Loading...
HomeMy WebLinkAbout57909_NC DOT_20110708❑CAMA / ❑ DREDGE & FILL GENERAL PERMIT Previous permit# ❑New El Modification ❑Complete Reissue []Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name_ Address City Phone # ( )_ Authorized Agent Affected ❑ CW AEC(s): ❑ OEA ❑ PWS: ORW: yes / no _ State ZIP Fax # ( ) ❑ EW ❑ PTA ❑ ES ❑ PTS ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ FC: PNA yes / no Crit.Hab. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # ( ) River Basin ' Adj. Wtr. Body nat /man /unkn Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) (Scale: ) i Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubicyards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other I - - i — t < P Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions 4 ❑ See note on back regarding River Basin rules. Agent or Applicant Printed Name PermitOfficer's Signature Signature ** Please read compliance statement on back of permit ** Issuing Date ApplicationFee(s) Check# Local PlanningJurisdiction Expiration Date Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 AL'A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Governor July 11, 2011 NCDOT c/o Clay Willis 113 Airport Dr., Suite 100 Edenton, N.C. 27932 Dear Mr. Willis James H. Gregson Director Dee Freeman Secretary Attached is General Permit #57909C to construct two 50' X 24" culverts to replace the existing two 50' X 24" culverts on SR 1208, Kitty Hawk, North Carolina. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, Stephen Lane Coastal Management Representative rcb Enclosures 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www,nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer NorthCarolina ;Vaturallty STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR July 7, 2011 Stephen Lane NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 Dear Mr. Lane, EUGENE A. CONTI, JR. SECRI 'ARY This letter is requesting a general permit .2300 be issued for a pipe replacement on SR 1208 Kitty Hawk Rd, 90' east of SR 1210 (Bob Perry Rd), in Kitty Hawk, Dare County. The current pipes are failing and need to be replaced to ensure safe public travel. The existing pipes (2 @ 50' x 24" CMP) will be replaced with the proposed pipes (2 @ 50' x 24" CAP). The road shoulder at the inlet and outlet of the pipe will be stabilized with rip -rap. The Division of Coastal Management considers the project area to be within an AEC that requires authorization for the pipe replacement. Included with this request are the MP-1, MP- 2, MP-5 forms, location map, landowner notices, and permit drawings depicting the proposed work. The WBS element # is 1.202811. If any additional information is needed please contact Clay Willis at 252-482- 7977. Sincerely, Jerry Jennings, P.E. Division Engineer, Division One Clay Willis Environmental Officer, Division One 113 Airport Drive, Suite 100, Edenton, NC 27932, Phone (252)-482-7977, Fax (252)-482-8722 Dare County SR 1208 Kitty Hawk Rd pipe replacement, 90' east of SR 1210 r I N r Y t ;Fa t+ n lc._ t 't •`}°. L 'fit '� C L LIV �. .. I a t � t -,F I y� t r,� � •T ,t �° I �. � i t t ( + tit � o .c •• ! 1 � n !r I t Pipe * .s iCi 1 /+ 75.72200 1 i bAWN �1.s1 n ttti: at �2 f•R'r � f , T 4� �� t we {. Y �p�l r Y` �t t. Yx,�7 � �• � 21pgj . ' .. ..' land nq r # 1 ����" • .�. t a 1f I l � y °.� 1 }�/'� i ,_ t r �, t + �Rlic ti. • b. .17F, F A. j I w ! ShAlbe,ly - - Point j '� I � � • t $ ei 1 y:.', ` tsIdIld a Lori Pdint,: ! . USGS Quad - Kitty Hawk N Pasquotank River Basin 0 0.15 0.3 0.6 Miles W E iltlil,tl S W. KITTY IL4 WK RD. (SR 1208) DARE CO UNTY PIPE REPLACEMENT TIM BEA CREM 4136 IVY LANE KIM HAWK = 27949 V DB 1498 P 224 AU �: 'e" "Fy CANAL � � \ tt A" A EXISTING PIPE 2@24"X W CMP , cm PR POSED 2C 24" X 50- CAA TO BE REMOVED 4 0 W. Kl= HAWK 1W. (SR 1208) TO SR 1207 TO SR 1211 ------. PWSZ&V EARM SLOAff AS MQUMD ra0poSM MP Foit WorWER STAMIZAnON 7S7. -?aaOq CANAL r Y.35.069792 RULUM S. FLETCHER 64 SPINDRIFT TRAIL K= HAWK, NC 27949 DB 1603 P 374 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ......... . . ........ . ................ .. .. .. ...................... COUNTY- DARE COUNTY QUAD., KITTY HAWK BASIN. PASQUOTANK PROJECT: PIPE REPLACEMENT SCALE I"= 30' DRAWN: JGC DATE 6-09-2011 ...... ............... ...... . .. .... . ...... ..................... W. ITT' HAWK RD. (SR 1208) CL SR 1208 ELEV. 100.66 PROPOSED RIP RAP PROPOSED RIP RAP AT END OF PIPE,"�' AT END OF PIPE 96.2 99.3 - --------- 100.1 98.8 / PROPOSED2@24" X50'CAA -'-INV ELEV 96.3 EXISTING PlPg"2@24'X5(Y CMP TO BE REMOVED DETAIL SECTION CROSS SECTION NOTE: CLASS B STONE TO BE PLACED AROUND END OF PIPES NOTE: 130-170M OF NEW PIPE TO BE PLACED 6" TO VBELOW SILT LINE EXISTING PIPE PROPOSED PIPE NC DEPARTMENT OF TRANSPORTATION SR 1208 CL ROAD ELEV. 100.66 - - - - - - - - - DIVISION OF HIGHWAYS NEW, 9AA COUNTY; DARE COUNTY ...... . ... ti3tkiEM BEDEXISTING 2@ 24- X50 Z EXISTING PIPE 2@24'X50'CMP PROPOSED RIP RAPP NV ELEV 96.3'CAA QUAD,' KITTY HAWK TO BE REMOVED AT END OF PIPE BASIN - PASQUOTANK PROJECT -,PIPE REPLACEMENT SCALE.- 1" = 10' LINE AA DETAIL END SECTION VErW DRAWN- JGC DATE- 6-09-2011 NICE MP-1 APPLICATION for Major Development Permit (last revised 12/2T06) North Carolina DIVISION OF COASTAL.. MANAGEMENT 1. Primary Applicant/ Landowner Information ----- .__..................... Business Name N.C. Department Of Transportation Project Name (if applicable) SR 1208 Kitty Hawk Rd Pipe Replacement Applicant 1: First Name Clay MI _ Last Name Willis Applicant 2: First Name MI Last Name if additional applicants, please attach an additional pages) with names listed. Mailing Address 113 Airport Road, Suite 100 PO Box City Edenton State NC ZIP 27932 Country Phone No. 252 - 482 - 7977 ext. FAX No. 252 -482 - 8722 Street Address (if different from above) City State ZIP Emai! 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP I 6 Phone No. 1 ext. Phone No. 2 ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Dare SR 1208 Kitty Hawk Rd, 90' east of SR 1210 (Bob Perry Rd) SR 1208 Subdivision Name City State Zip Kitty Hawk NC 27949 - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank UT to Kitty Hawk Bay c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ®Unknown Albemarle Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. n/a 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 72' 4320 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 2 ❑NHW or ®NWL e. Vegetation on tract - Various roadside grasses on a maintained shoulder, sawgrass, & cattail. f. Man-made features and uses now on tract SR 1208 g. Identify and describe the existing land uses adiacent to the proposed project site. Residential and coastal marsh. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. Yes ®No ❑NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a Yes MNo NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? ®Yes ONo (it) Are there coastal wetlands on the site? [Dyes ❑No (iii) If yes to either (i) or (it) above, has a delineation been conducted? Dyes ®No (Attach documentation, if available) .� >.-s{f3ia-�'3 I I -8P3-�'�11CisA 'e''"". 4 s: Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities. None I o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial I$iPubliclGovernment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of this project is to replace the existing pipes that are structuarlly failing on SR 1208. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Methods of construction will be concurrent with NCDOT Best Management Practices for the replacement of pipes. A tracked excavator, backhoe, and dump truck will be used during construction. d. List all development activities you propose. Replace the the existing pipe 2 @ 50' x 24" Corrugated Metal Pipe with 2 @ 50' x 24" Corrugated Aluminum Pipe with riprap on both ends. e. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance f. What is the approximate total disturbed land area resulting from the proposed project? 450 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Surface runoff from SR 1208. I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA - — -- j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information M In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. E A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Tim Beachem Phone No. Address 4136 Ivy Lane Kitty Hawk, NC 27949 i Name William S. Fletcher Phone No. Address 64 Spindrift Trail Kitty Hawk, NC 27949 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j, A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. l 7. Certification and Permission to Enter on Land 1 I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name _Clay Willis, Environmental Officer Signature Please indicate application attachments pertaining to your proposed project. Form DCM MP-1 (Page 5 of 5) APPLICATION for ®DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development E]DCM MP-4 Structures Information Major Development Permit Form QCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL stabilization Length Width � Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATE© MATERIAL ❑ This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (0) If no, attach a letter granting permission from the owner. (0) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes []No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. () yes, If es, how much water area is affected? ❑CW ❑SAV ❑SB OWL ❑None (5) Describe the purpose of disposal in these areas: 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ❑Bulkhead ®Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: 3' e. Type of stabilization material: riprap g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap 48 Breakwater/Sill Other I. Source of fill material. b. Length: 16' Width: 3' d. Maximum distance waterward of NHW or NWL: 3' f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. riprap 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) s. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (5AV), sneii bottom (bb), or n Amount of material to be laced in the water other wetlands (WL)? If any boxes are checked, provide the (1i) P number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill OWL []None (ii) Describe the purpose of the fill in these areas: 5. GENERAL _ a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Using NCDOT Best Management Practices for soil and erosion tracked excavator, backhoe, dumptruck control. ----- c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project []Yes ®No ❑NA site? []Yes ®No []NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Clay Willis, Division Environmental Officer Date n Applicant Name 1 SR 1208 Kitty Hawk Rd pipe replacement Applicant Signature Project Name FOrM DCM MP-5 BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 9 BRIDGES ®This section not applicable a. Is the proposed bridge: b. Water body to be crossed by bridge: []Commercial ❑Pubiic/Government ❑Private/Community c. Type of bridge (construction material): e. (i) Will proposed bridge replace an existing bridge? ❑Yes ONO If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) 9. Length of proposed bridge: i. Will the proposed bridge affect existing water flow? ❑Yes ❑No If yes, explain: k. Navigation clearance underneath proposed bridge: d. Water depth at the proposed crossing at NLW or NWL: f. (i) Will proposed bridge replace an existing culvert? []Yes ❑No If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) h. Width of proposed bridge: j. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? ❑Yes []No If yes, explain: 1. Have you contacted the U.S. Coast Guard concerning their approval? ❑Yes ❑No If yes, explain: m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: waters? ❑Yes ❑No If yes, explain: 2. CULVERTS a. Number of culverts proposed: c. Type of culvert (construction material): 2 - 50' x 24" Corrugated Aluminum Pipe ❑This section not applicable Water body in which the culvert is to be placed: Unnamed tributary to Kitty Hawk Bay. < Form continues on back> d. (i) Will proposed culvert replace an existing bridge? If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f• Length of proposed culvert: 50' h. Height of the top of the proposed culvert above the NHW or NWL. 0' j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ❑Yes ®No If yes, explain: e. (i) Will proposed culvert replace an existing culvert? ®Yes ❑No If yes, (ii) Length of existing culvert(s): 50' (iii) Width of existing culvert(s): 24" (iv) Height of the top of the existing culvert above the NHW or NWL: 0' (v) Will all, or a part of, the existing culvert be removed? (Explain) All 9• Width of proposed culvert: 2 a 24' i. Depth of culvert to be buried below existing bottom contour. 1' k. Will the proposed culvert affect existing water flow? ❑Yes ®No If yes, explain: 13. EXCAVATION and FILL El This section not applicable I a. (i) Will the placement of the proposed bridge or culvert require any b. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ®Yes ❑No excavation within coastal wetlands/marsh (CW), submerged If yes, aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square (ii) Avg, length of area to be excavated: 50' feet affected. (iii) Avg. width of area to be excavated: 6' ❑CW ❑SAV ❑SB (iv) Avg. depth of area to be excavated: 2' OWL ®None (v) Amount of material to be excavated in cubic yards: 22.22 (ii) Describe the purpose of the excavation in these areas: c. (i) Will the placement of the proposed bridge or culvert require any high -ground excavation? ®Yes ❑No If yes, (ii) Avg. length of area to be excavated: 45' (iii) Avg. width of area to be excavated: 6' (iv) Avg. depth of area to be excavated: 2' (v) Amount of material to be excavated in cubic yards: 20 I +'.><+d>-.�,�@3 .z d Y°kis `b H?<-F• x i :8.""€ at �.,�g� Yz§�>§a'2'. r84?d •"? 'it:-.. ? : �.§�,;., d. If the placement of the bridge or culvert involves any excavation, please complete the following: (I) Location of the spoil disposal area: NCDOT approved waste area site. (ii) Dimensions of the spoil disposal area: N/A (iii) Do you claim title to the disposal area? ®Yes ❑No (if no, attach a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ®Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SS ®None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes ®No If yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ®Yes []No If yes, (ii) Avg. length of area to be filled: 12 (iii) Avg. width of area to be filled: 2=3' (iv) Purpose of fill: Bank stabiliztion. g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes ®No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: 4. GENERAL (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW _ ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? []Yes ®No detour structures? ❑Yes ®No If yes, explain: If yes, explain: If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. < Form continues on backs c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion ❑Yes ®No controlled? If yes, complete Form DCM-MP-2. Using NCDOT best management practices for sediment and erosion control. e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? tracked excavator, dumptruck, backhoe g, • Will the placement of the proposed bridge or culvert require any shoreline stabilization? ®Yes ❑No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. 1 Date SR 1208 Kitty Hawk Rd Pipe Replacment Project Name Clay Willis, Environmental Officer plicant Name p L�Z? p plicant Signature f. Will wetlands be crossed in transporting equipment to project site? []Yes ®No If yes, explain steps that will be taken to avoid or minimize environmental impacts. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERt_Y EAVES PERDUE GOVERNOR June 20, 2011 Tim Beachem 4136 Ivy Lane Kitty Hawk, NC 27949 To Whom It May Concern: EUGENE A. CON11, J R. SECRETARY CERTIFIED MAIL The NC Department of Transportation is proposing to replace 2 metal pipes on SR 1208 Kitty Hawk Rd. The site is located approximately 90' east of the intersection of SR 1210 (Bob Perry Rd). The existing pipes are 2 tr 50' x 24" and the proposed pipes are 50' x 24" with the inlet and outlet ends of the pipe stabilized with riprap. All work will be conducted within NCDOT right-of-way. The Division of Coastal Management (DCM) considers the adjacent waters to be estuarine waters under their regulations. Therefore, it is provided protection under state law. For this reason the NCDOT will apply for a permit from the DCM to perform the described work. Part of the permit process is notifying the adjacent landowners of the proposed work. A map depicting the project area, along with a design plat is included with this letter. If you have any questions concerning the proposed work you can contact Clay Willis at 252-482-7977. 113 Aiij)ort Drive, Suite 100, Edenton, NC 27932, Phone (252)-482.7977, Fax (252)-482-8722 The attached form is submitted to insure that you have an opportunity to comment on the proposal. The work is depicted on the attached drawings. If you have no objects to the proposal, please return the form with your response within ten (10) days to this office. tf you do have objections to the project, please forward your comments to: Stephen Lane NC Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 No response within ten (10) days will be construed to mean you have no objections. Thank you for your cooperation. Sincerely, Jerry Jennings, P.E. Division Engineer, Division One Clay Willis Environmental Officer, Division One ADJACENT RIPARIAN LANDOWNER STATEMENT (Dare County: SR 1208, 90' east of SR 1210) 1, __—, am an adjacent riparian property owner and am aware of the North Carolina Department of Transportation's plans for the pipe replacement on SR 1208. I am further aware that this work will occur in an AEC and therefore will require authorization from the Division of Coastal Management in accordance with the Coastal Area Management Act (LAMA). I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. are attached I have objections to the project as presently proposed and my comments Signature of Adjacent Landowner Date: STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR June 20, 2011 William S. Fletcher 64 Spindrift Trail Kitty Hawk, NC 27949 To Whom It May Concern: EUGEnE A. CONTI, JR. SICREI'ARY CERTIFIED MAIL The NC Department of Transportation is proposing to replace 2 metal pipes on SR 1208 Kitty Hawk Rd. The site is located approximately 90' east of the intersection of SR1210 (Bob Pery Rd). The existing pipes are 2 @ 50' x 24" and the proposed pipes are 50' x 24" with the inlet and outlet ends of the pipe stabilized with riprap. All work will be conducted within NCDOT right-of-way. The Division of Coastal Management (DCM) considers the adjacent waters to be estuarine waters under their regulations. Therefore, it is provided protection under state law. For this reason the NCDOT will apply for a permit from the DCM to perform the described work. Part of the permit process is notifying the adjacent landowners of the proposed work. A map depicting the project area, along with a design plat is included with this letter. If you have any questions concerning the proposed work you can contact Clay Willis at 252-482-7977. 113 Airport Drive, Suite 100, Edenton, NC 27932, Phone (252)-482-7977, Fax (252)-482-8722 The attached form is submitted to insure that you have an opportunity to comment on the proposal. The work is depicted on the attached drawings. If you have no objects to the proposal, please return the form with your response within ten (10) days to this office. If you do have objections to the project, please forward your comments to: Stephen Lane NC Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 No response within ten (10) days will be construed to mean you have no objections. Thank you for your cooperation. Sincerely, Jerry Jennings, P.E. Division Engineer, Division One Clay Willis Environmental Officer, Division One ADJACENT RIPARIAN LANDOWNER STATEMENT (Dare County: SR 1208, 90' cast of SR 1210) 11 _ _ , am an adjacent riparian property owner and am aware of the North Carolina Department of Transportation's plans for the pipe replacement on SR 1208. 1 am further aware that this work will occur in an AEC and therefore will require authorization from the Division of Coastal Management in accordance with the Coastal Area Management Act (CAMA). I have no objection to the project as presently proposed and hereby waive that right of objection asyrovided in General Statute 1.1.3-229. are attached. I have objections to the project as presently proposed and my comments Signature of Adjacent Landowner Date: I Complete Items 1, 2, and 3. Also complete item 4 if Restricted Delivery Is desired. I Print your name and address on the reverse so that we can return the card to you. Attach this card to the back of the mailpiece, or on the front if space permits. Article Addressed to: Tim Seachem 4136 Ivy Lane Kitty Hawk, NC 27949 A. Si ature ,! ❑ Agent B. Veceived by rirrfed N e) C. Date of Dellyery D. Is delivery address different from item 1? Yes If YES, enter delivery address below: ❑ No 3. Service Type 0 certified Mail ❑ Express Mail C3 Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes Article Number 7009 2820 0003 3738 3838 (TFansfor from service label) IS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 ■ Complete items 1, 2, and 3. Also complete Item 4 if Restricted Delivery Is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. t. Article Addressed to William S. Fletcher 64 Spindrift Trail Kitty Hawk, NC 27949 A. 0 Agent B. Received by Na j tC. Date ofbelivery D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise 11 Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes Article Number (Transfer from service fat 7009 2823 0003 3738 3821 IS Form 3811, February 2004 Domestic Return Receipt P 702595-02-M-15i' tti i0 rn � ra m $ 1 r- Hostage I m cartified Fee M Q Retum Recek)t Fee i ? Pastinask Here C3 {Endorsement Rsqul(06) ^ r-3 itvstrlttt+d Daltvtm[ Fee (Endorsemard Required) Q CO T(A.,, 0-1- P. V-. 3 ry William S. Fletcher Er 64 Spindrift Trail ---------- C3 Kitty Hawk, NC 27949 Gi: .......... ADJACENT RIPARIAN LANDOWNER STATEMENT (Dare County: SR 1208, 90' east of SR 1210) I, �1 LUA*rf) S . I—(e e 6b<. am an adjacent riparian property owner and am aware of the North Carolina Department of Transportation's plans for the pipe replacement on SR 1208. 1 am further aware that this work will occur in an AEC and therefore will require authorization from the Division of Coastal Management in accordance with the Coastal Area Management Act (CAMA). I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. are attached. I have objections to the project as presently proposed and my comments Signature oPAdj7ent Landowner Date: — Zg — RECEIVED t` 'JUL 6 6 2011 ACM -MHO Cffy ADJACENT RIPARIAN LANDOWNER STATEMENT (Dare County: SR 1208, 90' east of SR 1210) 19 % tr' ��Cl l , am an adjacent riparian property owner and am aware of the North Carolina Department of Transportation's plans for the pipe replacement on SR 1208. I am further aware that this work will occur in an AEC and therefore will require authorization from the Division of Coastal Management in accordance with the Coastal Area Management Act (CAMA). I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and my comments are attached. Signature of Adjacent Landowner Date: G �-q D I RECEIVED r JUN 3 0 2011 DCM-MHD CITY Applicant: Date: -7- ll Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. ' Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or ternimpacts (Anticipated final(Applied FINAL Sq. Ft.[any disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet for. Disturbance total includes anticipated restoration or ternimpacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Dredge ❑ Fill (Both ❑ Other ❑ 1 , Dredge ❑ Fill N� Both ❑ Other ❑ Dredge ❑ Fill ❑ Both [9"'Olher ❑ 't Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ . Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ __?2a02?13 .. .. '11 COA'S ".I mcl :.,.ayt_M..,4f I1�