HomeMy WebLinkAbout47834_PINE KNOLL ASSOC. & CUMMINGS, JACK_20070207❑CAMA / ❑ DREDGE & FILL R
r. GENERAL PERMIT Previous permit#
❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issLQ
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commis ion in an area of environmental concern pursuant to I SA NCAC
P/ �( /� � �J ❑Rules attached.
Applicant Name 'v 1 Project Location: County
Address Street Address/ State Road/ Lot #(s)
City State ZIP
Phone # ( )
Authorized Agent
Affected ❑ cW
AEC(s): ❑ OEA
❑ PWS:
ORW: yes / no
Fax # ( )
❑ EW ❑ PTA ❑ ES ❑ PTS
❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ FC:
PNA yes / no Crit.Hab. yes / no
Type of Project/ Activity.
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length
SAV: not sure yes
no
Sandbags: not sure yes
no
Moratorium: n/a yes
no
Photos: yes
no
Waiver Attached: yes
no
A building permit may be required
by:
Notes/ Special Conditions
Agent or Applicapt"Printed
Name 71
y
G
Signature Please read compliance statement on back of permit **
Subdivision
City
ZIP
Phone # ( ) River Basin
Adj. Wtr. Body (nat /man /unkn)
Closest Maj. Wtr. Body
(Scale: )
❑ See note on back regarding River Basin rules.
Permit Officer's Signature
Issuing Date
Expiration Date
Application Fee(s)
Check# Local Planning Jurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax: 919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
'AMA ! ❑DREDGE & FILL
ENERAL PERMIT
- New ❑Modification X2omplete Reissue ❑Partial Reissue
N° 4'7834c
Previous permit #
Date previous permit issued y 2`Z 70 6
As authorized by the State of North Carolina, Department of Environment and Natural Resources —� j L J { ob
and the Coastal Resources Commission in an area of environmental cone rn pursuant to I SA NCAC / �7 l
�l f J fl � C&AV,%^ I Afs> / Rules attached.
Applicant Name �i ht 9-��� 11 jf o-C �� c. Project Location: County CAY fell{L `
Address /"' Street Address/ Se RJoad/ Lotn#(s)
City A � State l�% ZIP a(D Z 2 � �'''`�r d' ff�k ICti �i � %1✓�
Phone # �� )-1 `10--00OFax # (�) Subdivision P� f
Authorized Agent Pk C�inni •') CityP�,,�^ ZIP'S�i�
CW e0W 7WA r,. !TES ❑ PTS Phone # (T) River Basin
Affected
AEC(s): OEA HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body �i�!UAG �� ���} P/G"`' '�
PWS: ❑FC: nat unkn
ORW: yes / no� PNA yes / noj Crit.Hab. yes / no Closest Maj. Wtr. Body
Type of Project/ Activity �Z
Pier (dock) length
Platform(s)
l
Finger piers) i
Groin length -- y-- - —r
number
Bulkhead/ Riprap length C� — L_ ` -
avg distance offshore___
max distance offshore
Basin, channel
!
- -i
cubic yards
Boat
l
O I/ (� 1 0,i+ /11
ramp
Boathouse/Boatlift
Beach Bulldozing7-1
Other
Shoreline Length
SAV: not sure
yes
Sandbags: not sure
yes
Moratorium: n/a
Y es
g
i
Photos:
yes
Waiver Attached:
yes
_ . _ _ �
�
A building permit may be required by: V t—
Notes/ Special Conditions
Agent or Applicant
Signature Please read compliance statement on back of permit **
(�uv �—1 -b5
A_..r,..,.:.._ c_..i_\ r�,__�. at
(Scale: /./ -( T )
❑ See note on back regarding River Basin rules.
/
Issuin ate Expirati n Date
Local Plannino lurisdictinn Rover File Name
PL_
rAt
NCDE HR
-North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., secretary
February 8, 2007
Pine Knoll Assoc.
C/o Jack Cummings
PO Box 905
Atlantic Beach, NC 28512
Dear Mr. Cummings:
Attached is General Permit 447834C.
In order to validate this permit, please sign the permit as indicated. Retain the white copy for
your files and return the signed yellow and pink copies to us in the enclosed, self-addressed
envelope. If the signed permit copies are not returned to this office before the initiation of
development, you will be working without authorization and will be subject to a Notice of
Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sincerely, �
cic
Ryan Davenport
Coastal Management Representative
lsb
Enclosures
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer— 50% Recvded l to% Post consumer Paper
PINE KNOLL ASSOCIATION, INC.
P.O. Box 905, Atlantic Beach NC 28512
(252) 240-1717, pkainc cgearthlink.net
January 8, 2007
Mr. Ryan Davenport
Field Representative
Division of Coastal Management
North Carolina Department of Environment and Natural Resources
400 Commerce Avenue
Morehead City, NC 28557
Re: General Permit Number 45176
Dated April 24, 2006
Dear Mr. Davenport,
is FORVED
MOrPhoal Ofty ocM
Pine Knoll Association requests a continuance of the above referenced permit for Bulkhead
replacement at Ramsey Park in Pine Knoll Shores. We were unable to complete the work
covered by this permit in the time allotted due to delay of materials/contractor.
Please find enclosed our check in the amount of $ 200.00 and copies of the consent forms signed
by the adjacent riparian land owners.
If you have any questions or require additional information please contact me at 252-240-0063,
by e-mail at boatsmart(&ec.rr.com , or via post at 113 Arborvitae Drive, Pine Knoll Shores, NC
28512-6201.
Regards,
Jack ru�mins, Chairman
Waterways Committee
John Halada, President
Pine Knoll Association