Loading...
HomeMy WebLinkAbout47325_PARKER, JACK_2006100410 1:1CAMA / E DREDGE & FILL GENERAL PERMIT Previous permit ENew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name Address City - State .ZIP Phone # (�) } Fax # ( ) Authorized Agent �_ t Affected El CW ❑EW [[PTA DES -PTS AEC(s): El OEA ❑ HHF ❑ IH - USA N/A ❑ PWS: FC: ORW: yes / no PNA yes / no Crit. Hab. yes / no Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore j Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other_ Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions Project Location: County Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # O River Basin Adj. Wtr. Body <_ _(nat /man /unkn) f, Closest Maj. Wtr. Body (Scale: ) See note on back regarding River Basin rules. - OCT - 4 Z006 t Agent or Applicant Printed Name Permit" s .ign orehead City DCM i Signature ** Please read compliance statement on back of permit lssdir�g Date Expiration Date 1 Application Fee(s) Check # Local"Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules L Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 US. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Fax: 252-264-3723 Parker -Lincoln Building (Serves: Camden, Chowan, Currituck, 2728 Capital Blvd. Dare, Gates, Pasquotank and Perquimans P Counties) Raleigh, NC 27604 919-733-2293 Morehead City District Fax: 919-733-1495 400 Commerce Ave Morehead City, NC 28557 202-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 06/29/05 08/293M FRI 08:38 FAX 919 546 9984 R.N. ROUSE & CO. Z 002 Sep-N-2006 13:57 From-RANDT ZSZ2403243 T-376 P.002/002 F-17E ` .(. ,yL klOrQh ADJACENT RIPE- R�'Y'° OWNE STA`TEl�[ENT4� �c�V1 ARIAN PROP ERT'V AMACNE'T TO _ I HEIABY CERTrFY THAT I OWN PROP NA&NMF O'F PROPERTY LOCATED AT—_--- (I-OT, BLOCK, RO D. ETC.) ON — - (TpK'N OR CO BLON ) SWAT OD KE HAS DESCRIBED TOME AS SHOWN BELOW. 0 OB,IEACTIONSOTO H ST HE IS PROPOSING AT THAT LOCATIION AND, i HAVE PROPOSAL -- DESCRIPTION AND 'OR- DRAWING OF PROPOSED DEVELOPMENT (TodDo97'L D N Hy 11'DIY1nUokl. PR0PL)41N%! DEVFLOPMv�TI punt or type name Tclephone numbcr DATE_ Z� ADJACENT RIPARIAN PROPERTY OWNnfSTATEMEN I HERBY CERTIFY THAT I OWN PROPERTY ADJACNET TO '`-- (NAME KF PROPERTY OWNER) PROPERTY LOCATED AT (LOT, BLOCK, ROAD, ETC.) ON ,IN ,NC (WA ERBODY) (TOWN AND/OR COUNTY) HE HAS DESCRIBED TO ME AS SHOWN BELOW, THE DEVELOPMENT HE IS PROPOSING AT THAT LOCATIION AND, I HAVE NO OBJEACTIONS TO HIS PROPOSAL.. ---------------------------------------------------------------------------------------------------------- DESCRIPTION ANUOR DRAWING OF PROPOSED DEVELOPMENT (TO BE FILLED IN BY INDIVIDUAL PROPOSING DEVELOPMENT) prof; -d- �� Y' ►'� I�xlSt �✓ccd ^ / 0 0-4 t� It e Act ti -�C signatu prin or type name Telephone number DATE G'~ 2,!2r-'>— 04 Page 1 of 1 Detailed View for record 1 (Print) Field Value AREA 1121798.28473 PERIMETER 699.65395 PARCEL83 1144130 PARCEL83 1 144133 WHAT 110 PIN 117335189 MAPNUM 117335 BLOCK 1142 PDOT 117124 CONDO MOTHER 110 MAPNAM 1733518 PRID 1108004GO108 PIN15 11733518427124000 OWNER IIPARKER,JACK K DBOOK 110506 DPAGE 1100262 DDATE 0 SALE PRICE 10 TAX VALUE 11290145 LAND VALUE 11128422 STRUC VAL 1146224 OTHER VAL 15499 BLT CONDO 10 HOUSE NUM 110000133 DIRECTION ST NAME 11PELICAN Field Value ST TYPE LN CITY IHARKERS ISLAND ZIP 1128531 MAIL HOUSE MAIL DIR MAIL ST MAIL STTYP MAIL CITY I HARKERS ISLAND MAIL STATE INC MAIL ZI 128531 MAIL POBOX 11PO BOX 365 TOWNSHIP IHARKERS ISLAND CITY LIMIT NBHD 1180003 FIRE DIST IHARKERS ISLAND FIRE RESCUE DST LEGAL DSC ILOT HARKERS ISLAND TOTAL ACR 10.445 Y BLT HOUS 11984 TOT SO FT 111424 ROLL TYPE JJR BATHROOMS 112 BEDROOMS 12 NOISE LVL RISK LEVEL LACUIZ http://maps.co.carteret.nc.us//details—Popup.htm 10/4/2006 SECTION .1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AND THE PLACEMENT OF RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS AND OCEAN HAZARD AREAS ISA NCAC 07H .1101 PURPOSE A permit under this Section shall allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters and estuarine waters AI;Cs according to authority provided in Subchapter 07J .I 100 and according to the Rules in this Section. This permit shall not apply to shoreline protection along the oceanfront or to waters and shorelines adjacent to the Ocean Hazard AEC with the exception of those shorelines that feature characteristics of the Estuarine Shoreline AEC. Such features include the presence of wetland vegetation, lower wave energy and lower erosion rates than the adjoining Ocean Erodible Area. History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); I13A-118.1; 113A-124; Eff. March 1, 1984; Amended Eff. April 1, 2003. 15A NCAC 07H .1102 APPROVAL PROCEDURES (a) The applicant shall contact the Division of Coastal Management and complete an application form requesting approval for development. The applicant shalt provide information on site location, dimensions of the project area, and his name and address. (b) The applicant shall provide: (1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners indicating that they have no objections to the proposed work; or (2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work. Such notice shall instruct adjacent property owners to provide written comments on the proposed development to the Division of Coastal Management within ten days o1'receipt of the notice, and, indicate that no response shall be interpreted as no objection. DCM staff shall review all comments and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can be approved by a General Permit. If DCM staff determines that the project exceeds the guidelines established by the General Permit Process, the applicant shall be notified that he must submit an application fora major development permit. (c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal Management representative so that the proposed bulkhead atignment can he appropriately marked. Written authorization to proceed with the proposed development may be issued during this visit. Construction of the bulkhead or riprap structure shall be completed within 90 days of this visit or the general authorization shall expire and it shall be necessary to re-examine the alignment to determine if the general authorization can be reissued. History Note: Authority-G.S. 113A-107(a): 113A-107(b); I13A-113(b): 113A-118.1: 113A-124; Eff: March 1, 1984: Amended Eff. September I, 2006; January I. 1990; December 1, 1987. 15A NCAC 07H .1103 PERMIT FEE The applicant shall pay a permit fee of two hundred dollars ($200.00) for riprap and bulkhead structures sited at or above normal high water or normal water level, or a permit fee of four hundred dollars ($400.00) for bulkhead and riprap structures sited below normal high water or normal water level. Permit fees shall be paid by check or money order payable to the Department. History Note: Authority G.S. 113A-107: 11.3A-113(b): I13A-118.1; 113A-119: 113-119.1: 113A-124; Eff. March 1, 1984; Amended Eff. September 1, 2006; August 1, 2000; March 1. 1991. 15A NCAC 07H .110 t GENERAL CONDITIONS (a) This permit authorizes only the construction of bulkheads and the placement of riprap conforming to the standards herein. (b) Individuals shall allow authorized representatives of the Department of Environment. Health, and Natural Resources to make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under authority of this general permit is in accordance with the terms and conditions prescribed herein. _47X__ (c) There shall be no significant interference with navigation or use of the waters by the public by the existence of the bulkhead or the riprap authorized herein. (d) This permit will not be applicable to proposed construction where the Department has determined, based on an initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality: air quality; coastal wetlands; cultural or historic sites; wildlife; fisheries resources; or public trust rights. (e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization. (1) Development carried out under this permit must be consistent with all local requirements, AEC rules, and local land use plans current at the time of authorization. History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; Eff. March 1, 1984; Amended Eff. May 1, 1990; December 1, 1987; RRC Objection due to ambiguitY Eff. May 19, 1994; Amended Eff. August 1, 1998; Jule 1, 1994. 15A NCAC 071I .I105 SPECIFIC CONDITIONS (a) This general permit is applicable only along shorelines void of wetland vegetation including marsh grass and wooded swamp, or where all construction is to be accomplished landward of such vegetation. (b) Bulkheads and riprap material shall be positioned as follows: (1) Bulkheads shall be positioned so as not to exceed more than an average distance of 2 feet waterward of the normal high water mark, or the normal water level contour, whichever is applicable. In no case shall the bulkhead be positioned more than 5 feet waterward of the normal high water or normal water level contour at any point along its alignment. (2) Riprap shall be positioned so as not to exceed a maximum of 5 feet waterward of the mean high water mark or normal water level contour at any point alone its alignment. Where there is an existing bulkhead structure, riprap shall be allowed to extend a maximum of 10 feet offshore. This location standard shall take into consideration the height of the area to be protected (i.e. bulkhead height, water depth) and the alignment shall allow for a slope no flatter than 2 feet horizontal per I foot vertical and no steeper than 1 1/z feet horizontal per I foot vertical. (c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to exceed more than an averaoc distance of 5 feet waterward of the normal high water mark or the normal water level contour, whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet waterward of the normal high water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atlantic Intracoastal Waterway (AIWW) is considered a natural shoreline and development shall occur as described in 711 .1 105(b). (d) Construction authorized by this general permit shall be limited to maxinwln shoreline length of500 feet. (e) All backfill material shall be obtained from an upland source. (f) The bulkhead shall be constructed, or the riprap shall be in place prior to any backfilling activities. The bulkhead or riprap shall be structurally tight so as to prevent seepage of backfill materials through the structure. (h) Riprap material shall be free fi-om loose dirt or any other pollutant. It shall be of a size sufficient to prevent its movement from the site by wave or current action. (i) Riprap material shall consist of clean rock or masonry materials such as but not limited to granite or broken concrete. Materials such as tires, car bodies, scrap metal, paper products, tree limbs. wood debris, organic material or similar material, are not considered riprap. (j) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which maybe required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. (k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the canal or basin. (1) If one contiguous acre or more of property is to be excavated or filled, an erosion and sedimentation control plan shall be filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction. This plan shall be approved prior to commencing the land -disturbing; activity. History Note: Authoriq• G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113:1-124; Eff. March 1. 1984. Amended Eff. April 1. 2005: December 1, 1991: January 1, 1989: December 1, 1987. LARRY G. ARNOLD P O Box 2277 1947 Morehead City, NC 28557 6e-21/5,30 / BRANCH 77615 Pay tothe Order of WAcxovrA y7,:5,-77G 8 F.:wie; Wachovia Bank, N.A. 44 Z n wachoviavia.com 00 2 i9D. i05466 1894 286n i94 7hp