Loading...
HomeMy WebLinkAbout47834_PINE KNOLL ASSOC. & CUMMINGS, JACK_20070207❑CAMA / ❑ DREDGE & FILL R r. GENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issLQ As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commis ion in an area of environmental concern pursuant to I SA NCAC P/ �( /� � �J ❑Rules attached. Applicant Name 'v 1 Project Location: County Address Street Address/ State Road/ Lot #(s) City State ZIP Phone # ( ) Authorized Agent Affected ❑ cW AEC(s): ❑ OEA ❑ PWS: ORW: yes / no Fax # ( ) ❑ EW ❑ PTA ❑ ES ❑ PTS ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ FC: PNA yes / no Crit.Hab. yes / no Type of Project/ Activity. Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions Agent or Applicapt"Printed Name 71 y G Signature Please read compliance statement on back of permit ** Subdivision City ZIP Phone # ( ) River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body (Scale: ) ❑ See note on back regarding River Basin rules. Permit Officer's Signature Issuing Date Expiration Date Application Fee(s) Check# Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 'AMA ! ❑DREDGE & FILL ENERAL PERMIT - New ❑Modification X2omplete Reissue ❑Partial Reissue N° 4'7834c Previous permit # Date previous permit issued y 2`Z 70 6 As authorized by the State of North Carolina, Department of Environment and Natural Resources —� j L J { ob and the Coastal Resources Commission in an area of environmental cone rn pursuant to I SA NCAC / �7 l �l f J fl � C&AV,%^ I Afs> / Rules attached. Applicant Name �i ht 9-��� 11 jf o-C �� c. Project Location: County CAY fell{L ` Address /"' Street Address/ Se RJoad/ Lotn#(s) City A � State l�% ZIP a(D Z 2 � �'''`�r d' ff�k ICti �i � %1✓� Phone # �� )-1 `10--00OFax # (�) Subdivision P� f Authorized Agent Pk C�inni •') CityP�,,�^ ZIP'S�i� CW e0W 7WA r,. !TES ❑ PTS Phone # (T) River Basin Affected AEC(s): OEA HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body �i�!UAG �� ���} P/G"`' '� PWS: ❑FC: nat unkn ORW: yes / no� PNA yes / noj Crit.Hab. yes / no Closest Maj. Wtr. Body Type of Project/ Activity �Z Pier (dock) length Platform(s) l Finger piers) i Groin length -- y-- - —r number Bulkhead/ Riprap length C� — L_ ` - avg distance offshore___ max distance offshore Basin, channel ! - -i cubic yards Boat l O I/ (� 1 0,i+ /11 ramp Boathouse/Boatlift Beach Bulldozing7-1 Other Shoreline Length SAV: not sure yes Sandbags: not sure yes Moratorium: n/a Y es g i Photos: yes Waiver Attached: yes _ . _ _ � � A building permit may be required by: V t— Notes/ Special Conditions Agent or Applicant Signature Please read compliance statement on back of permit ** (�uv �—1 -b5 A_..r,..,.:.._ c_..i_\ r�,__�. at (Scale: /./ -( T ) ❑ See note on back regarding River Basin rules. / Issuin ate Expirati n Date Local Plannino lurisdictinn Rover File Name PL_ rAt NCDE HR -North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., secretary February 8, 2007 Pine Knoll Assoc. C/o Jack Cummings PO Box 905 Atlantic Beach, NC 28512 Dear Mr. Cummings: Attached is General Permit 447834C. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, � cic Ryan Davenport Coastal Management Representative lsb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer— 50% Recvded l to% Post consumer Paper PINE KNOLL ASSOCIATION, INC. P.O. Box 905, Atlantic Beach NC 28512 (252) 240-1717, pkainc cgearthlink.net January 8, 2007 Mr. Ryan Davenport Field Representative Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, NC 28557 Re: General Permit Number 45176 Dated April 24, 2006 Dear Mr. Davenport, is FORVED MOrPhoal Ofty ocM Pine Knoll Association requests a continuance of the above referenced permit for Bulkhead replacement at Ramsey Park in Pine Knoll Shores. We were unable to complete the work covered by this permit in the time allotted due to delay of materials/contractor. Please find enclosed our check in the amount of $ 200.00 and copies of the consent forms signed by the adjacent riparian land owners. If you have any questions or require additional information please contact me at 252-240-0063, by e-mail at boatsmart(&ec.rr.com , or via post at 113 Arborvitae Drive, Pine Knoll Shores, NC 28512-6201. Regards, Jack ru�mins, Chairman Waterways Committee John Halada, President Pine Knoll Association