformen4oned worn. If you wish to appeal this potmit decision, you may file a request with the Director of the Division of Coastal Management, Deparunent of Environment and Natural Rcsoumc6 within 20 days of the permit decision. If you have aay questions regarding this matter or would lilm to request a copy of the permit, please do not hesitate to contact Tere or me at our Morehead City Office (252-608-2806). Sincerely, M, TO Tyndall Distrlet Manager cc: Charles Jones - Assistant Director, DCM Tere Aarretl - Field Repmentativc. DCM Morahead City pistric t; 151.14 Hwy- 24, Hestron Plaza q Morcfread City, North Cm-alina 28537 Phone: 252-808-2808 1 FAX 252-247-3330 1 Internet: http:/JdCM2.em-state.ne.ys/ AN � P4UAL OMRTTv `/�}�,}„!, 7M ACT}UN FMPLOYER - io% RECy=1 105'1 POST CON3UNER PAPER AUG. -'-1' O1 ITI;EI 11:18 DEHNR COST:IL KNIT TEL.919 -33 I495 DATE: August 10, 2001 SUBJECT: CAMA permit and planned Time Warner Cable Crossing near Markers Island Bridge 473 Harker's on the east side NCSR 1335 and concems from the adjacent southeastern riparian landowner. Located within the Straits area of Carteret County, North Carolina. TO: Ms. Donna Moffrtt, Director Mr_ Don Butler NCDE&NR Division of Coastal Management Criser & Troutman Engineers 1638 Mail Service Center 3809 Peachtree Ave, #201 Raleigh, NC 27699 - 1638 P.O. Box 3727 (919) 733-2293 Wilmington, NC 28406-3727 cc Mr. R. Wheatly, Atty at Law (910) 397.2929 cc CAMA Morehead Office (910) 397-2971 (fx) This letter is serve as our formal objection and appeal with the NCDENR - CAMA permit #28152-C within the 20 day allocated time period for a Time Warner cable crossing within our riparian/littoral rights as adjacent property owners. Our main objection is the stated project is to be within the NCQOT right-of-way which is 60 ft wide, but the project shows a 100 ft wide right-of-way where the actual project is to take place. Thus, the cable project is not within the NCDOT right-of-way, but within our riparian/littoral rights area. Our principle objection is NCDOT and utility projects similar to this one, want to use the NCDOT right-of-way but consistently and incorrectly state it is a 100 ft right-of-way, rather than 60 ft wide. Basically our riparian and littoral rights are being infringed upon, if not completely ignored. The CAMA letter of 08-06-2001 also states a "new' right-of-way agreement was signed and approved on 07-16-2001. We have not been contacted and have no knowledge of any "new" right-of-way agreement. As previously stated in our former correspondences, our property comer is -300 ft south/southeast from the south end of Harkers Island bridge, our deed (Book 872 Pq 168) includes riparian and littoral rights from this property corner north to the actual bridae structure or "The Straits". This was agreed upon when NCDOT or NC Highway Commission built the current road & bridge structures to Harkers Island (Book 306; Pg 499 11/01/1968). While we have no problem with constructions within the 60 ft nght-of-way, we- do object to any structures outside of the 60 ft ripht-of-wav and any direct or indirect effects projects may have upon our riparian & littoral rights to this oronerty. Plans incorrectly show the NCDOT right-of-way to be 100 ft wide. The highway right-of-way is only 60 ft wide. We have not been informed or have any knowledge of any -new" 07-16-2001 right-of-way agreement, Any project outside this 60 ft right-of-way will effect our properties and/or our riparian/littoral property rights. Again this letter serves as our formal objection and appeal against this project if 4 is outside the recognized NCDOT 60 ft right-of-way. We are seeking legal counsel to prevent any encroachment or loss of our riparian/littoral rights within these properties, Thank you. P. 006 Hollis L. Batson & Lawrence F. Baldwin (910) 686-4034 137 Stoneybrook Rd, Wilmington, NC 28411 AUG. -21' 01 ITLEI 11.18 DEHNR GOSTIL ,41G,117 TEL:919 1495 P IN- DATFz June 8, 2001 SUBJECT: Planned Time Warner Cable Crossing near Harkers Island Bridge 973 Harkers on the east side NCSR 1335 and concerns from the adjacent southeastern riparian landowner. Located within the Straits area of Carteret County, North Carolina. TO: Ms. Tern Barrett Mr. Don Butler CAMA Office Criser & Troutman Engineers NCDE&NR Division of Ceastal Management 3809 Peachtree Ave, #201 151-B NC Hwy 24W, Hestron Plaza II P.O. Box 3727 Morehead City, NC 28557 Wilmington, NC 28406-3727 cc Mr. R. Wheatly, Atty (910) 397-2929 (910) 397-2971 (fx) As adjacent riparian landowners to the southeast of the planned Time Wamer Cable Crossing we have the following concerns: Our property corner is -300 ft south/southeast from the south end of Markers Island bridge, our dogd, Book 872- Pg 166) includes riparian and littoral rights from this proosqy corner, north to the actual bridge structure or "The Straits". This was agreed upon when NCDOT or NC Highway Commission built the current road & bridge structures to Harkees Island (Book 306; Pg 499 11/01/1968). While we have no problem with constructions within the 60 ft right- of-way, we do object to anv structures outside of the 60 ft right-of-way and anv direct or Indirept effcts this prgLect_ a have upon our riparian & littoral rights to thjs roe . The plans incorrectty show the NCDOT right-of-way to be 100 ft wide. The highway right -0 way is only 60 ft wide. The cable boring according to the letter is suppose to be in the right-of- way. If it is in the 60 ft right-of-way we have no objections. If it is outside this 60 ft right-of-way it will likely effect our properties and/or riparian property rights. Please check your drawings and the right-of-way width for correctness. We would like detailed drawings of what is being planned, its location, and potnetial impacts to our properties, Thank you. Hollis L. Batson & Lawrence F. Baldwin (910) 686-4034 137 Stoneybrook Rd, Wilmington, NC 28411 MEMORANDUM Stille (A North ("imolhid l)('T)iiri wilt O1 Jttsti('c- li;\I_la( it i 2760:2-06:25) TO: Eugene Tomlinson, Chairman, CR(-' Donna Moffitt, DCM, Raleigh Charles .tones, DCN/1, Morehead (_'itv Ted Tyndall, DCM, Morehead City Terre Barrett, DCM, Morehead City Ryke Longest, DOJ FROM: David [-Teeter -Df� DATE: August 24, 2001 Reply (o: Ua�nl( Ilecter limiruumental Dnlsum I el: t9I ))?16-(,954 Fav (1)19) -Io.n'o' dlwi el Y(;ilwl. n1s,:,w1v,I1C. A'uG 31 2001 AD RE: Third Party Hearing Request by Lawrence Baldwin and Hollis Batson, Carteret County Lawrence Baldwin and Hollis Batson seeks permission to challenge a CAMA permit issued to Time Warner Cable for a cable crossing near Harker's Island bridge. Thev allege that the crossing is outside the Department of Transportation's right-of-way and within their zone of riparian access. A copy oftheir hearing request is attached. I need a copy of the permit application, site drawings, CAMA permit, and anything else You believe will be helpful. In addition, I need the Division's comments on their hearing request. Chairman Tomlinson will have to make a decision by September 5. Please provide me with these iiwelials and your comments by August 30 to avoid any conflict with the upcoming holiday. EP50003 '7 Aga NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Al Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary Mr. Don Butler Time –Warner Cable 3809 Peachtree Avenue Suite 102 Wilmington, NC 28406 Dear Mr. Butler: 22 August 2001 —� AUG 3 , 2001 CERTIFIED MAIL RETURN RECEIPT REQUESTED Re: Suspension of Work / Appeal of CAMA Permit Decision The Chairman of the Coastal Resources Commission, Eugene Tomlinson, has received a request for an administrative hearing to challenge CAMA Permit 28152-C. The Third Party Hearing Request was filed on behalf of petitioner on August 21, 2001. Under N.C.G.S. § 113A-121.1 (the Coastal Area Management Act), your CAMA permit is automatically suspended upon receipt of a hearing request and will remain suspended until either: (1) the Chairman denies the hearing request (under standards set out in the statute); or (2) there is a final Coastal Resources Commission decision on the permit appeal. You may not undertake any development under the permit decision until further notice after Chairman Tomlinson issues his decision. The Division of Coastal Management will prepare a recommendation for the Chairman on whether to grant or deny the hearing request. The Chairman must make a decision within 15 days after receipt of the hearing request, in this case no later than September 5, 2001. If you wish to submit any materials for the Chairman's consideration in ruling on the request for contested case hearing, please send them to me as soon as possible. Sincerely, Donna D. Moffitt cc: Chairman Gene Tomlinson Ryke Longest Jessica Gill Dave Heeter Meme Jo Alcoke Tere Barrett Ted Tyndall Charles S. Jones 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: hftp://dcm2.enr.state.nc.us An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper DATE: August 10, 2001 AUG 13 2001 A 9 SUBJECT: CAMA permit and planned Time Warner Cable Cros'ingi�)eA—qj d Bridge #73 Harker's on the east side NCSR 1335 an _s adjacent southeastern riparian landowner. Located within the Straits area of Carteret County, North Carolina. TO: Ms. Donna Moffitt, Director Mr. Don Butler NCDE&NR Division of Coastal Management Criser & Troutman Engineers 1638 Mail Service Center 3809 Peachtree Ave, #201 Raleigh, NC 27699 - 1638 P.O. Box 3727 (919) 733-2293 Wilmington, NC 28406-3727 cc Mr. R. Wheatly, Atty at Law (910) 397-2929 cc CAMA Morehead Office (910) 397-2971 (fx) This letter is serve as our formal objection and appeal with the NCDENR - CAMA permit #28152-C within the 20 day allocated time period for a Time Warner cable crossing within our riparian/littoral rights as adjacent property owners. Our main objection is the stated project is to be within the NCDOT right-of-way which is 60 ft wide, but the project shows a 100 ft wide right-of-way where the actual project is to take place. Thus, the cable project is not within the NCDOT right-of-way, but within our riparian/littoral rights area. Our principle objection is NCDOT and utility projects similar to this one, want to use the NCDOT right-of-way but consistently and incorrectly state it is a 100 ft right-of-way, rather than 60 ft wide. Basically our riparian and littoral rights are being infringed upon, if not completely ignored. The CAMA letter of 08-06-2001 also states a "new" right-of-way agreement was signed and approved on 07-16-2001. We have not been contacted and have no knowledge of any "new" right-of-way agreement. As previously stated in our former correspondences, our property corner is —300 ft south/southeast from the south end of Harker's Island bridge, our deed (Book 872: Pg 168) includes riparian and littoral riahts from this propertv corner. north to the actual bridoe structure or "The Straits". This was agreed upon when NCDOT or NC Highway Commission built the current road & bridge structures to Harker's Island (Book 306; Pg 499 11/01/1968). While we have no problem with constructions within the 60 ft right-of-way, we do object to any structures outside of the 60 ft right-of-way and any direct or indirect effects projects may have upon our riparian & littoral rights to this propertv. Plans incorrectly show the NCDOT right-of-way to be 100 ft wide. The highway right-of-way is only 60 ft wide. We have not been informed or have any knowledge of any "new" 07-16-2001 right-of-way agreement. Any project outside this 60 ft right-of-way will effect our properties and/or our riparian/littoral property rights. Again this letter serves as our formal objection and appeal against this project if it is outside the recognized NCDOT 60 ft right-of-way. We are seeking legal counsel to prevent any encroachment or loss of our riparian/littoral rights within these properties. Thank you. CIL Hollis L. Batson & Lawrence F. Baldwin (910) 686-4034 137 Stoneybrook Rd, Wilmington, NC 28411 f��?~i�I..�''_.'7�{i�'�F�ti::F3:E3��T_'�"Fi�E+..-F i=F � _ _ i ��ef;$�. � e �•' .�.F�i�3:iii='k-3�'F+Z:'.f�E3:..f3;..F�li�'i �F i::.F 3=F3=:F i�F3�3� TIME WARNER ENTERTAINMENT COMPANY ADVANC�rrr4,111=WHOUSE NO. 0061545 160 INVERNESS DRIVE WESI - P.O 81>X (ry) ENGLEWOOD, COLOnA00 80155 1.659 (103) 7144 1200 PAY ONE HUNDRED DOLLARS AND TO DEHNR I A'(ABLE I111I000I I MEL LUN BANK, NA. P11 I SBURGFI. PA 15259-0001 60 1601433 N01100 =_ - ------- _------_--_-_-- --- _---------- ---- NO F M ID AF fEI i 161 l I�AfE AMOUNT DAYS rRonn.umt r1r I^Sur 1 5/ 4/ 0.1 laoo. 00 THE MOREHEAD CITY REGIONAL OFFICE ORDER 151-B HIGHWAY 24 - - OF HESTRON PLAZA #2 L MOREHEAD CITY NC 28557(Sa 3� 3� f.�F i,E is F i� 3� 1~E i✓.i i::f 3�F L',F 3�F L=F i_'� T'E i::f i'F C:F 3"S T �E - e ' - - i e , e - - e : e t • s r., • .- r � i=F 3-F s_E i�f 3 :Y >r:i i�'f t.i 3::} 3=E i�.F -i""% i::f i�E i:.S 4�_� �E 11'000006154511' 1:0433016011: 0931118040111 North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Bill Ross, Secretary Donna D. Moffitt, Director August 6, 2001 Ms. Hollis L. Batson & Mr. Lawrence F. Baldwin 137 Stoneybrook Road Wilmington, NC 28411 Dear Ms. Hollis and Mr. Baldwin: �4n NCDENR �1� This correspondence is in reference to your June 8, 2001 objection letter to the recent cable crossing project proposed by Time Warner Cable located near the Harker's Island bridge, on the east side of NC 1335, in Carteret County. The proposal involves the installation, via directional boring, of 3200' of fiber optic cable within the D.O.T. right -of - way . It appears that your concern focuses on ensuring that the project is actually located within the road right-of-way. As I understand the situation, a new right-of-way agreement has been signed and dated on 7/16/01. The permit applicant has assured the Division that the current project is within the agreed upon right-of-way. Based on this latest information, the North Carolina Division of Coastal Management has careful reviewed your objections and has determined that the project is consistent with the pertinent regulations of the Division. Therefore, on August 1, 2001, the Division issued CAMA General Permit #28152-C to Time Warner Enterprises for the aforementioned work. If you wish to appeal this permit decision, you may file a request with the Director of the Division of Coastal Management, Department of Environment and Natural Resources within 20 days of the permit decision. If you have any questions regarding this matter or would like to request a copy of the permit, please do not hesitate to contact Tere or me at our Morehead City Office (252-808-2808). Sincerely, �Ci M. Ted Tyndall District Manager cc: Charles Jones - Assistant Director, DCM Tere Barrett - Field Representative, DCM Morehead City District, 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 Phone: 2_�2-808-2808 \ FAX: 252-247-3330 \ Internet: http://dcm2.enr.state,nc.us/ AN EQUAL OPPORTUMTY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER DATE: June 8, 2001 ' JUN 12 200': COASTAL MMF/I EJv0E x,.^Zry Carr r, r SUBJECT: Planned Time Warner Cable Crossing near Harkers Island Bridge #73 Harker's on the east side NCSR 1335 and concerns from the adjacent southeastern riparian landowner. Located within the Straits area of Carteret County, North Carolina. TO: Ms. Terri Barrett Mr. Don Butler CAMA Office Criser & Troutman Engineers NCDE&NR Division of Coastal Management 3809 Peachtree Ave, #201 151-B NC Hwy 24W, Hestron Plaza II P.O. Box 3727 Morehead City, NC 28557 Wilmington, NC 28406-3727 cc Mr. R. Wheatly, Atty (910) 397-2929 (910) 397-2971 (fx) As adjacent riparian landowners to the southeast of the planned Time Warner Cable Crossing we have the following concerns: Our property corner is —300 ft south/southeast from the south end of Harker's Island bridge, our deed (Book 872: Pa 168) includes riparian and littoral riahts from this prooertv corner. north to the actual bridge structure or "The Straits". This was agreed upon when NCDOT or NC Highway Commission built the current road & bridge structures to Harker's Island (Book 306; Pg 499 11/01/1968). While we have no problem with constructions within the 60 ft right- of-way, we do object to any structures outside of the 60 ft right-of-way and any direct or indirect effects this project may have upon our riparian & littoral rights to this property. The plans incorrectly show the NCDOT right-of-way to be 100 ft wide. The highway right-of- way is only 60 ft wide. The cable boring according to the letter is suppose to be in the right-of- way. If it is in the 60 ft right-of-way we have no objections. If it is outside this 60 ft right -of -wad it will likely effect our properties and/or riparian property rights. Please check your drawings and the right-of-way width for correctness. We would like detailed drawings of what is being planned, its location, and potnetial impacts to our properties. Thank you. Hollis L. Batson & Lawrence F. Baldwin (910) 686-4034 137 Stoneybrook Rd, Wilmington, NC 28411 CAMA andE GE AND FILL N? 28152-( G E NR A L �� ;PE I T as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coast I Resources Commission in an area of environmentaLconcer pursuant to 15 NCACApplicant Name . 't Phone Number 10 Address a P City tint Q 4-r- , State zip Pr'ect Location (County, State Road, Water Body, etc.)�� _6A , 54- —F-4' s (� V, I f'\ I . I 1, t t -- This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms ant's sign tune may subject the permittee to a fine, imprisonment or civil action; and 4.:,appl may cause the permit to become null and void. L This permit must be on the project site and accessible to the permit of- pe mit office s signature 15 ficer when the project is inspected for compliance. The applicant certi- 1110i 410( fies by signing this permit that 1) this project is consistent with the local Issuing d to a piration date land use plan and all local ordinances, and 2) a written statement has /1 been obtained from adjacent riparian landowners certifying that they - �J have no objections to the proposed work. 3ttachments In issuing this permit the State of North Carolina certifies that this project ( (� CU �� �C is consistent with the North Carolina Coastal Management Program. application fee STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS GovERvoR July 16, 2001 COUNTY: Carteret (16-01-22) SUBJECT: Encroachment Contract --- Time Warner Cable Bruce Sheldon Construction Supervisor Post Office Box 999 Newport, N.C. 28570 LYNDo TIPPETT SECRET.-',RY Attached hereto, for your files, is a copy of the Right of Way Encroachment Contract which has been properly executed. This contract covers the following: Installation of approximately 3200 linear feet of steel casing for fiber optic cable along SR 1335 and under The Straits via directional bore as shown on attached drawings. APPROVED SUBJECT TO: (1) Notify the District Engineer's Office in New Bern (252) 514-4716 prior to beginning and upon completion of work. (2) Workmanship and materials to conform to D.O.T. standards and specifications. (3) Contact the appropriate Utility Company(ies) involved and make satisfactory arrangements to adjust the utilities in conflict with the proposed work prior to construction. (4) Any pavement or drainage structure disturbed or damaged shall be restored to its original condition as directed by the District Engineer. 1� P.O. Box 1578 Greenville, N.C. 27835 Phone: (252)830-3490 Fax: (252)830-3352 Time Warner Cable — Carteret (16-01-22) Pale 2 (5) Traffic Control Devices shall be in accordance with the Manual on Uniform Traffic Control Devices and amendments or supplements thereto. Proper traffic control devices; signs, etc. shall be installed to insure public safety. (6) Trenching, bore pits, and/or other excavations shall not be left open or unsafe overnight. (7) Fill areas/backfill material to be thoroughly compacted to 95% original density. All trenched material shall be compacted in maximum 6" layers by mechanical tamp or other previously approved method of compaction. Any material removed from the trench/pit that is contaminated or unsuitable for backfill shall be disposed of off DOT right of way. (8) Dress, seed and mulch all disturbed areas. This operation to be performed on a weekly basis. (9) Proper temporary and permanent measures shall be used to control erosion and sedimentation in accordance with all local, State and Federal regulations. (10) When surface areas in excess of one acre will be disturbed, the Encroaching Party shall submit to the District Engineer a Sediment and Erosion Control Plan which has been approved by the appropriate regulatory agency or authority prior to beginning any work on the Right of Way. Failure to provide this information shall be grounds for suspension of operations. (11) It shall be the responsibility of the encroaching party to remove all temporary erosion control measures once a satisfactory vegetative cover has been established. (12) All roadway signs are to be replaced before the end of the same work day. (13) No open cut of pavement will be permitted for this installation, (14) Remain 3 feet minimum or 1 foot distance per 1 foot depth from edge of pavement whichever is greater for shoulder installations. Remain 5 feet minimum from edge of pavement to edge of bore pit. (15) All concrete and asphalt driveways within NCDOT right-of-way shall be crossed by dry bore methods. Any deviation shall be by written permission of the affected property owner and shall be warranted for 5 years to cover all damages resulting from the open cut. 1� P.O. Box 1578 Greenville, N.C. 27835 Phone: (252)830-3490 Fax: (252)830-3352 Time Warner Cable — Carteret (16-01-22) Page 3 (16) Boring operations will be installed by an approved method by the Department as outlined in the manual "Policies and Procedures for Accommodating Utilities on Highway Rights of Way" (January 1, 1975 — Revised April 1, 1993). If these approved methods are not being used, the encroachment will be revoked. Any other boring operation will be approved by the Department on a case by case basis. (17) Strict compliance with the Policies and Procedures for Accommodating Utilities on Highway Rights of Way Manual shall be required. ,(18) In cases where less than minimum bury is necessary or where bores are greater than 6", the fiber optic cable shall be protected with a casing. (19) Splice boxes, pedestals, and other appurtenances shall be located at or beyond the right of way so as not to interfere with maintenance activities. (20) The Department of Transportation does not guarantee the right of way on these roads, nor will it be responsible for any claim for damages brought by any property owner by reason of the installation. (21) Upon completion of the work, the utility owner shall submit an "as built" set of plans to the District Engineer's Office which shall include accurate information as to the horizontal distance to the facility from edge of main travel way and general depth in relation to existing natural ground. (22) No portion of the Right of Way shall be used for parking of equipment during construction. Sincerely, C. E. Lassiter, Jr., P.E. DIVISION ENGINEER CEL, jr: rrf Attachment cc: Mr. J. B. Williamson, Jr., Manager of Right of Way Mr. A. C. Everett, District Engineer Mr. David Livingston, County Maintenance Engineer File U P.O. Box 1578 Greenville, N.C. 27835 Phone: (252)830-3490 Fax: (252)830-3352 ROUTE J;f�.� PROJECT /1-'5ZL f" �/ DEPARTMENT OF TRANSPORTATION -AND- _ �'� C' %��y,�'.✓t'� C �� STATE OF NORTARO�I NA COUNTY OF RIGHT OF WAY ENCROACHMENT AGREEMENT' PRIMARY AND SECONDARY HIGHWAYS THIS AGREEMENT, made and entered into this the /2 day of by and between the Department of Transportation, party of the first part; an �9-- "'� ���/ party of the second part, W I T N E S S E T H: THAT WHEREAS, the party of the second part desires to encroach on the right of way of the publ i roag dey'gn ted as/Route T-F'is'3f' located with the construct io�rl -and/or erection o WHEREAS, it is to the material advantage of the party of the second part to effect this encroachment, and the party of the first part in the exercise of authority conferred upon it by statute, is willing to permit the encroachment within the limits of the right of way as indicated, subject to the conditions of this agreement; NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of the second part the right and privilege to make this encroachment as shown on attached plan sheet (s), specifications and special provisions which are made a part hereof upon the following conditions, to wit: That the installation, operation, and maintenance of the above described facility will be accomplished in ac- cordance with the party of the first part's latest POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS-OF-WAY, and such revisions and amendments there o as may e n e ec a e e o e agreemen n_ orma on as to these policies and procedures may be obtained from the Division Engineer or State Utility the party of the first part. g y Agent of That the said party of the second part binds and obligates himself to install and maintain the encroaching facility in such safe and proper condition that it will not interfere with or endanger travel upon said highway, nor obstruct nor interfere with the proper maintenance thereof, to reimburse the party of the first part for the cost incurred for any repairs or maintenance to its roadways and structures necesaary due to the installation and ex - re require a of the f8cof the party of in the I the second part, and if at any time the party of the first part shall ocathe binds tremoval of or dshimself, hissuccessorsnges and assigns, totion Promptlyhremove ore said calter ethethat saidtfacilities, inoorder tosecond to the said requirement, without any cost to the party of the first part. That the party of the second part agrees to provide during construction and any subsequent maintenance proper signs nigral lights, flagmen and other warning devices for the protection of traffic in conformance with the latest Manuai on Uniform Traffic Control Devices for .streets and Hi hwa a and Amendments or Supplements thereto, Infor- ms on as oLite eve ru es an rogtr aliens May 013talned from the Division Engineer of the party of the first That the party of the second part hereby agrees to indemnify and save harmless the party of the first part from all dnmdges and claims for damage that may arise by reason of the installation and maintenance of this en- croachment. That the party of the second part agrees to restore all areas disturbed during installation and maintenance to the oatisfaction of the Divis;.on Engineer of the party of the first part. The party of the second part <tgreea to exercise every reasonable prec:autfon during constructionand maintenance to prevent eroding of soil; silting or Pollution of rivers, streams, lakes, reservoirs, other water impoundments, ground surfaces or other property- or Pollution of the air. There sha)l be compliancewith applicable rules and regulations of the North C u olina Division of Environmental Management, North Carolina Sedimentation Control Commission, and with ordindnces and regulations of various counties, muni•_ipnlities and other official agencies relating to pollution prevention and control. When any installation or maintenarwe operation disturbs the ground surface and the existing ground cover, the party of the second part agrees to remove and rel,lace the sod or otherwise reestablish the grace cover to meet the satisfaction of the Division Engineer of the party of the first part. That the party of the second pert agrees to the actual cost of any inspection of the work consioered to be necessary by the; Division Engineer of the party of the first pert. That the party of the second part agrees to have available at the construction site, at all times during con- struction, a copy of this agreement showing evidence of approval by the party of the first part. The party of the first part reserves the right to atop all work unless evidence of approval can be chows. Provided the work contained in this agreement is being performed on a completed highway open to traffic; the Party of tale second part agrees to glue written notice to the Division Engineer of tha party of the first part When all work contained herein has been co;..pleted. Unless speclfically rerniente i },. th., p rty ,f tt,a rst art, written notice r,f ccmnlc•t r. _ •_• .• r,,�1 a uysur conatructlon will not be required. Y hat in ase of ith he of the first pahrtcreservesothemrlghtctowatoptalltwork_ untils of ithe-facilityreement biashbeeenrty of broughthintoccompliancetor petty moved from the right of way at no cost to the party of the first part. Tiwt it io uyreeu ;,y Loth o11tiea that this agreemrnt B"'! Lecol" vo;d if netual construction of tied work contumpiateu nerein rs not negun wltnrn one (1) year rrom the aate or authorization by the party oz the rizet part unless written waiver is secured by the party. of ttie second part from the party of the first part. During the performance of thin contract, the second party, for itself, its assignees and successors in interest (hereinafter referred to as the ^contractor"), agree6 as follows: e. Com>].iance with Pc• dations: The contractor shall comply with the Regulations relative to nondlscrimin- a ion in e er�Zq-.,:,sin a r,rogr;,r.s ct t} -.e U. Department of Transportdtion, Title 49, Code of Federal Ruyulatic Part 21, as they may Le amended from time to time, (hereinafter reterred to as the Regula- tions), which are herein incorporated ),y reference and made a part of this contract. FORM R/W 16.1 (Rev. July 1, 1977) cusczi—ActEe on Lite gzuuttus Lir zcce, color, or national origin in the selection and retention of subcon- tractors, including procurements of materials and leases of equipment. The contractor shall not partici- pate either directly or indirectly in the discrimination prohibited by Section 21,5 of the Regulations, including employment practices when the contract covers a progrcm set forth in Appendix B of the Regulations. c. Solicitations for Subcontracts Includin Procurements of Materials and E i menta In all solicitations e er y comps i ive i ung or nego is on ma e y e con roc or or aor o e contract, including procurements of materials or leases of equipment, each Performed under o ettb- supplier shall be notified by the contractor of the contractr'oblgationsounder athis contractoand rthe Regulations relative to nondiscrimination on the grounds of race, color, or national origin. d. Information and Resorts: The rnntractor shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Deva: tment of Transportatirn or the Federal Highway Administration to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to the Department of Transportation, or the Federal Highway Administration as appro;,riate, and shall set forth what efforts it has made to obtain the information. e. Sanctions for Noncom I'ance: Ir the event of the contractor's noncompliance with the nondiscrimination provisions of this contract the Dep>rtment o Transportatitn ;hall impose such contract sanctions as it or the federal Highway Administration may determine to be appropriate, including, but riot limited to, (;) withholding of payments to the contractor under the contract until the contractor complies, and/or (2) cancellation, termination or suspension of the contract, in whole or in part. f. Inc_ orporation of Provisions: The contractor shall include the provisions of paragraphs "a" through "f" In every subcontract, including procurements o materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the Department of Transportation or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that, in the event a contractor becotras involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the conractor may request the Department of Transportation to enter into such litigation to protect the interests of the State, and, in addition, the contractor may request the United States to enter Into such litigation to protect the Interests of the United States. IN WITNESS WHEREOF, each of the parties to this agreement has caused the same to be executed in the day and year first above written. ATTEST OR WITNESS: J DEPARTMENT OF TRA SPORTATION BY: a DIVISION ENGINEER Second Party INSTRUCTIONS When the applicant is a corporation or a municipality, this agreement must have the corporate sea; amd be attested by the corporation secretary or by the empowered city official, unless a waiver or corporate seal and attestation by the secretary or by the empowered City off lclaI Is on fl le In he Raleigh office of the Manager of Right of Way. In the space provided In this agreement for execution, the name of the corporation or municipality shall be typed above the name and title of all persons signing the agreement should be typed directly below their signature. This agreement must be accompanied, In the form of an attachment, by plans or drawings showing the following applicable information: I. All roadways and ramps 2. Right of way Imes and where applicable, the control of access Imes 3. Location of the existing and/or proposed encroachment 4. Length, size and type of encroachment 5. Method of Installation 6. Dimensions showing the distance from the encroachment to edge of pavement, shoulders, structures, etc. 1. Location by highway survey station number. If station number cannot be obtained, location should be shown by dis- distance from some Identifiable point, such as a bridge, road, Intersection, etc. (To assist in preparation of the encroachment plan, the Department's roadway plans may be seen at the various Highway Division Offices, or at the Raleigh office,) 8. Drainage structures or bridges if affected by encroachment (show vertical and horizontal dimensions from encroach- ment to nearest part of structure) 9. Method of attachment to drainage structures or bridges. 10. Manhole design H. On underground ut!lir!�s t dept.': of bury code, ali traveled lanes, shoulders, ditches, sidewalks, etc. 12. Length, size and type of encasement where required. 13. On underground crossings, notation a5 to method of crossing - boring and jacking, open cut, etc. 14. Location of vents GENERAL REQUIREMENTS Any attachment to a bridge or other drainage structure must be approved by the Head of Structure Design In Raleigh prior to submission of encroachment agreement to the Division Engineer. All crossings should be as near as possible normal to the centerline of the highway. Minimum vertical clearances of overhead wires and cables above all roadways must conform to clearances set out In the National Electric Safety Code. Encasements shall extend from ditch line to ditch line In cut sections and 5' beyond toe of slopes In fill sections. All vents should be extended to the right of way line or as otherwise required by the Department. All pipe encasements as to material and strength shall meet the standards and specifications of the Department. Any special provisions or specifications as to the performance of the work or the method of construction that may be required by the Department must be shown on a separate sheet attached to encroachment agreement provided that such Information cannot be shown on plans or drawings. The Department's Division Engineer should be given notice by the applicant prior to actual starting of Installation included in this agreement. SPECIAL PROVISIONS ATTACEMENT 92 Untrenched Coristruction Under no conditions shall jetting or wet boring, with «iter, of utili". pipelines or encasement; under pavements be alloyed. Boring and lacking Smooth wall or spiral %veld steel pipe may by jacked through dr,; bores slightly lamer than the pipe bored progressively ahead of the leading Mdse of the advancing pipe as spoil is mucled by [he auger back through the pipe. As the dr,,,boring oeeracion progresses, each new section of the encasement pipe shall be butt -welded to the section previouslyjacked into place. Encas line to ditch line in cut sections, S beyond the roe oi-slopes in fill sections. and;' behind curb sections. ements shall extend iiom disci ;' Beyond Toe of Fill Slope 'rC r "n c a s em. ens Pipe Center of Ditch Carrier Pipe If voids are encO:.-e-ed or occur 0 [sine Ch, c'nCaSe ^e^[ DI^�. ZMUZ e101eS hall be ins.- foot ce...-rs and the vo1C5 Riled tylth 1:3 p In Ce^ enC JrOI;C aI =-: `� to the r0. ;eCtton Or :he e.n.Caseme^r n;Le at iU or.�n _ C;'^,t pressure to preve.^,C SeElleIt-1lent to the roadwa':. In the _'.'C.^.0 an 0 =t: 1: i! is encour:[er,'d durinv rhe bor:ng a ;a ' CLC Ort'Ca^peg. .^G :il!el ':L'ir p - _ :`� j C :: operation the auszer -`"'I ` , exec h 1. or:la nr is ro be :yi.,, ra`.: a^ the ;s is to ' n; ceme . _-,out at �` be pressure to hll all golds before moving anocher _ - Size Cr—' %va"! 1iCk:i eSs 0" SiT,00[h wail or spina! :el"...- ^:Ca e.,.e:,. ! rot: borl:^.o and jack:.^._ P;pe Sizes (O. D. 16" - n4.. �3. 1S3 NIateria!s. joints, protecti% e coating. Qrou[in-z. wall thickness ofcar ler pipe. welds, and can`todic protection shat( in accor:a^ce :`; ith applicable ir,du;t or go`:er mental codes. as well as t` e specifications or :he Dzpa,, Hent of Transporation. Cas;n2 pipe shall be sea!ed at the ends to prevent and _.ebrls f-om entering Che annular space be^.veen the casln car2 carrier.- The grade ofthe rop o`Me pipe or casing tivithin righ[s ofwav should provide minimum bury as follows: A. Longicudina! installations ........................................ ,. B. Crossings under Roadways ................................... 3' (Below Travel Surface) C. Crossings Under Ditches (Paved & Unpaved)... ? Pipelines ca„yin2 `iammable. corrosive. expansive, energized or unstable r-ansmittants must comply with State. Federal and Codes. It'. no case. shall the depth of bury be less than as indicated a�ove. Directional Bore — Directional methods have not been given statewide approval for use on NCDOT right of way. Under no condition shall jetting alone or wet boring with water of utility pipelines be allowed. A cutter head shall be used on the tip of the drill string. Directional boring using jetting with Bentonite slurry is approved for the creek crossings at a 5' minimum depth below the stream bed and a 5' horizontal clearance from the nearest part of an structure J , wingwall, footing or pipe culvert. CRISER & TROUTMAN Ad CONSULTING ENGINEERS 11mw- 3809 F ELn m u AVENUE, SURT 102 WILMINGTON, NORM CAROLINA 28403 (91 D) 397-2929 FAx (910) 397-2971 COs NMF-- TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA 3ESCRIPTION: DIRECTIONAL BORE CABLE CROSSING El "PUT -IN" POINT - ASSUMED NORTH EXCAVATE APPROXIMATELY 10' X APPROXIMATE 20' X 8' HK C9 8 4+ + 0 9 + + C14 cli C4 ul rC14 - NI t 03 rill tK bP 4f 53 0 o c� 4.45 lb' b, r�icc 0 eq Lr) in to Ln Ln 0 0 if) 0 in CID tn Df�­ll C4 N + + + In + + to to + + + 0) I + + 03 03 04 C*4 eq N c*4 N N r4 cy 4N (4 04 0 ...... . I BLIc R ...... ...... 1335_ 0 00 i)u . LANA ib _ TO NG.. . ......... --------- ... .. . . ..... ... NOTES: PLAN SCALE: 1"=100' CRISER& TROUTMAN CONSULTING ENGINEERS .." 3809 PEACHMEE AvcNuE. Sun 102 WILMINGTON, %RM CAROLINA 28403 (910) 397-2929 FAx (910) 397-2971 FOR PROFILE SEE SHEET 5 1. ALL ELEVATIONS ARE BASED ON NGVD 29 DATUM. 2. NO BOUNDARY SURVEY WAS PERFORMED AT THIS TIME. NORTH IS ASSUMED ON THIS DRAWING. JOB N""E- TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIPTION: DIRECTIONAL BORE CABLE CROSSING r-D-M—M) (M 13 R DRAIN: JOB r"N_d� cm 5010 SHEET: 1 1 ASSUMED NORTH I 4 0 cc qQ Q QQ QQ Q'SQ NQ 0 DQ lip Q. Q. . N*. N. .,. N* N..�. ,y. * co 0} C.4 + �i M } b m C] N �i + 1 IA tet• w m b + i 9 0 + + Ln alo ? t- + + + — — 10 t0 -- .n— m + + 4+ + + N N N N 1 M n N} 0 � t O W t 0 'f' +N N N N 04 N N (V N CRISER & TROUTMAN CONSULTING ENGINEERS 3609 PEACHTREE AVENUE; SUITE 102 WILMINGTON, NOrrtH CAROLINA 28403 (910) 397-2929 FAx (910) 397-2971 ELAN SCALE: 1"=l 00' ,013 MME TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA FOR PROFILE SEE SHEET 6 DESCMFMON: DIRECTIONAL BORE CABLE CROSSING DESIGN: DR8 5 1 Ot DRAW -N JOB NO C1J0 5010 SHEET: 2 ASSUMED NORTH 0 to S 04 O co cb 0 to S 04 SCALE: 1"=100' LICRISER& TROUTMAN KCONSULTING ENGINEERS 3809 PFAWMEE AVENUE; SUfTE 102 lqww=--o WILMINGTON, NORTH CAROLINA 28403 — (910) 397-2929 FAx (910) 397-2971 FOR PROFILE SEE SHEET 7 JOB KWF-- TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIPTION: I DIRECTIONAL BORE CABLE CROSSING ' DESIGN: E r0 -f? -A -W -K-) rJ—CB—NO-) CYC 50-1 �O SHEET. 3 ry C, v ? A:T R\W rV S. R. .. ....... NO. 13-35--.(6-0' PUBLIC AL.) .. .... . ...... .. ................ ------- ---------- ---- .. ......... . ... .... ELAN . ............. ... . .... ......... .... . . . ........... SCALE: 1"=100' LICRISER& TROUTMAN KCONSULTING ENGINEERS 3809 PFAWMEE AVENUE; SUfTE 102 lqww=--o WILMINGTON, NORTH CAROLINA 28403 — (910) 397-2929 FAx (910) 397-2971 FOR PROFILE SEE SHEET 7 JOB KWF-- TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIPTION: I DIRECTIONAL BORE CABLE CROSSING ' DESIGN: E r0 -f? -A -W -K-) rJ—CB—NO-) CYC 50-1 �O SHEET. 3 CRISER & TROUTMAN CONSULTING ENGINEERS 3809 PEAcKmEE A 'NUE; SurrE 102 WILUINGTON, NbRni ',AROUNA 28403 (910) 397-2929 - kx (910) 397-2971 ASSUMED NORTH 8 C9 + + + + C-4 Lo q� "TAKE-OUT- POINT ,4D R\W R. N f6 35-,-(60' ..66 13 BEAU RT Pl. jEa C'.-:lMW-",< f,lA!L:3!')Ai",! ;N FOR PRO PLAN SHEET 8FILE SEE SCALE: 1"=100' JOB MME: TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIPWN: I DIRECTIONAL BORE CABLE CROSSING DESIGN.- -- �_ �RB A01 r—DM—W—N—.-) rJ-0§­Ni� "/5010 SHM7-. 4 4 "Ad � ■■■■■■■■.- ■■■■.- CRISER & TROUTMAN CONSULTING ENGINEERS DENR, Morehead City Regional Office u u MAY 1 11 ZOO' 151-B Hwy. 24, Hestron Plaza II Morehead City, NC 28557 COASTALMMAGEM Attn: Tere Barrett Ref Time Warner Directional Bore Harkers Isle, NC Dear Ms. Barrett, jime Warner Cable wants to install a 5" cable across the sound from the mainland to Har elf rs Island. It will be by directional bore and be located 20 feet deep when it crosses under fige main channel. The put in point will be on the island side, above the high water line and in the ht of way for NC DOT. The take out point is on the mainland side approximately 20 feet from thigh water line. It is not in the marsh grasses at either point. Enclosed are two copies of the application and the check for $100.00. Sincerely, Don Butler, P E QrJv l V A � �t5 5010 P.O. BOX 3727 • 3809 PEACHTREE AVENUE, SUITE 102 • WILMINGTON, N.C. 28406 • (910) 397-2929 • FAX 397-2971 Form DCM-MP-1 APPLICATION, u MAY 14 2001 COASTAL MANAGEMENT (To be completed by all applicants) MOREHEAD b. City, town, community or landmark 1 APPLICANT L��r�<��s /s'/•� ,� a. Landowner: / Name M e W ?FrN or �Nffr�A: NPP/ Address Pd LK '2 q City Al p Gt" State 4/ G Zip2,?s 70 Day Phone �S2-.ZZ3-3i2� Fax b. Authorized Agent: Name Address City Zip Day Phone Fax _ State c. Project name (if any) l //iv e �Jll! P,- - rA U, Crosc�vo(- ltf?t�erc /S /If Nd NOTE: Permit will be issued in Pane of landowmer(i), and/or project Pomo. 2. LOCATION OF PROPOSED PROJECT a. County —CA r ei eT Revised 03195 c. Street address or secondary road number SSS /�3 d. Is proposed work within city limits or planning jurisdiction? Yes _' No e. Name of body of waterest project (e. river, creek, sound, bay) T� / " - 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. N rte-„ / /o,r b. Is the proposed activity maintenance f an existing project, new work, or both? c. Will the project be for public private or commercial use? COM MP0';A l d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. 2 0 �X /O K 8 P /7t1� ✓C (Ac..t/A 7oRt Pa / / Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract .00414 RcYla x b. Size of individual lot(s) tl A c. Approximate elevation of tract above MHW or NWL !T d. Soil type(s) and texture(s) of tract BridIled sloje- e. Vegetation on tract W eed c - A 4h_ L/e . 4lt,% rA c f. Man-made features now on tract Er : de, P_ r rocS1 Aq g. What is the CAMA Lancs Use Plan land classification of the site? (consuir the Coca kwd we p1m.) Conservation Transitional ✓ Developed Community Rural Other h. How is the tract zoned by local government? k/A i. Is the proposed roject consistent with the applicable zoning? Yes No (Attach Loring co-lD i—-rrificate, if apphcable) j. Has a professional archaeological assessment done for the tract? Yes No ^/ A If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes ✓ No 1. Are there wetlands on the site? Zyes —No Coastal (marsh) ✓ Other « If yes, has a delineation been conducted? n/ D (Attach &cwwntation, if available) H w L A ms 6,eo ,4",,) RevWd 03195 MAY 1 2001 COASTAL MANAGEMENT m. Describe existing wastewateatrient facilities. n.. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industriallcommercial effluent, "wash down" and residential discharges.) NR o. Describe existing drinking water supply source. At 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims tide, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an & 112' by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name N C �)a r Address Phone Name ll1 C 2),n/. Address Phone Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. AJ • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public land's, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03/95 MAY 14 2001 s 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. 'Ile project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the �day of Print Names Signature Ursdo*wr or Axthorka Agew Please indicate attachments pertaining to your proposed project. _ DCM MP -2 Excavation and Fill Information — DCM MP -3 Upland Development _ DCM MP4 Structures Information _ DCM MP -5 Bridges and Culverts DCM MP -6 Marina Development NOTE: Please sign and date each attachment In the space provided at the bottom of each form. CRISER & TROUTM[AN CONSULTING ENGINEERS POST OFFICE sox 3727 13809 PEACHTREE AvENUE j WILMINGTON, NC 28406 (990) 3972929 FAX (910) 397-2971 MEMORANDU BATE: 7/10/01 TO: Tere Barrett FROM: Don Butler SUBJECT: Time Warner Cable Crossing-Harkers Island Tere, Enclosed are the certified receipts for the notification at Harkers Island. The fee was submitted earlier. Time Warner has obtained an encroachment agreement from NC DOT and they will forward you a copy. The USA COE has issued their permit. The state property office has this project on the Agenda for August 7. If you need more data, please contact us. cc ,Joe Green June 7, 2001 Lawrence Baldwin Hollis Batson 137 Stoneybrook Rd. Wilmington, NC 28411 Ref, Time Warner Cable Crossing Gentlemen; JUL 11 2001 Time Warner Cable wants to install a fiber optic cable from the mainland side to Harkers Island. It will start in the NC Department of Transportation right-of-way on the mainland side and come up in the NC Department of Transportation right-of-way on the island side and will be buried twenty feet below the bay bottom. We are obtaining all the required permits. The Division of Coastal Management requires that the adjacent property owners :_.__ ...:_._ proposed be notified of the project. We have enclosed a sit �� u.�,...,,�o� ,.����.,.o �.•� location. if you have any objections, a self addressed stamped envelope is included for your reply. Sincerely, Don Butler cc Joe Green Kk CRISER & TROUTMAN CONSULTING ENGINEERS ■ ums - June 18, 2001 Lawrence Baldwin Hollis Batson 137 Stoneybrook Rd, Wilmington, NC 28411 Ref: Time Warner Cable Crossing Gentlemen; We were able to obtain a copy of the property map that you referred to in your letter of June 8, 2001. You are correct in that your property starts about 300 feet south of the end of the bridge. The insertion point of the proposed cable is 208 feet from the end of the bridge which is outside of your property and on the property stated "Now or Formerly N.C.D.O.T. Marsh and Spoils" on your property map. The cable will be bored toward the mainland. The project ends before it gets to your property, therefore your property lines are not shown on the drawing. We have copied a portion of the map of your property and indicated the point on the NC DOT property in which the cable will be installed. If this installation meets with your approval, it would be appreciated if you could drop us a letter to that effect. If you need more data, please contact us. Sincerely, 1�� Don Butler cc Joe Green P.O. BOX 3727 • 3809 PEACHTREE AVENUE, SUITE 102 • WILMINGTON, N.C. 28406 • (910) 397-2929 • FAX 397-2971 "PUT -IN" POINT - EXCAVATE APPROXIMATELY 10' X 20' X 8' 0 0 0 0 + N N + 0 N —,�0' 11 boy -t -�0. - � • 0 — �r� • � `��� �ti-�'� -�- iA O W M co NI co it -r Goo co rn o+i ■ N N N N N N N N BRIDGE ABUTMENT WN PLAN SCALE: 1"=100' APPROXIMATE HWL 0 M 4J 06 0 IbC3 �. 2 �•i _ S R No, 1335 "PUT -IN" POINT BENCHMARK RAILROAD SPIKE !N EDGE OF PAVEMENT ELEV.=12.6o• I\PPROXIM. -I WL 4 2 0 —2 —4 —6 —8 —10 —12 —14 KSTw+Ca: SEE kZA1TE a 1 E w 19.4 la �o,� 9 NOW OR FORMERLY N.C. D.O.T. XARSH & SPOILS PIIS• 73=SU796UO J 2. JANE' r W-7 JOE Py4c 'I947.. C-41 -1 « JUN 0 6 2001 6 CIOP.STAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAVTR`FORM Name of Individual Applying for Permit: Time Warner Cable Address of Property: The Straits between the mainland and Harkers Island I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing, with dimensions was provided with this letter. I have no objections to this proposal. If you have objections to what is being proposed, please write the Division of Coastal Management, Morehead City Regional Office, 151-B Hwy. 24, Hestron Plaza, Morehead City, NC, 28557, or call 252-808-2808. No response is considered the same as no objection if you have been notified by Certified Mail. An self addressed stamped envelop has been enclosed for your reply. Jun -04-01 01:44P Criser & Troutman 910-397-2971 CRISER & TROUTMAN CONSULTING ENGINEERS POST OFFICE Box 3727 13809 PEACHTREE AVENUE I O M1NaTON, NC 28406 (910) 397-2929 FAx (914) 397-2971 Date: 06/04101 To: Tere Barrett From: Don Butler Ref: Time Warner Cable crossing Fax #: 252-247--3330 Tere, 0 Page(s) Follow C&T Project No.: 5010 We called NC DOT and the four names they gave us at the bridge to Harkers are,- Eric re: Eric Flannagan in Henderson, NC Elaine Jones in Kensington, MD Fannie Watson in Cary, NC HTB Assoc in Wilson, NC We have sent certified mai) to them. Also, the NC Property control said they have to have a copy of the CAiMA permit before they issue their approval. I Aug -14-01 01:59P Criser & Troutman 910-397-2971 P.01 CRISER & TROUTMAN CONSULTING ENGINEERS POST OFFICE SOX 3777 13809 PEACHTREE AVENUE I WILMINGTON, NC 28408 (910) 397-2929 FAX (910) 397-2971 Date: 08//14101 To: Tere Barrett From: Don Butler Ref: Time Warner Cable crossing-Bakldwin Fax #: 252-247-3330 Tere, 0 Page(s) Follow C&T Project No.: 5010 Mr. Baldwin sent us a copy of the letter that was sent to Ms. Moffitt, It lodged his formal objection and appeal. What is the next step? A copy was sent to your office. cc Joe Green 252-223-3208 .Jd � K now June 1, 2001 CRISER & TROUTMAN CONSULTING ENGINEERS Mr. Eric Flannigan In 115 Young St. Henderson, NC 27536 JUL 11 2001 Ref: Time Warner Cable Crossing Dear Mr. Flannigan, Time Warner Cable wants to install a fiber optic cable from the mainland side to Harkers Island. It will start in the NC Department of Transportation right-of-way on the mainland side and come up in the NC Department of Transportation right-of-way on the island side and will be buried twenty feet below the bay bottom. We are obtaining all the required permits. The Division of Coastal Management requires that the adjacent property owners be notified of the project. We have enclosed a set of drawings showing the proposed location. If you have any objections, a self addressed stamped envelope is included for your reply. Sincerely, Don Butler cc Joe Green v� 1 I / X11 �C�J f r _ , - r -7L---,: /; P.O. Box 3727 • 3809 PEACHTREE AVENUE, SUITE 102 • WILMINGTON, N.C. 28406 • (91 J) 397-2929 • FAX 397-2971 nog ONISS080 33840 3 108 WNOL032110 NOIL MOM 1L6Z-L6£ (OI6) -J 6Z6Z-L62 (0l6) COYBZ YNnouvo wboN 'NOIJNINIIM ZOI 3.unS '3nN3AV 33iW43V`3d 6082 CS.TSPaTATTnkTr,T x)KTTTrTnizkTnrA ' aagllQu�gw , '� A"a a is i' ASSUMED NORTH "PUT -IN" POINT - EXCAVATE APPROXIMATELY 10' X 20' X S' S S S S S + S �- + + + N N N 03 N N N N0• 11 APPROXIMATE H WL rV yti � 1 16 o to to ino m N to In o 0 In 0 co - I 1 .+j. -+} N N N N N >. n n N N N N N ao ao N N a --- -ex----... N�..,; J' - �. _ -..... ,..-. V. N 00 �o go o 0 0 0 0 0 0 No N0• 11 APPROXIMATE H WL rV yti � 1 16 o to to ino m N to In o 0 In 0 co 0 o rl to o N Imo' ...._,,.—.... .+j. -+} N N N N N >. n n N N N N N ao ao N N a --- -ex----... N�..,; J' - �. _ -..... ,..-. V. N -------- No, 1335 X100 - - - -. - _ ...T� HA ERS - R -_ G --- NOTES: PLAN SCALE: 1"=100' CRISER & TROUTMAN CONSULTING ENGINEERS � H 3809 PEACHTREE AVENUE, SURE 102 �41WIIAIINGTON, WHIII CAROUNA 28403 �(910) 397-2929 FAx (910) 397-2971 FOR PROFILE SEE SHEET 5 1. ALL ELEVATIONS ARE BASED ON NGVD 29 DATUM. 2. NO BOUNDARY SURVEY WAS PERFORMED AT THIS NORTH IS ASSUMED ON THIS DRAWING. JOB N"YE: TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIPTION: DIRECTIONAL BORE CABLE CROSSING nESICH: rE DRB 5 1 01 DRA1�N: J08 N CYC/5010 SHEET: 1 ASSUMED NORTH 00 $ g Ln ± n a+o a o+ + 1 1 _ 1 ,!O qo qo cp °o 1p NO �p t-O,�° ,`o ,yo° r0 O O O Up, 00 N p O O �F b a0 O O O O O O N � r{0 (a b 0 (O O N 01 f++ m M 1� N m O .{O}- M �F N u+i v+i (h Ih m to n ab rn+ rn+ O b N + N N c+� N + Pi L4 66 N N N 0 0 N -_... ,: ., ,-,^-T 1-.11- „-•�.._-_..._ { t. -__ ._._._ til..!. t' �•,. t- ._.�--_-_•_.._._..___._ ..-_.._.___•_...-..__ •_._ ...- .. _... -_ ..._.__.._..__._ .__-_-....,_ -- --__-...._. -. __ _ _ ice: r c 3> r CRISER & TROUTMAN CONSULTING ENGINEERS ,,dJ6, 3909 PEA iTREE AVENUE. SUITE 102 WILMINGTON, NORTH CAROLINA 28403 (910) 397-2929 FAX (910) 397-2971 .PLAN SCALE: 1"=100' JOB MUE TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA FOR PROFILE S' SHEET 6' Qmo o � o m -. DESCRIPTION: DIRECTIONAL BORE CABLE CROSSING DESIGN: PRI3 j O1 O1 DRAJOB NO cmc/ 5010 SHEET - 2 O b + N N c+� N + Pi -_... ,: ., ,-,^-T 1-.11- „-•�.._-_..._ { t. -__ ._._._ til..!. t' �•,. t- ._.�--_-_•_.._._..___._ ..-_.._.___•_...-..__ •_._ ...- .. _... -_ ..._.__.._..__._ .__-_-....,_ -- --__-...._. -. __ _ _ ice: r c 3> r CRISER & TROUTMAN CONSULTING ENGINEERS ,,dJ6, 3909 PEA iTREE AVENUE. SUITE 102 WILMINGTON, NORTH CAROLINA 28403 (910) 397-2929 FAX (910) 397-2971 .PLAN SCALE: 1"=100' JOB MUE TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA FOR PROFILE S' SHEET 6' Qmo o � o m -. DESCRIPTION: DIRECTIONAL BORE CABLE CROSSING DESIGN: PRI3 j O1 O1 DRAJOB NO cmc/ 5010 SHEET - 2 ASSUMED NORTH 0 cc A ev R\W R. N1 -A 0- 133�5 (60'2�0, PUBLIC -4 .... ........ . ..... . . ......... PLAN SCALE: 1"=100' �& CRISER & TPOUTMAN .A.,CONSULTING ENGINEERS nw, 3809 PEAofrREE AVENUE, SUITE 102 qwo"—e WiLUMIGN, mvi CARouto, 28403 Npm �b(910) 397-2929 FAx (910) 397-2971 0 04 FOR PROFILE SEE SHEET 7 JOB f"F- TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIPTION: DIRECTIONAL BORE CABLE CROSSING A rDMGBJN-) LQR 5010 J SHEET: 3 ASSUMED NORTH 1 N K O "TAKE-OUT" POINT e o �. �. �. -.ry .y . . _. _. _. _.. ___T0 BE4UFORT _R\w R• N a 1335 fi0' pl A,..,. CRISER & TROUTMAN CONSULTING ENGINEERS 3809 PEAOHTREE AVENUE, SUriE 102 WILMINGTON, NDRTH CAROLINA' 28403 (910) 397-2929 FAx (910) 397-2971 PLAN ^ ^ LAVI FOR PROFILE SEE SHEET 8 SCALE: 1"=100' JOB NAME TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DMRIMM: DIRECTIONAL BORE CABLE CROSSING -c N O O �D�RB • 5%1E01 DRAIN: JOB CMC 5010 SHEET: 4 APPROXIMATE H WL APPROXIMATE "PUT—IN" POINT GROUND UNE _ _......._ _ _.... _ ....._..... __ t 2 _ :...... a _ 1 .. j _----- -- i... —4 1 � , I -6 .._.. _. ._. _.. �r _ - -12 5' BEN0. - __ _ { —12 —14 —16 j r —18 —20 l 1 I a —22 F ! f r _ -.._--;__ ___ _ __ ...... _ —24 _ 1 y � —26 _.._.__ 28 i-- ... _ _T- —32 . --------- --- i ------------ ._ —40 F...... ;. _ .. —.. .i i+-------------------42 —46 1 ' 7 .._. .. 24+00 25+00 26+00 27+00 28+00 CRISER & TROUTMAN CONSULTING ENGINEERS r•r.���r 3809 PEACTrma AVENUE, SurTE 1 D2 WILMINGTON, WRT11 CAROUNA. 28403 (910) 397-2929 FAx (910) 397-2911 PROFILE HORIZ.: 1"=100' VERTICAL: 1"=10' { _ + ......__ _ _.._ —4 _-�_�._.1... -.. _._ .. ...... ....._.-__..._. ;_.. _..._... ...__.. .__ -6 .._.. _. ._. _.. —10 _ - -12 5' BEN0. - __ _ { —12 —14 —16 j r —18 —20 I a —22 F ! f r _ -.._--;__ ___ _ __ ...... _ —24 _ 1 y � —26 _.._.__ 28 i-- ... _ —30 —32 . 341 ------------ —40 F...... ;. _ .. —.. .i i+-------------------42 —46 29+00 30+00 FOR PLAN SEE SHEET 1 31+00 32+00 JOB W1NE TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIMN: DIRECTIONAL BORE CABLE CROSSING D� oEs1cN: />� DRB 5 f 01 DRAW J08 NO �/ 5010 SHEET: 5 . ................ ...... ..... L ---- ----- - - - ------------- 4 .. .... .... 1. - - - - -- - - -- - ........ .... 4 --------- -- .. ............ ---- ......... . ... ... ....... - ----- . ......... ------- T ---------- - . ... . .... SHEET 2 kz ------------- F ................ ---------- .......... ....... -m;z m . ...... . ... --- - --- ... ...... ....... .... - --------- ... ......... - -------- - 4 -- ------- _j T .......... .. . 15+00 16+00 17+00 18+00 19+00 PROFILE HORIZ.: 1"=100' VERTICAL: 1"=10' CRISER& TROUTMAN CONSULTING ENGINEERS 3809 PEAQITREE AVENUE, SURE 102 W1LMINGTON, NORTHNORTHCAROLINA - 28403 (910), 397-2929 FAx (910) 397-2971 20+00 21+00 22+00 FOR PLAN SEE SHEET 2 kz -m;z m 0--i zOP I ....... .... rlo 4- ...... ..... .... ..... ------ .. .... ...... . ...... . ... - --------- ....... ....... ----- ---- --- T' ---------- + ­ -- -- ----- - - - - - - - - - - - -- ---- ------- - ------ --- ....... -------- --------- ------- ----- .... ......... ... - --------- ------ .... ...... . I . .... - - - - - - - 15+00 16+00 17+00 18+00 19+00 PROFILE HORIZ.: 1"=100' VERTICAL: 1"=10' CRISER& TROUTMAN CONSULTING ENGINEERS 3809 PEAQITREE AVENUE, SURE 102 W1LMINGTON, NORTHNORTHCAROLINA - 28403 (910), 397-2929 FAx (910) 397-2971 20+00 21+00 22+00 FOR PLAN SEE SHEET 2 kz -m;z m 0--i zOP I - rlo JOB MMF-- TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCMPMN: DIRECTIONAL BORE CABLE CROSSING 4+00 dRB m01 _qft No rJ-Mi-N-d� SHEET: 6 L, APPROXIMATE GROUND LINE I i i i v —r .._,.._.__.__.._�........ ..A__.._.. ..._..._...: _.............. .....f_ ...... -------- _... _._..___. i...___....—._...i _...._.__...__. _ ._...__._......1_._._......_ 4— r 7 � , .._ _•. __.... _ i .. .__._ .i_ APPROXIMATE H WL . 7 .... .._,...__. _ 7 �. _• a V.. ....... ......... 1 D0 6+00 7+00 8+00 9+00 10+00 FOR PLAN SEE SHEET 3 CRISER & TROUTMAN ICONSULTING ENGINEERS 3808 PEACHTREE AVENUE, SURE 102 WRNINOTON, NORTH CAROLINA 28403 (9 10) 397-2929 `Ax (910) 397-2971 PROFILE HORIZ.: 1 "=100' VERTICAL: 1"=10' ................_r. ---.____.-- I ---------- ----- — - _._.. y .. _. ....... _ .._.. 11+00 12+00 13+00 y0 5"0 CASING WITH , 3 INNERDUCTS FOR FIBER OPTIC CABLE m ti 0 JOB NIWE TIME WARNER CABLE HARKERS ISLAND, NORTH CAROLINA DESCRIPTION: DIRECTIONAL BORE CABLE CROSSING 15+00 GN: TE: u pRe 5 1 01 r" --N CidC 5010 SHEET: 7 "TAKE—OUT" POINT APPROXIMATE APPROXIMATE HWL GROUND LINE 2 --------- ------ o_. �__ ___. _. _._ _ __ _.__ 2 i —10 r j. _... —16 t _ r —18 —20 '..........r z -22, , _._ _._ ,.- - -- _ ..._ _ - --- _ F_ t - - - r- -, 28 �2 5' END _ .._. --- --- - - - -30 G ' —32 .... ..... .... __ —36 _- ....... - -- - -- ' - - - -- - A f-. i - - �_...._....... ..,- -401..._.._ . ....... ....� —42 , _ —44 _ DATUM FJEV-461- i -- -46.40 0+00 1+00 2+00 3+00 4+00 +00 7+00 PROFILE 8( FOR PLAN 5EEHORIZ.: 1"=100' KDf A SHEET 4 VERTICAL: 1"=10' or - VERTICAL: NAME CRISER & TROUTMAN CONSULTING ENGINEERS 'nip. 3809 PH EE AVENUE, SUITE 102 RIPIION: _r WILMINGTON, P40KTN CAROLINA. 28403 (910) 397-2929 FAx (910) 397-2971 TIME WARNER CABLE m� �o B HARKERS ISLAND, NORTH CAROLINA - °R" _1OB " �/ w SHEEP: DIRECTIONAL BORE CABLE CROSSING g I i( )1' (.c x )1'1:1 t \1 MHNI:1" clitNlat.\I- NIENIORANDUNI Sti'Ite Ot North ('im litm l)(•I)ilrlriwiit OI.ltltiti(v P. (). lips 622 RM-1:1(il 1 2760 2-0629 TO: Eugene Tomlinson, C.'hairman, C'RC Donna Mot'titt, DCVI, Raicigh Charles Jones, DCM, Morehead City Ted Tyndall, DCM, Morehead City Terre Barrett, DCM, Morehead City lZyke Longest, DOJ FROM: David I -lector D� DATE: August 24, 2001 Reply lo: W% ul l i. I lecier I'.m irunmental I)i%i,um 710-(.,).i4 dlx,cierra mad ILI, ,l:uc nr il, I 3 1 2001 RE: Third Party Hearing Request by Lawrence Baldwin and Hollis Batson, Carteret County Lawrence Baldwin and Hollis Batson seeks permission to challenge a LAMA permit issued to Time Warner Cable for a cable crossing near Harker's Island bridge. They allege that the crossing is outside the Department of Transportation's right-of-way and within their zone of riparian access. A copy oftheir hearing request is attached. I need a copy of the permit application, site drawings, CAMA permit, and anything else you believe will be helpful. In addition, I need the Division's comments on their hearing request. Chairman Tomlinson will have to make a decision by September 5. Please provide me with these materials and your comments by August 30 to avoid any conflict with the upcoming holiday. EP50003 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary 22 August 2001 i u 2' Mr. Don Butler A;; * 3 2001 Time —Warner Cable 3809 Peachtree Avenue COASTAL f,riA,1 a -EMENT Mo', '-irA.> Suite 102 Wilmington, NC 28406 CERTIFIED MAIL RETURN RECEIPT REQUESTED Re: Suspension of Work / Appeal of CAMA Permit Decision Dear Mr. Butler: The Chairman of the Coastal Resources Commission, Eugene Tomlinson, has received a request for an administrative hearing to challenge CAMA Permit 28152-C. The Third Party Hearing Request was filed on behalf of petitioner on August 21, 2001. Under N.C.G.S. § 113A-121.1 (the Coastal Area Management Act), your CAMA permit is automatically suspended upon receipt of a hearing request and will remain suspended until either: (1) the Chairman denies the hearing request (under standards set out in the statute); or (2) there is a final Coastal Resources Commission decision on the permit appeal. You may not undertake any development under the permit decision until further notice after Chairman Tomlinson issues his decision. The Division of Coastal Management will prepare a recommendation for the Chairman on whether to grant or deny the hearing request. The Chairman must make a decision within 15 days after receipt of the hearing request, in this case no later than September 5, 2001. If you wish to submit any materials for the Chairman's consideration in ruling on the request for contested case hearing, please send them to me as soon as possible. Sincerely, Donna D. Moffitt cc: Chairman Gene Tomlinson Ryke Longest Jessica Gill Dave Heeter Merrie Jo Alcoke Tere Barrett Ted Tyndall Charles S. Jones 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: hftp://dcm2.enr.state.nc.us An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper St0tc of o rtll (.'arc �litt-I )olI 1'-:t Dc l )�lnlllcf 11 c )I• .jt Islk •c Phonc: (')19) 716-6600 �•;ot'ttvlt\' (A: NIti 1. Fax: (919) 716-6767 LECOP R TRA NASMITTA ;SHEET S ', s FROMr :70. v -;DATE:. v '/ 'NUMBER OF PAGES (INCLUDING TRANSMITTAL SHEET): CONFIRM RECEIPT OF DOCUMENT(S) IF MARKED HERE:io ' 1 JeAJ P 4L- 6 b N:, :y a '•`1 '!fes .1'�'..r !Y: ::�^ii�., ".:.a: p/43596/3 TO'd ZO:OT TO, 6Z 6nd Z9Z9-9TZ-6%:PA �d1N3WNOdIAN3 If COUNTY OF CARTERET CMT 2001-10 OF -IN THE MATTER OF THE THIRD) RECOMMENDATION OF THE PARTY HEARING REQUEST BY DIVISION OF COASTAL MANAGEMENT :LA —NCE Md. DWIN AND ) -Alp - •<. _ - y ;:. STATE OF NORTH CAROLINA BEFORE THE CHAIRMAN p a:.:' •• COASTAL RESOURCES COMMISSION If COUNTY OF CARTERET CMT 2001-10 21.1(b) provides that the determination as to whether a hearing is appropriate should be based upon -IN THE MATTER OF THE THIRD) RECOMMENDATION OF THE PARTY HEARING REQUEST BY DIVISION OF COASTAL MANAGEMENT :LA —NCE Md. DWIN AND ) '1'IOLLIS-BATSON ) x 2. Is directly affected by the decision; and =-N �..' I. BACKGROUND t. 3. Has alleged facts or made legal arguments that demonstrate that the hearing Pursuant to G.S. §113A -121.1(b), Lawrence Baldwin and Hollis Batson have filed a third request is not frivolous. JY; party hearing request with the Coastal Resources Commission. They seek permission to challenge ' ` m : '�the issuance of Coastal Area Management Act General Permit No- 28152-C by the Division of Coastal Management. Permit No. 28152-C was issued to Time Warner Entertainment Company ' - to install an underwater fiber optical cable from the mainland to Harkers Island. �'. Under the Coastal Area Management Act (CAMA), a third party may file a contested case Bearing petition to challenge the issuance of a CAMA permit only if the Coastal Resources ``.Commission (CRC) first determines that a contested case hearing is appropriate. G.S. §I13A- ZO "d 80: OT T0, 6Z 6nd Z9Z9-9TZ-6T6: xPJ 1d1.N3WN0dIAN3 21.1(b) provides that the determination as to whether a hearing is appropriate should be based upon Y==�.a consideration of whether the Petitioner: 1. Has alleged that the decision is contrary to a statute or rule; x 2. Is directly affected by the decision; and =-N 3. Has alleged facts or made legal arguments that demonstrate that the hearing request is not frivolous. JY; ' ` The CRC has delegated the authority to its Chairman to determine whether a third party hearing request should be granted or denied. Rule 15A NCAC 7,1 .0301(b), A third party whose ZO "d 80: OT T0, 6Z 6nd Z9Z9-9TZ-6T6: xPJ 1d1.N3WN0dIAN3 a. kearing - 'iA.dmini dicial quest' 2 request is granted may file a contested case hearing petition with the Office of Hearings. G. S. § 113A -121(b). A third party whose request is denied may seek review. Id. The Division of Coastal Management (DCM) recommends denying the hearing Lawrence Baldwin and Hollis Batson. 11. FACTS " " A. The Petitioners owri a piece of property on Harkers Island with water frontage on the -called Straits between the mainland and .Markers Island. B. The N.C. Department of Transportation (DOT) has a right-of-way for NC Highway ='1335 and the bridgd)to Barkers Island. C. The Petitioners' property abuts the east side of the right-of-way for the highway and - L dge approach. a�`� �:�,,,.''��' • ':a' D. The Petitioners' property comer is located about 300' from the bridge. �ry E. Time Warner Entertainment Company sought a C AMA general permit to install a5 fiber optic cable running under the Straits from the mainland to Harkers Island. (Attachment A is location map showing the crossing site which is hereby incorporated by reference.) F. The cable would be installed by directional boring and would be located some 20 feet ` below the bottom under the main channel. G. The put in point for the cable wguld be located above the high water line and within. the DOT right-of-way about 208 hof theVridge. (Attachment B is a copy of two sheets from the r.... lan showing the put in point which sheets are hereby incorporated by reference.) H. A 10' wide by 20' long by 8' deep pit would be dug on the shoreline befoze boring horizontally under the waterbody to run the cable to Harkers Island. 20'd 60: OT I0. 6Z End Z9z9-9tiZ-6%: Xe �d1N3WN0K_A, N, 3 M is a copy of the Encroachment Agreement between the DOT and Time Warner Entertainment EYU%ri` °M. hich ishereby incorporated by reference.) w J. Time Warner Cable notified the Petitioners of the proposed project. I. The Petitioners objected saying that the put in point for the cable would be on their ' property because DOT's right-of-way is only 60 feet wide, not 100 feet wide, as shown on the plan for the project. (Attachment D is a copy of the Petitioners' objection which is incorporated herein by reference.) 3 a� T. Time Warner Cable obtained an encroachment agreement from the Department of .n z",.. L'''ip: ':.• .. ".., ,I, .'i+�' K. After receiving assurances from the DOT that the project was located within the -. 'transportation dated July 16, 2001, to locate the cable within the highway right-of-way- (Attachment is a copy of the Encroachment Agreement between the DOT and Time Warner Entertainment EYU%ri` °M. hich ishereby incorporated by reference.) w J. Time Warner Cable notified the Petitioners of the proposed project. I. The Petitioners objected saying that the put in point for the cable would be on their ' property because DOT's right-of-way is only 60 feet wide, not 100 feet wide, as shown on the plan for the project. (Attachment D is a copy of the Petitioners' objection which is incorporated herein by reference.) J. They also contended that the cable would interfere with their "riparian and littoral z",.. L'''ip: ':.• .. ".., ,I, .'i+�' K. After receiving assurances from the DOT that the project was located within the -. ;;� ghway right-of-way, the DCM issued CAMA General Permit No. 28152-C to Time Warner on a. Just,,.. :• ; nt E is a co of LAMA General Permit No. 28152-C which is August 1, 2001. (Attachment copy i in reference. .. ;•. ,- incorporated here by ) „Yw�., L. In a letter dated August 6, 2001, Ted Tyndall, DCM's District Manager, Morehead k City, sought to address the Petitioners' objections but mistakenly referred to the encroachment .µ..= agreement as a right-of-way agreement.(Attachment F is a copy of the letter from Ted Tyndall to the Petitioners dated August 6, 2001, which is incorporated herein by reference.) icy y. M. The Petitioners sought to challenge the issuance of CAMA General permit No. 28152-C by attempting to file a third party hearing request With the Coastal Resources Commission August 10, 2001. (Attachment G is a copy of the Petitioners incomplete hearing request which 874 7d b0'd 60,Z9Z9-9TZ-6ti6:Xp3 �HiN3WNOKAN3 SO'd OT:OT TO, 6Z 6nU z9z9_9Tz-6T6:xP3 �U1N3WNO�IAN3 4 incorporated herein by reference.) N. The DCM verbally informed them that their attempted hearing request was c 11 lete and needed to be submitted on the proper form. Mp - O. The Petitioners then filed a hearing request with the Commission on August 21, 2001. Their request was on the correct form but was filed 21 days after the permit decision. (Attachment H iS a copy of the Petitioners' second hearing request which is incorporated herein by reference.) III. DCMIS RECOMMENDATION A. Have The Petitioners Alleged That The Decision Is Contrary To A Statute Or Rule. No. The Petitioners have not cited any statute or rule which was violated by the it 'issuanceof CAMA General Permit No- 28152-C. B. Are The Petitioners Directly Affected By The Permit Decision? Yes. The Petitioners own riparian property adjacent to the put in point for the cable. their property also abuts the highway right-of-way within which the cable will be located. 41, C Have The.PetitionersDemonstrated That Their Hearing Request Is Not Frivolous? No. for the following reasons, the Petitioners have failed to demonstrate that their hearing. -request is not frivolous: '14: 1. The Petitioners contend that their real property rights will be violated because the hi hway right-of-way within which the cable will be located is only 60' wide, not 100' wide as 9 shown on the project plan. The disputed width of the highway right-of-way is a real property issue for resolution by the General Court of Justice, not the Division of Coastal Management or the Coastal Resources Commission. In addition, the Petitioners have raised this allegation SO'd OT:OT TO, 6Z 6nU z9z9_9Tz-6T6:xP3 �U1N3WNO�IAN3 'S5;lVCLw% , s s' #'without any supporting evidence. Finally, the Division of Coastal Management received <:4.assuraz�ces from the DOT in response to the Petitioners' objection that the right-of-way is 100' M:' 2. The Petitioners also contend that their riparian/littoral rights will be violated by - o;;,Ahe underwater cable crossing- As the owners of riparian property, they have a right of access to a navigable water. They also have the same rights as members of the public to operate a boat, ,,gather shellfish, set pound nets, etc., in the waters and bottorn in front of their property. The b' e• Petitioners have made no showing that any of these rights will be affected by a cable entering the ground above the high water line and then running underneath the bottom to Harkers Island. ` 1`` T D. Was The Petitioners' Hearing Request Timely Filed? ' No. The Petitioners' hearing request was not filed with the CRC within 20 days of the _;permit decision, and this alone is sufficient to support a denial of their hearing request. IV. CONCLUSION ; ''. For the reasons given above, the Petitioners' hearing request should be denied. At This the day of August, 2001. FOR THE DIVISION OF COASTAL MANAGEMENT t- David G. Heeter„ Assistant Attorney General N.C. Department of Justice P.O. Box 629 Raleigh, NC 27602-0629 - '?t : (919) 716-6954 90'd TT:OT TO, 6Z 6pd__.. Z9Z9-9IZ-6%:xP� �UINIWNOdIAN3 0 2 CERTIFICATE OF SERVI 1 P50055 T David G. Heeter Assistant Attorney General N.C, Department of Justice P.O. Box 629 Raleigh, NC 27602.0629 (919) 716-6954 ZO'd TT:OT To, 6z 6nu 66-9TZ-6T6:xP3 �UiN3WNOKAN3 This is to certify that I have caused a copy of the foregoing Recommendation Of The "Division of Coastal Management to be served upon the Petitioners by depositing a copy thereof in -the U.S. Postal Service with sufficient postage for delivery by first class mail and addressed to: �j Lawrence F. Baldwin Hollis L. Batson 137 Stoneybrook Rd. Wilmington, NC 28411 This the day of August, 2 00 1. 1 P50055 T David G. Heeter Assistant Attorney General N.C, Department of Justice P.O. Box 629 Raleigh, NC 27602.0629 (919) 716-6954 ZO'd TT:OT To, 6z 6nu 66-9TZ-6T6:xP3 �UiN3WNOKAN3 -13 ' MONITORING & COMPLETION REPORT [CAMA Major Development & State Dredge & Fill Permits] PERMITTEE' S NAME: PERMIT # LOCATION: FIELD REP. PHONE: DATE REPORTEDLY COMPLETE: (� DATE OF INSPECTION 0 1) Do th easured dimensions of the development differ from those indicated in the permit and workplat? YES NO [circle one]. COMMENT: 2) SEDIMENTATI EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all disturbed areas? /NO [circle one] COMMENT: 3) FUTURE MOIWTORINQ & ENFORCEMENT ACTION: Is further investigation or enforcement action needed? YES O [circle one]. COMMENT: SENDER: ■ Complate items 1 and/or 2 for additional services. I also wish to receive the ■Complete items 3, 4a, and 4b. following services (for an ■Print your name and address on the reverse of this form so that we can return this extra fee): card to you. ■Attach this form to the front of the mailpiece, or on the back if space does not 1. ❑ Addressee's Address permit. Write 'Return Receipt Requested' on the mailpiece below the article number. 2. ❑ Restricted Delivery ■The Return Receipt will show to whom the article was delivered and the date delivered. Consult postmaster for fee. 3. Article Addressed to: 4a. Article Number 5. Received By: (Print Name) 18. and Rr Certified Form 3811, December 1994 Domestic Return UNITED STATES POSTAL SERVICE First -Class Mail Postage &Fees Paid USPS R Permit No. G-10 •Print your names rb5s; and ZIP Code in thisbox '50 ER & TROUTMAN Consulting Engineers P. 0. Box 3727 Wilmington, North CBroft 2M t41 fW IDOA/ / &,-t/e K' I I I ) I IjIIiI11iIII I I I 111111 11i t i i I I! I f I i i I I f I f l f I l I l l I i f 1 1 1 f 1 1i i d SENDER: ■Complete items 1 and/or 2 for additional services. rn *Complete items 3, 4a, and 4b. 4) ■ Print your name and address on the reverse of this form so that we can return this I a`r card to you. g -Attach this form to the front of the mailpiece, or on the back it space does not d permit. y ■ Write'Return Receipt Requested" on the mailpiece below the article number. I■The Return Receipt will show to whom the article was delivered and the date C delivered. Article Aaaressea to: 4a. Article Number ry ?E 1�8 /lr`S 6;4- s — 4b. Service Type rvv/< leoAd RI'Registered ❑ Express Mail eturn Receipt 1 Name) 8. Address and fee Mi m. ❑ Certified ❑ Insured Merchandise ❑ COR Z L_,; >� ress (Only if requested c w t, 3811, Detember 1994 Domestic Return I also wish to receive the following services (for an extra fee): 1. ❑ Addressee's Address 2. ❑ Restricted Delivery rn Consult postmaster for fee. d 4a. Article Number ry ?E 1�8 /lr`S 6;4- s — 4b. Service Type rvv/< leoAd RI'Registered ❑ Express Mail eturn Receipt 1 Name) 8. Address and fee Mi m. ❑ Certified ❑ Insured Merchandise ❑ COR Z L_,; >� ress (Only if requested c w t, 3811, Detember 1994 Domestic Return CRISER & TROUTMAN JUN ? 2001 Consulting Engineers P. O. Box 3727 WHmington, North Cen0lin�Ja� T i3vIle r rn D N 0 r o 2p o 1111,11fill 11111111M1111111111,fill 11111MII11411,11111T. SERVICE I F First-class ,._ Mai UNITED STATES POSTAL �v ,. � Postage &Fees Pai Fees P M ? 1 USPS r Permit No. Q-10 . -- .. •Print your nammYe, address, and ZI S box • CRISER & TROUTMAN JUN ? 2001 Consulting Engineers P. O. Box 3727 WHmington, North Cen0lin�Ja� T i3vIle r rn D N 0 r o 2p o 1111,11fill 11111111M1111111111,fill 11111MII11411,11111T. SENDER: ■Complete items 1 and/or 2 for additional services. I also wish to receive the ■Complete items 3, 4a, and 4b. following services (for an ■ Print your name and address on the reverse of this form so that we can return this extra fee): card to you. ■Attach this form to the front of the mailpiece, or on the back if space does not 1. ❑ Addressee's Address permit. ■ Write'Retum Receipt Requested' on the mailpiece below the article number. Q. ❑ Restricted Delivery ■The Return Receipt will show to whom the article was delivered and the date delivered. Consult postmaster for fee. 3. Article Addressed to; 3 gam' t�C�wkLr�r� �� �Hyih�� N 5. Received By: (Print Name) PS Form 3811, b(ecember 1994 4a. Article Number -7000 6)&06 002j dy� re4b. rvlce Type -2.3 1' gistered ❑ Certified ❑ Express Mail ❑ Insured Return Receipt foMerchandise ❑ COD and fee is paid) rn npml First-Class Mail UNITED STATES POSTAL SERVIPermit o. -- ; • Print your name, address, and ZIP`Code in this box • CRISER 8 i'U`ilANo +_ Consulting Engineers, r P. O. Box 3727 Wilmington, North Carolina 28406 s2 Q � dDo 7-4 itlitilt fill itlfill ifliilliilIlifllift ifIII III IIiflilfill IIII -SENDER: �O ■ Complete items 1 and/or 2 for additional services. 5 q ■Complete items 3, 4a, and 4b. ■ Print your name and address on the reverse of this form so that we can return this i 2 card to you. y ■Attach this form to the front of the mailpiece, or on the back if space does not permit. y ■Whte'Return Receipt Requested'on the mailpiece below the article number. +L, ■The Return Receipt will show to whom the article was delivered and the date delivered. I also wish to receive the following services (for an extra fee): 1. ❑ Addressee's Address 2. ❑ Restricted Deliveryi 11 7 /)00 A cn r 4b. Service Type r— ,lollto a: k- le I' ❑ Registered t ( (� ❑ Express Mail 22 �-0 1 l,u r`f l 2—PI5 1 Retum Receipt for mndi i 7. Date of Delivery€ o MI a Addressee's Address (Only if and fee is paid) ""— N X � \I yid 11\ Kms. _,I S PS ForrA M 1, December 1 94 Domestic Return Receipt UNITED STATES POSTAL SERVICE First -Class Mail Postage & Fees Paid USPS Permit No. G-10 r 0 Print you?, name, address, and ZIP Code in this box-• CRISER & TROUTMAN Consulting Engineers P. 0. Box 3727 W"ngton, North CaM ina 28400 A+PA . L%w 81 f/e r— y �^'�'%...=•`..•: �'�...� ��., 7 �ft�}1�lIIt1i11��lititi1Fi 11411I1f}Ilfll�lf!?tff�lif lli�t �tt F� d SENDER: ■Complete items 1 andlor 2 for additional services. N ■Complete items 3, 4a, and 4b. I d ■ Print your name and address on the reverse of this form so that we can return this f 2 card to you. ? a Attach this form to the front of the mailpiece, or on the back if space does not ` permit. d ■Mte'Return Receipt Requested' on the mailpiece below the article number. M ■The Return Receipt will show to whom the article was delivered and the date O delivered. O a 3. Article Addressed to: 4a. Article N 4 CSO ti E 4b. Service: 0 M I also wish to receive the ❑ Registered following services (for an El Express Return Recti extra fee): Dat f 1. ID Addressee's Address v+ �y 2. ❑ Restricted Delivery N; Consult postmaster for fee. c amber Oy jLf y�l m', r; &C,,C 0C_0kC/— C E v 1 t �e u} `�/ �I ❑ Registered tNn / W pc ti\� v�S 1 YtC�1 " 1� El Express Return Recti a J Dat f Za 0 S-19 S cc cc 5. Re Iv d By: (Print Nam W J7a I e- -k!S S. Addressae1- and fee i � 1 car: 1 es 6. Sign re: Addresser gent) X H j PS Form 3811, DecemVr 1994 L-4 L for MM iry f" address �) o mil Certified Insured COD �.1 jested ) �1 ail UNITED STATES POSTAL SERVICE First-class i Postage &Feeees Paid USPS Permit No. G-10 • Print your name., a dr sandIn this box • OF JUN ? ' X001 CRISER & TROUTI Consulting Engineers P. O. Box 3727 Wilmington, North Carona 2114_06 p f4 41t 1 >M i3 f i'er - f,� ? iliillt Fiiiilit�77t1}Fl1i}i�!liliiflf fl'. [iit[1ff1liFl tf �f �lff� d SENDER: o ■ Complete items 1 and/or 2 for additional services. rn ■Complete items 3,4a, and 4b. H ■ Print your name and address on the reverse of this form so that we can return this + card to you. ■Attach this form to the front of the mailpiece, or on the back if space does not m permit. y ■ Write'Return Receipt Requested' on the mailpiece below the article number. y ■ The Return Receipt will show to whom the article was delivered and the date C delivered. to m 3. Article Addressed to: 4a. Article N E 4b. Service' R I also wish to receive the following services (for an C1 Registered extra fee): Z) 0 s-- f �� �r� ST ❑Express Mail 1. ❑ Addressee's Address o 2. ❑ Restricted Delivery Retum Receipt fr Consult postmaster for fee. PS Form 3811, DeBember 1964 Do ami A SSOc �`FrT�� C1 Registered rn w Z) 0 s-- f �� �r� ST ❑Express Mail C a7. o �� a77 �� Retum Receipt fr f e' e Z X 5. Received By: (Print Name) 8. Addressee's Ac ¢ 6 (Vl r'Li,, -1 5 i rL2SO and fee is paid) I 6. Signa re: (Addy see rAgent PS Form 3811, DeBember 1964 Do ami d' Qy L❑ I y, digs ❑ _o' o ilyif req N � ro ..d �pUyT UNITED STATES POSTAL 5RVI(E y� Y i� CJ C v d c m, 0 Prir3")b61i4, address, and ZIP Code in this box • y cR}sM & TROtMAt&v��'°� C Consulting Engineers �1n P. 0. Box 3727 � WilminglM, North Carolina 2006 C Mail Fees Paid G-10 i l: I -------------- ------- ------ b+dlZ'alelS %G!O �Cl > 110 VT dtQ11 cc� c7 'ONxogOdJor�C'C. ----- - - - _ N 7dy 'Jaa�JS O C• al. q paJa/dwo� aq o7J (�l�Pa/^� Juud asea!dl au�e!y-saner a p Ir saej +g a6e;sod Mal M w�N G ED �f. (pannbaa luawasJopu3) Q ead �,ani,ad paloulsea O O Q r� (Pannba ti luawas'opu3) ru `+hiew dC Z aej id!ao% uwnlay .0 < C*A ©h V aad pa!;!uao M yls v�Ln C S a6elsod Ln ti ru --------------------------- �- _-------- ----- 1- - - oN xo8 Od do: 'ON •Jdy yaajJS ( L l O PaJa!duioo (A!Jea!3 luud asea!d) awe!y s,lua/dlaea d [— $ saaj 9 a6elsod;e3o1 J� G' m O (pannbaa luawas�opu3) gad /uani!aa paloulsay m % ajaH / aed !ld aoea u naaa Pu3) � aa3 pagiUap ll m $ 96elsod Ln �/� w M $ 76 El O Certified Fee iT' Return Receipt Fee ru rL (Endorsement Required) = u"I Postage $ ) G }� � O Certified Fee �l v r(91., i ����11" • 7 Postma � tti Return Receipt Fee (Endorsement Required) • / ` _ t *g�5j O q Restricted Delivery Fee (Endorsement Required) O O Total Postage & Fees fz X31 ,$ O RecipieP Name Please Print CI rly) (to be completed by mailer) ------------t-.-I --------- - ---- L ox---------------- Street, Apt. No.------------------------------- Box No. ; or 0--Box-No. _ --------:�------- City, ---•------------ -------------- --- ----cc State, Z1P+4 , _ 0 t.n ru In Postage $ 7� tir M Certified Fee U— Return Receipt Fee [ (�1 rU (Endorsement Required)C3 Restricted Delivery Feea o ,, .4 v»� C3 Total Postage & Fees $ 3•y� E3 Recipient's Name (Please Print Clearly) (to be ompleted by mailer) it� Stree f r. No.; or PO -Box No M l`I GSI�j e 1,4 c C] -- ---------------------------------- ------ -------- N Crry, Siate, Z1P,+4 AI(! l/�„T_ 77 Form :00 February 2000 See Reverse for Instructions Er rU .7' ti u1 Postage $ 76 El O Certified Fee iT' Return Receipt Fee rL (Endorsement Required) = 0 Restricted Delivery Fee 1 (Endorsement Required) O Total Postage &Fees .+ —3 USP C3 Recipients Name (Please Print Clearly) (to be completed by mai d C2nfs-------------------------- Street, Apt. No.; oro Box No. ----------- ------ City State, ZIP+4 /-----------------