Loading...
HomeMy WebLinkAbout24592_MURPHREY, DURWARD_20000608CAMA and DREDGE G E N E PERM as authorized by the State o Department of Environmen in an area of environmental t AND FILL A R A L 14592 I T f North Carolina and Natural Resources and the Coastal Resources Commission concern pursuant to 15 NCAC Applicant Namej)( �lt�r2� MUrZ'a�12� Phone Number Address City Project Location (County, State Road, Water Body, etc.) Type of Project Activity State Zip IPROJECT DESCRIPTION SKETCH (SCALE: Pier (dock) Length _ i 7 Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other Tkic narmit is coikiart to ! nlinnr %Alitk thic nnnli­tinn cit. Arne Ana 4 __11, ., and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies thatthis project is consistent with the North Carolina Coastal Management Program. applicant's signature permit officer's signature issuing date expiration date attachments application fee Johnnie 0. Murphrey NCDL 480123 66-30/44 4004 Nell M. Murphrey NCDL 64653 Rtl Box 258 Ph 753-4813 Snow Hill, NC 28580 DATE —b . OU PAY TO T EN���� ORDER OF qwPkfor:Mi,, r nl signature line, gray type and Ilncwork. Flrsl Citizens Bank logo on back. If no( present, do not cash. FIRr►T CITIZENS - Charter nest n ,� N K Snow Citizens N.C.28 &Trust Company ��1� Snow Hill, . 28580 � y� FOR Cp +-rl� 1:0 5 3 L00 3001:00449 7 3 3 3i1' 04004 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIERIMOORING PILINGSIBOA TLIFTIBOA THOUSE) I hereby certify that I own property adjacent to ►''�?/q Y �'�J✓ ''� (Name of Property Owner) Property located at "0 V-, (Lot, Block, Road, etc.) on ::zs4r'23l�S ,in CA✓-ke �N.C. (Waterbody) (Town and/or County) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. I d-Q wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPIVIENNT: (To be filled in by individual proposing development) bobb;� AA I /I U r-pAj) Signatu Print or Type Name Telephone Number Date: LA—A-0— ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIERIMOORING PILINGSIBOATLIFT/BOATHOUSE) I hereby certify that I own property adjacent to u'r"r�7 ►-� Al"- �Yr 's (Name of Property Owner) property located at on (Waterbody) (Lot, Block, Road, etc.) in (Town and/or County) N.C. He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatliftlboathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. V I d_q wish to waive that setback requirement. DESCRIPTION AND/OR DRAWr G OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) J,� o b-�> /- �f 1'IUr�/1rc, 6 C,a Z2 Signature I n� E' �j•- Print or Type Name 5 - 3- ) 77 Telephone Number Date: Chi1-7)o 0 ENR - COASTAL MANAGEMENT TI SA: 07H .2500 SECTION .2500 - EMERGENCY GENERAL PERNUT FOR REPLACEMENT OF STRUCTURES, THE RECONSTRUCTION OF PRIMARY OR FRONTAL DUNE SYSTEMS, AND THE MAINTENANCE EXCAVATION OF EXISTING CANALS, BASINS, CHANNELS, OR DITCHES, DAMAGED, DESTROYED, OR FILLED IN BY 1999 HURRICANES OR TROPICAL STORMS, PROVIDED ALL REPLACE EN7, RECONSTRUCTION AND MAINTENANCE EXCAVATION ACTIVITIES CONFORM TO ALL CURRENT STANDARDS .2501 PURPOSE This permit shall allow for A) the replacement of structures that were located within the estuarine system and/or public trust Areas of Environmental Concern and that were destroyed or damaged beyond 50 percent of the structure's value as a result of any 1999 hurricane or tropical storm, B) a one time per property fee deferment for the reconstruction or repair by beach bulldozing of hurricane or tropical storm damaged frontal or primary dune systems, and C) a one time per property fee deferment for maintenance dredging activities within existing basins, canals, channels, and ditches. Structure replacement, dune reconstruction, and maintenance excavation activities authorized by this permit shall conform with all current use standards and regulations. The structural replacement component of this general permit shall only be applicable where the structure was in place and serving its intended function as of September 4, 1999, and shall not apply within the Ocean Hazard System of Areas of Environmental Concern (AEC) or waters adjacent to these ABCs with the exception of those portions of shoreline that feature characteristics of Estuarine Shorelines. Such features include the presence'of wetland vegetation, lower wave energy, and lower erosion rates than in the adjoining Ocean Erodible Area. .2502 APPROVAL PROCEDURES (a) The applicant must contact the Division of Coastal Management and request approval for structural replacement, dune reconstruction, or maintenance excavation. The applicant shall provide information on site location, dimensions of the project area, and his or her name and address. _ (b) The applicant must provide: (1) Description of the extent of repair, replacement, reconstruction, or maintenance excavation needed, including dimensions and shoreline length, (2) In the case of structural replacements, any additional documentation confirming the existence of the structure prior to the hurricane or tropical storm, such as surveys, previous permits, photographs or videos. (c) For projects involving the excavation or filling of any area of estuarine water, the applicant must provide confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work. Such notice shall instruct adjacent property owners to provide any comments on the proposed development in writing for consideration by permitting officials to the Division of Coastal Management within 10 days of receipt of the notice, and, indicate that no response shall be interpreted as no objection. DCM staff shall review all comments and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can be approved by this General Permit. If DCM staff finds that the comments are worthy of more in-depth review, the applicant shall be notified that he or she must submit an application for a major development permit. (d) No work shall beagin until a meeting is held with the applicant and appropriate Division of Coastal Management representative. Written authorization to proceed with the proposed development may be issued during this meeting. (e) Replacement, reconstruction or maintenance excavation activities must be completed on or before October 1, 2000. (f) Authorizations under this General Permit shall not be issued after October 1, 2000. History Note: Statutory Authority G.S. 113A-107,• 113A-118.1; Proposed Emergency General Permit Pa , e I ENR - COASTAL MANAGEMENT TI SA: 07H.2500 Coastal Management. When shoreline configuration is such that a perpendicular alignment can not be achieved, the pier shall be aligned to meet the intent of this Rule to the maximum extent practicable. The setback may be waived by written agreement of the adjacent riparian owner(s) or when the two adjoining riparian owners are co -applicants. Should the adjacent property be sold before replacement of the structure begins, the applicant shall obtain a written agreement with the new owner waiving the minimum setback and submit it to the Division of Coastal Management prior to initiating any construction of the structure. History Note: Statutory Authority G.S. 113A-107; 113A-118.1, Proposed Emergency General Permit Page 3