Loading...
HomeMy WebLinkAbout24024_HENRY, RAY & LISA_200001214 Applicant Name Address City CAMA and DREDGE AND FILL - G E N E R A L i'�' 924 2 OQO PERMIT ��`��� as authorized by the State of North Carolina COASTAL FRtHEGDM�NT Department of Environment and Natural Res oasta Resources Commission in an area of environmental concern pursuant to 15 NCAC ' i,, Project Location (County, State Road, Water Body, etc.) Type of Project Activity PROJECT DESCRIPTION SKETCH Pier (dock) Length = Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other State Phone Number Zip (SCALE: This permit is subject to compliance with this application, site drawing_ and attached general and ecific conditions. An violation othese terms g p y lif � applicant's signature may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- �— permit officer's signature ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies thatthis project is consistent with the North Carolina Coastal Management Program. issuing date expiration date attachments $;c• Co m� rp 3 5 ins application fee ?JM 03 '?5 ;4--- —LDE G- x"-S P.1 1 • Spajl* BOATUFTS R. R. SPROUSE MARINE CONSTRUCTTON CUSTIJMLRi RAY HENRY CUSTOM 1E,00 L3, ROLIF T PILING DIAGRAM 17` 9►_3. 1D' PILINGS 18`-6, June 22. 1999 � w To Whom It Mav Concern: The sketch below describes a project (dock and boat lift) proposed for Lot #19, Schooner Point, Belhaven. NC. Lot =19 owners are Rav and Lisa Henry )919) 42'-71 �,9 (dav) 320Yellow Poplar Ave. (919)�62-0926 (eve) Wake Forest. NC 271�87 Construction to be completed on or before 9/30%99 LOT #19 c j - Boat n= 1 = ti Lift c c CC ler depthline ya C C C r� 3 ca 1 70 I i 0 N N O / iMGRESS.. {sue°on- platy; sr-o- Not to Scale The undersigned does not have any objection to the project as sketched in the above diagram. Sinned: �1 C �C�► Vg, c,,—, 0 a BUILDING CONTRACTOR 6 Holly Ave., P.O. Box 639 Island Heights, NJ 08732 08/10/9 . Addendum to CAMA and Dredge and Fill General Permit NO.22995-B PROPFRTYAND DOC%LOCATION. Vale's Greek N 9 20 feet 4 Applicant proposes the changes above (relocation of dock structure along waterfront and boat lift arrangement) to permit No. 22995-3, issued on 24 July, 1999 and accepts all instructions, attachments and references on said original application, Signature of Appli t + 08/10/99 09:37 FAX 9194721994 ERICSSON WCS DEFT LQuus k . Addendum to CAMA and Dredge and Fill General Permit NO. 22995-B DETAIL OF DOCK DESIGN: 14'-0" j piling — Boat tiR pilings to - be EXAMY 16 b — — feet by 17 feet as ~ ly I �i piling shown Lot 19, Schooner Point Belhaven, NC Ray and Lisa Henry 320 Yellow Poplar Ave Wake Forest, NC 27587 (919)472-7159(day) (919)562-0926(eye) flchenry@netscape.net —I-- -T- Applicant proposes the changes above (relocation of dock structure along waterfront and boat lift arrangement) to permit No. 22995-B, issued on 20 July, 1999 and accepts al! instructions, attachments and references on said original application. Signature ofApplic �����