Loading...
HomeMy WebLinkAbout60234_CITY OF NEW BERN_20120521. r.DAMA / `DREDGE &FILL No. 60234 GENERAL PERMIT Previous permit # ❑New ❑Modification _Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name Project Location: County Address Street Address/ State Road/ Lot #(s) City State ZIP Phone # ()_ Fax # O Subdivision Authorized Agent City ZIP Affected ❑ CW r-] EW _PTA ❑ ES F PTS Phone # ( ) River Basin AEC s : ElOEA i HHF _i IH — UBA ❑ N/A O Ad'. Wtr. Bod - (nat /man /unkn I y _7 ❑ PWS: FC: ORW: yes / no PNA yes / no Crit.Hab. Closest Maj. Wtr. Body yes / no Type of Project/ Activity (Scale: Pier (dock) lenpth Platf MENEM is Fing pier(s)— MEMMUMEM nil EM MEMMEM No Gir roi 1 Mood M 0 0 Bulk max distance offshore Basin, channel cubic yards MIN 00 Boat ramp �PAIM Boat71MMMMWK MEN Beac Other Shor SAV: not sure yes no Sand ags: not sure yes no EME Mor yes no Agent or Applicant Printed Name Signature "Please read compliance statement on back of permit" Permit Officer's Signature Issuing Date Expiration Date ApplicationFee(s) Check# Local PlanningJurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: !] Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 9 10-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) INVITATION TO SUBMIT QUOTE NORTH LAWSON CREEK PARK DOCK Work to be completed by contract: The City proposes to eliminate future damage due to flooding and high water by installing a floating dock of the same footprint. Dimensions of the wooden dock are approximately 158 If x 8 If=1,264 sf, with three(3) 45 If sections of wooden seats with 42" high handrails down one side, using like kind materials and construction. Also, replace tv�o(2) 2"x 6" x 4' wooden deck boards on the small approach ramp to the dock. In order to meet the ADA requirements (36 CFR Part 1191, Sec. 15.2), project includes 158 If of curb along the side of the dock opposite the handrail side, and a 5' x 40'=200 sf wood walkway with underlying gravel approach. All wood elements of the project are to be treated wood. Project includes demolition and disposal of the existing dock, railing, pilings, and any other associated components, and engineering. Contractor is responsible for all required engineering (including drawings) and permits. Copies of current contractor's license and driver's license required; all requested insurance requirements and amounts will be met prior to awarding of contract. The City must be listed as additional insured on all certificates of insurance. THIS IS AN ALL OR NONE PROJECT (DEMOLITION, DISPOSAL, AND CONSTRUCTION) NOTE: THERE WILL BE A PRE -QUOTE MEETING, HELD ON FRIDAY, MARCH 16, 2012, AT LAWSON CREEK PARK PICNIC PAVILION ... 1309 COUNTRY CLUB ROAD(PEMBROKE EXIT) IN NEW BERN. Mail quote(s) to: City of New Bern ... P.O. Box 1129... New Bern, NC 28563-1129... attn: quote/piers OR Fax to: 252-636-2938 ANY QUESTIONS, CONTACT THURMAN HARDISON, DIRECTOR OF PARKS AND RECREATION @ 252-639-2900. FEDERAL EMERGENCY MANAGEMENT AGENCY DIAGRAM APPLICANT: lNew Bern CATEGORY: I G FIPS NO. 049-46340-00 JPW REF NO. I N13GBB01 Lawem Creek - North `G.tf1 i C✓t-b To x r„t moo,. 1 r r + r /, r i • rr, i / i r' rr• 1 !r n�Mr Err. +• r /� e.x h .an t i� i ii,'i f. I r,•' • i � f \7, v s 4 IV1110ni1 VW IeMpl3[e VZA Mly 2011 EXCe12007 LOCATION MAP PAGE 1 OF 1 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is by and between the City of New Bern (hereinafter called OWNER) and Abbott Marine Construction (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 — WORK 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: North Dock, Lawson Creek Park. New Bern, North Carolina 28560 ARTICLE 2 — THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Demolition of existing, and construction of north dock and at Lawson Creek Park. ARTICLE 3 — ENGINEER 3.01 ARTICLE 4 — CONTRACT TIMES 401 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Days to Achieve Substantial Completion and Final payment 1IPage NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal ijlAanagement Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Direc`or Secretary BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for' pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. s. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. , !(d y Permit Off' er's ignature ISS4 Date Washington Office 943 Washington Square Mall Washington, NC 27889 Phone 252-946-6481 Morehead City Office 400 Commerce Avenue Morehead City, NC 28557 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Version 5, 0912009