HomeMy WebLinkAbout47325_PARKER, JACK_2006100410
1:1CAMA / E DREDGE & FILL
GENERAL PERMIT Previous permit
ENew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
❑ Rules attached.
Applicant Name
Address
City - State .ZIP
Phone # (�) } Fax # ( )
Authorized Agent �_ t
Affected El CW ❑EW [[PTA DES -PTS
AEC(s): El OEA ❑ HHF ❑ IH - USA N/A
❑ PWS: FC:
ORW: yes / no PNA yes / no Crit. Hab. yes / no
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore j
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other_
Shoreline Length
SAV: not sure yes no
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by:
Notes/ Special Conditions
Project Location: County
Street Address/ State Road/ Lot #(s)
Subdivision
City ZIP
Phone # O River Basin
Adj. Wtr. Body <_ _(nat /man /unkn)
f,
Closest Maj. Wtr. Body
(Scale: )
See note on back regarding River Basin rules.
- OCT - 4 Z006 t
Agent or Applicant Printed Name Permit" s .ign
orehead City DCM i
Signature ** Please read compliance statement on back of permit lssdir�g Date Expiration Date 1
Application Fee(s) Check # Local"Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules L Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Central Office
Elizabeth City District
Mailing Address:
1367 US. 17 South
1638 Mail Service Center
Elizabeth City, NC 27909
Raleigh, NC 27699-1638
252-264-3901
Location:
Fax: 252-264-3723
Parker -Lincoln Building
(Serves: Camden, Chowan, Currituck,
2728 Capital Blvd.
Dare, Gates, Pasquotank and Perquimans
P
Counties)
Raleigh, NC 27604
919-733-2293
Morehead City District
Fax: 919-733-1495
400 Commerce Ave
Morehead City, NC 28557
202-808-2808/ 1-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 06/29/05
08/293M FRI 08:38 FAX 919 546 9984 R.N. ROUSE & CO. Z 002
Sep-N-2006 13:57 From-RANDT
ZSZ2403243
T-376 P.002/002 F-17E
` .(. ,yL
klOrQh
ADJACENT RIPE-
R�'Y'° OWNE STA`TEl�[ENT4� �c�V1
ARIAN PROP
ERT'V AMACNE'T TO _
I HEIABY CERTrFY THAT I OWN PROP NA&NMF O'F
PROPERTY LOCATED AT—_---
(I-OT, BLOCK, RO D. ETC.)
ON — - (TpK'N OR CO
BLON )
SWAT OD
KE HAS DESCRIBED TOME AS SHOWN BELOW. 0 OB,IEACTIONSOTO H ST HE IS
PROPOSING AT THAT LOCATIION AND, i HAVE
PROPOSAL --
DESCRIPTION AND 'OR- DRAWING OF PROPOSED
DEVELOPMENT (TodDo97'L D N Hy 11'DIY1nUokl. PR0PL)41N%! DEVFLOPMv�TI
punt or type name
Tclephone numbcr
DATE_ Z�
ADJACENT RIPARIAN PROPERTY
OWNnfSTATEMEN
I HERBY CERTIFY THAT I OWN PROPERTY ADJACNET TO '`--
(NAME KF PROPERTY OWNER)
PROPERTY LOCATED AT
(LOT, BLOCK, ROAD, ETC.)
ON ,IN ,NC
(WA ERBODY) (TOWN AND/OR COUNTY)
HE HAS DESCRIBED TO ME AS SHOWN BELOW, THE DEVELOPMENT HE IS
PROPOSING AT THAT LOCATIION AND, I HAVE NO OBJEACTIONS TO HIS
PROPOSAL..
----------------------------------------------------------------------------------------------------------
DESCRIPTION ANUOR DRAWING OF PROPOSED
DEVELOPMENT (TO BE FILLED IN BY INDIVIDUAL PROPOSING DEVELOPMENT)
prof; -d-
�� Y' ►'�
I�xlSt �✓ccd
^ / 0 0-4 t� It e Act
ti
-�C
signatu
prin or type name
Telephone number
DATE G'~ 2,!2r-'>— 04
Page 1 of 1
Detailed View for record 1 (Print)
Field
Value
AREA 1121798.28473
PERIMETER
699.65395
PARCEL83 1144130
PARCEL83 1 144133
WHAT 110
PIN 117335189
MAPNUM 117335
BLOCK 1142
PDOT 117124
CONDO
MOTHER 110
MAPNAM 1733518
PRID 1108004GO108
PIN15 11733518427124000
OWNER IIPARKER,JACK
K
DBOOK 110506
DPAGE 1100262
DDATE
0
SALE PRICE 10
TAX VALUE 11290145
LAND VALUE 11128422
STRUC VAL 1146224
OTHER VAL
15499
BLT CONDO 10
HOUSE NUM 110000133
DIRECTION
ST NAME 11PELICAN
Field Value
ST TYPE LN
CITY IHARKERS ISLAND
ZIP 1128531
MAIL HOUSE
MAIL DIR
MAIL ST
MAIL STTYP
MAIL CITY I HARKERS ISLAND
MAIL STATE INC
MAIL ZI 128531
MAIL POBOX 11PO BOX 365
TOWNSHIP IHARKERS ISLAND
CITY LIMIT
NBHD 1180003
FIRE DIST IHARKERS ISLAND FIRE
RESCUE DST
LEGAL DSC ILOT HARKERS ISLAND
TOTAL ACR 10.445
Y BLT HOUS 11984
TOT SO FT 111424
ROLL TYPE JJR
BATHROOMS 112
BEDROOMS 12
NOISE LVL
RISK LEVEL
LACUIZ
http://maps.co.carteret.nc.us//details—Popup.htm 10/4/2006
SECTION .1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AND THE PLACEMENT
OF RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS AND
OCEAN HAZARD AREAS
ISA NCAC 07H .1101 PURPOSE
A permit under this Section shall allow the construction of bulkheads and the placement of riprap for shoreline protection in
the public trust waters and estuarine waters AI;Cs according to authority provided in Subchapter 07J .I 100 and according to
the Rules in this Section. This permit shall not apply to shoreline protection along the oceanfront or to waters and shorelines
adjacent to the Ocean Hazard AEC with the exception of those shorelines that feature characteristics of the Estuarine
Shoreline AEC. Such features include the presence of wetland vegetation, lower wave energy and lower erosion rates than the
adjoining Ocean Erodible Area.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); I13A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. April 1, 2003.
15A NCAC 07H .1102 APPROVAL PROCEDURES
(a) The applicant shall contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shalt provide information on site location, dimensions of the project area, and his name and
address.
(b) The applicant shall provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice shall instruct adjacent property owners to provide written comments on the proposed
development to the Division of Coastal Management within ten days o1'receipt of the notice, and, indicate that no
response shall be interpreted as no objection. DCM staff shall review all comments and determine, based on their
relevance to the potential impacts of the proposed project, if the proposed project can be approved by a General
Permit. If DCM staff determines that the project exceeds the guidelines established by the General Permit Process,
the applicant shall be notified that he must submit an application fora major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal Management
representative so that the proposed bulkhead atignment can he appropriately marked. Written authorization to proceed with
the proposed development may be issued during this visit. Construction of the bulkhead or riprap structure shall be completed
within 90 days of this visit or the general authorization shall expire and it shall be necessary to re-examine the alignment to
determine if the general authorization can be reissued.
History Note: Authority-G.S. 113A-107(a): 113A-107(b); I13A-113(b): 113A-118.1: 113A-124;
Eff: March 1, 1984:
Amended Eff. September I, 2006; January I. 1990; December 1, 1987.
15A NCAC 07H .1103 PERMIT FEE
The applicant shall pay a permit fee of two hundred dollars ($200.00) for riprap and bulkhead structures sited at or above
normal high water or normal water level, or a permit fee of four hundred dollars ($400.00) for bulkhead and riprap structures
sited below normal high water or normal water level. Permit fees shall be paid by check or money order payable to the
Department.
History Note: Authority G.S. 113A-107: 11.3A-113(b): I13A-118.1; 113A-119: 113-119.1: 113A-124;
Eff. March 1, 1984;
Amended Eff. September 1, 2006; August 1, 2000; March 1. 1991.
15A NCAC 07H .110 t GENERAL CONDITIONS
(a) This permit authorizes only the construction of bulkheads and the placement of riprap conforming to the standards herein.
(b) Individuals shall allow authorized representatives of the Department of Environment. Health, and Natural Resources to
make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under authority
of this general permit is in accordance with the terms and conditions prescribed herein.
_47X__
(c) There shall be no significant interference with navigation or use of the waters by the public by the existence of the
bulkhead or the riprap authorized herein.
(d) This permit will not be applicable to proposed construction where the Department has determined, based on an initial
review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved
questions concerning the proposed activity's impact on adjoining properties or on water quality: air quality; coastal wetlands;
cultural or historic sites; wildlife; fisheries resources; or public trust rights.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(1) Development carried out under this permit must be consistent with all local requirements, AEC rules, and local land use
plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. May 1, 1990; December 1, 1987;
RRC Objection due to ambiguitY Eff. May 19, 1994;
Amended Eff. August 1, 1998; Jule 1, 1994.
15A NCAC 071I .I105 SPECIFIC CONDITIONS
(a) This general permit is applicable only along shorelines void of wetland vegetation including marsh grass and wooded
swamp, or where all construction is to be accomplished landward of such vegetation.
(b) Bulkheads and riprap material shall be positioned as follows:
(1) Bulkheads shall be positioned so as not to exceed more than an average distance of 2 feet waterward of the
normal high water mark, or the normal water level contour, whichever is applicable. In no case shall the bulkhead be
positioned more than 5 feet waterward of the normal high water or normal water level contour at any point along its
alignment.
(2) Riprap shall be positioned so as not to exceed a maximum of 5 feet waterward of the mean high water mark or
normal water level contour at any point alone its alignment. Where there is an existing bulkhead structure, riprap
shall be allowed to extend a maximum of 10 feet offshore. This location standard shall take into consideration the
height of the area to be protected (i.e. bulkhead height, water depth) and the alignment shall allow for a slope no
flatter than 2 feet horizontal per I foot vertical and no steeper than 1 1/z feet horizontal per I foot vertical.
(c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to
exceed more than an averaoc distance of 5 feet waterward of the normal high water mark or the normal water level contour,
whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet waterward of the normal high
water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atlantic Intracoastal
Waterway (AIWW) is considered a natural shoreline and development shall occur as described in 711 .1 105(b).
(d) Construction authorized by this general permit shall be limited to maxinwln shoreline length of500 feet.
(e) All backfill material shall be obtained from an upland source.
(f) The bulkhead shall be constructed, or the riprap shall be in place prior to any backfilling activities.
The bulkhead or riprap shall be structurally tight so as to prevent seepage of backfill materials through the structure.
(h) Riprap material shall be free fi-om loose dirt or any other pollutant. It shall be of a size sufficient to prevent its movement
from the site by wave or current action.
(i) Riprap material shall consist of clean rock or masonry materials such as but not limited to granite or broken concrete.
Materials such as tires, car bodies, scrap metal, paper products, tree limbs. wood debris, organic material or similar material,
are not considered riprap.
(j) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials
approved by department personnel. No excavation is permitted except for that which maybe required for the construction of
the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved
alignment.
(k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the canal or basin.
(1) If one contiguous acre or more of property is to be excavated or filled, an erosion and sedimentation control plan shall be
filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction. This
plan shall be approved prior to commencing the land -disturbing; activity.
History Note: Authoriq• G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113:1-124;
Eff. March 1. 1984.
Amended Eff. April 1. 2005: December 1, 1991: January 1, 1989: December 1, 1987.
LARRY G. ARNOLD
P O Box 2277 1947
Morehead City, NC 28557 6e-21/5,30
/ BRANCH 77615
Pay tothe
Order of
WAcxovrA y7,:5,-77G
8 F.:wie;
Wachovia Bank, N.A. 44 Z n
wachoviavia.com
00 2 i9D. i05466 1894 286n i94 7hp