HomeMy WebLinkAbout24592_MURPHREY, DURWARD_20000608CAMA and DREDGE
G E N E
PERM
as authorized by the State o
Department of Environmen
in an area of environmental
t
AND FILL
A
R A L 14592
I T
f North Carolina
and Natural Resources and the Coastal Resources Commission
concern pursuant to 15 NCAC
Applicant Namej)( �lt�r2� MUrZ'a�12� Phone Number
Address
City
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
State
Zip
IPROJECT DESCRIPTION SKETCH (SCALE:
Pier (dock) Length _ i 7
Groin Length
number
Bulkhead Length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
Tkic narmit is coikiart to ! nlinnr %Alitk thic nnnlitinn cit. Arne Ana 4 __11, .,
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies thatthis project
is consistent with the North Carolina Coastal Management Program.
applicant's signature
permit officer's signature
issuing date expiration date
attachments
application fee
Johnnie 0. Murphrey NCDL 480123 66-30/44 4004
Nell M. Murphrey NCDL 64653
Rtl Box 258 Ph 753-4813
Snow Hill, NC 28580 DATE —b . OU
PAY TO T EN����
ORDER OF
qwPkfor:Mi,, r nl signature line, gray type and Ilncwork. Flrsl Citizens Bank logo on back. If no( present, do not cash.
FIRr►T CITIZENS - Charter nest
n ,� N K Snow
Citizens N.C.28 &Trust Company
��1� Snow Hill, . 28580 � y�
FOR Cp +-rl�
1:0 5 3 L00 3001:00449 7 3 3 3i1' 04004
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIERIMOORING PILINGSIBOA TLIFTIBOA THOUSE)
I hereby certify that I own property adjacent to ►''�?/q Y �'�J✓ ''�
(Name of Property Owner)
Property located at "0 V-,
(Lot, Block, Road, etc.)
on ::zs4r'23l�S ,in CA✓-ke �N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
I do not wish to waive the setback requirement.
I d-Q wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPIVIENNT:
(To be filled in by individual proposing development)
bobb;�
AA
I /I U r-pAj)
Signatu
Print or Type Name
Telephone Number
Date: LA—A-0—
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIERIMOORING PILINGSIBOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent to u'r"r�7 ►-� Al"- �Yr 's
(Name of Property Owner)
property located at
on
(Waterbody)
(Lot, Block, Road, etc.)
in
(Town and/or County)
N.C.
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatliftlboathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
I do not wish to waive the setback requirement.
V I d_q wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWr G OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
J,� o b-�> /- �f
1'IUr�/1rc,
6
C,a Z2
Signature
I n� E' �j•-
Print or Type Name
5 - 3- ) 77
Telephone Number
Date: Chi1-7)o 0
ENR - COASTAL MANAGEMENT TI SA: 07H .2500
SECTION .2500 - EMERGENCY GENERAL PERNUT FOR REPLACEMENT OF STRUCTURES,
THE RECONSTRUCTION OF PRIMARY OR FRONTAL DUNE SYSTEMS, AND THE
MAINTENANCE EXCAVATION OF EXISTING CANALS, BASINS, CHANNELS, OR DITCHES,
DAMAGED, DESTROYED, OR FILLED IN BY 1999 HURRICANES OR TROPICAL STORMS,
PROVIDED ALL REPLACE EN7, RECONSTRUCTION AND MAINTENANCE EXCAVATION
ACTIVITIES CONFORM TO ALL CURRENT STANDARDS
.2501 PURPOSE
This permit shall allow for A) the replacement of structures that were located within the estuarine
system and/or public trust Areas of Environmental Concern and that were destroyed or damaged
beyond 50 percent of the structure's value as a result of any 1999 hurricane or tropical storm, B) a
one time per property fee deferment for the reconstruction or repair by beach bulldozing of hurricane
or tropical storm damaged frontal or primary dune systems, and C) a one time per property fee
deferment for maintenance dredging activities within existing basins, canals, channels, and ditches.
Structure replacement, dune reconstruction, and maintenance excavation activities authorized by this
permit shall conform with all current use standards and regulations. The structural replacement
component of this general permit shall only be applicable where the structure was in place and
serving its intended function as of September 4, 1999, and shall not apply within the Ocean Hazard
System of Areas of Environmental Concern (AEC) or waters adjacent to these ABCs with the
exception of those portions of shoreline that feature characteristics of Estuarine Shorelines. Such
features include the presence'of wetland vegetation, lower wave energy, and lower erosion rates than
in the adjoining Ocean Erodible Area.
.2502 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and request approval for structural
replacement, dune reconstruction, or maintenance excavation. The applicant shall provide information on site
location, dimensions of the project area, and his or her name and address. _
(b) The applicant must provide:
(1) Description of the extent of repair, replacement, reconstruction, or maintenance excavation
needed, including dimensions and shoreline length,
(2) In the case of structural replacements, any additional documentation confirming the existence of
the structure prior to the hurricane or tropical storm, such as surveys, previous permits,
photographs or videos.
(c) For projects involving the excavation or filling of any area of estuarine water, the applicant must
provide confirmation that the adjacent riparian property owners have been notified by certified mail of the
proposed work. Such notice shall instruct adjacent property owners to provide any comments on the
proposed development in writing for consideration by permitting officials to the Division of Coastal
Management within 10 days of receipt of the notice, and, indicate that no response shall be interpreted as no
objection. DCM staff shall review all comments and determine, based on their relevance to the potential
impacts of the proposed project, if the proposed project can be approved by this General Permit. If DCM
staff finds that the comments are worthy of more in-depth review, the applicant shall be notified that he or
she must submit an application for a major development permit.
(d) No work shall beagin until a meeting is held with the applicant and appropriate Division of Coastal
Management representative. Written authorization to proceed with the proposed development may be
issued during this meeting.
(e) Replacement, reconstruction or maintenance excavation activities must be completed on or before
October 1, 2000.
(f) Authorizations under this General Permit shall not be issued after October 1, 2000.
History Note: Statutory Authority G.S. 113A-107,• 113A-118.1;
Proposed Emergency General Permit Pa , e I
ENR - COASTAL MANAGEMENT TI SA: 07H.2500
Coastal Management. When shoreline configuration is such that a perpendicular alignment can not be
achieved, the pier shall be aligned to meet the intent of this Rule to the maximum extent practicable. The
setback may be waived by written agreement of the adjacent riparian owner(s) or when the two adjoining
riparian owners are co -applicants. Should the adjacent property be sold before replacement of the structure
begins, the applicant shall obtain a written agreement with the new owner waiving the minimum setback and
submit it to the Division of Coastal Management prior to initiating any construction of the structure.
History Note: Statutory Authority G.S. 113A-107; 113A-118.1,
Proposed Emergency General Permit Page 3