Loading...
HomeMy WebLinkAbout44253_NC DOT_20060213 (2)C CAMA / DREDGE & FILL M 44253 GENERAL PERMIT Previous permit # .New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit i sued N As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC_ Z 5 LI y ❑ Rules attached. Applicant Name K Dd T Project Location: County�s ref Address__ , 0 , A c,,I 5-L Street Address/ State Road/ Lot #(s) City 6 f— Oeo 60lR. state ZlP 2-7 UY SloF i _('ret,11 � Y16 Phone # (� 9 � $3 d 3y ('y Fax # ( )_ Subdivision S 1 3 U C Sc� ,Sit l Authorized Agent 3-c'-( 1-0 k"k 5 C-- City_ MAv ` I f✓�, ZIP Affected KCW V EW ;PTA )< ES , PTS Phone # ( -) / River Basin A 4", O'e AEC(s) s) : ElOEA ❑ El IH ❑ UBA ❑ N/A /_ nat/manunkn _ • 1-1PWS: ❑ FC: Closest Maj. Wtr. Body Adj. Wtr. Body S_ %f=E• p �! CY`Pt' f� � ORW: yes / no PNA yes / no Crit. Hab. yes / no Type of Project/ Activity Cu / Gv^ -�- f\ P d le. aL t--t % (Scale: d 61 C�vn w � y) Pier (dock) length _ ___._--------------�------- ! r Platform(s) i Finger pier(s) Groin length — i lrc X SIt - - -jnumber Bulkhead/ Riprap length `2 (C�/ ��` X �V `� II avg distance offshore max distance offshore _. Basin, channel 1— —1— — - -- - - Boat ramp cubic yards Boathouse/ Boatlift — --- - — — - i Beach Bulldozing OtherU Shoreline Length - - SAM not sure yes Sandbags: not sure yes Moratorium: n/a yes no f _ { i Photos: Waiver Attached: y s no _�� - -- —'-- --- - - - - - - -- - - - - - - A building permit may be required by: / / ❑/ See note on back regarding River Basin rules. Notes/ Special Conditions ��4 O-� G �(,� Pi''7-S tN L4 5 se 14 -~ f�-27C /Z Ay 6.e jy r,.5 h1,Gk Agent or AppKcant Printed Name Signature ** Please read compliance statement on back of permit 100 A b,'t tOA Z,8201611 Application Fee(s) Check # Permit Officer's Si nature/ 2 o O Issu g Date // Ex iratio Date re7� ro . L PlanningJurisdiction Rover File Name r NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary March 1, 2006 Jay Johnson P O Box 1587 Greenville, NC 27834 Dear Mr. Johnson: Attached is General Permit 444252C and 44253C In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, Bill Arrington Coastal Management Representative lsb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net X DOT PERMIT FEE BILLING REQUEST Date: 2/13/06 To: Jaye Poole From: Bill Arrington Transfer Amount: $100.00 30-3yg0 g30,3352 DOT Project Description: General Permit Application for replacing culverts in an UT to Sleepy Creek, in Carteret County Bridge #: Site Location: SR 1346 in Carteret County at the crossing of an UT to Sleepy Creek, in the community of Marshalberg, Approximately 1800 feet east from SR 1343 State Road #: 1346 County: Carteret County DCM Permit Type and Number: General permit 44253 Fee Division if Applicable: (record amounts to be split with DWQ, if applicable) DCM: 100% DWQ: 0% WBS Element Number: 23201611 r Form DCM-MP-5 BRIDGES AND CULVERTS $100.00 Processing Fee h. Width of proposed bridge NCDOT WBSNO.2.B201611 i. Height of proposed bridge above wetlands NI-2040 j Attach this form to Joint Application for LAMA Major . Will the proposed bridge affect existing water flow? __Yes No Permit, Form DCM-MP-1. Be sure to complete all other If yes, explain sections of the Joint Application that relate to this proposed project. k. Navigation clearance underneath proposed bridge 1. BRIDGES N/A 1. Will the proposed bridge affect navigation by a. Public Private reducing or increasing the existing navigable opening? Yes _ No b. Type of bridge (construction material) If yes, explain c. Water body to be crossed by bridge in. Will the proposed bridge cross wetlands containing no navigable waters? Yes No d. Water depth at the proposed crossing at MLW or If yes, explain NWL e. Will proposed bridge replace an existing bridge? _ _Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain). f. Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert Tributary of Sleevv Creek b. Number of culverts proposed 2 is to be placed c. Type of culvert (construction material, style) CORRUGATED METAL PIPE d. Will proposed culvert replace an existing bridge? Yes _ _X_No If yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A Revised 03/95 . Form DCM-MP-5 (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? _XYes__No If yes, (1) Length of existing culvert 60' (2) Width of existing culvert 2(&, 60" (3) Height of the top of the existing culvert above the MHW or NWT 2.0' (4) Will all, or a part of, the existing culvert be removed? (Explain) YES f. Length of proposed culvert 60' g. Width of proposed culvert 2 (i 60" h. Height of the top of the proposed culvert above the MHW or NWL IS Will the proposed culvert affect existing water flow? Yes X No If yes, explain Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X _ _Yes No If yes, (1) Length of area to be excavated 60' (2) Width of area to be excavated 16' (3) Depth of area to be excavated 2.0' (4) Amount of material to be excavated in cubic yards 960 SQUARE FEET b. Will the placement of the proposed bridge or culvert require any excavation within: X Coastal Wetlands SAVs _Other Wetlands If yes, (1) Length of area to be excavated 5.66' (2) Width of area to be excavated 5.66' (3) Approximate area to be excavated Will the placement of the proposed bridge or culvert require any high ground excavation? X Yes No If yes, (1) Length of area to be excavated 40' (2) Width of area to be excavated 20' (3) Amount of material to be excavated in cubic yards 800 SQUARE FEET d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area Temporary spoil area is existing road bed (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. (4) Will the disposal area be available for future maintenance? X Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes _ No Open Water Impacts If yes, (1) Length of area to be filled 12.65' (2) Width of area to be filled 12.65' (3) Purpose of fill For Pipe Bedding and Cover 320 Sq. Ft. Open Water Impacts f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: N/A Coastal Wetlands SAVs Other Wetlands If yes, (1) Length of area to be filled _ (2) Width of area to be filled (3) Purpose of fill g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material Revised 03/95 .Form DCM-MP-S described in Item d. above) highground? _Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL to be placed on Signature a. Will the proposed project involve any mitigation? Yes No X If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical Bridge construction equipment g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? _ _Yes X No If yes, explain in detail NCDOT-Ca Pipe Re la went on SR 1 Applicant or Pr ject ame n Date 01/06/06 Revised 03/95 M � S��eO'��u JO siM Pa� alllon� a Q- a9 a m � `vr M TOod P2j Bj 4J O Old artwheel PoRY Hill Rd LL. o o _Y c9 �r 5 o _Z A 00 `n 9\eep� ani W (D U) h 0 0 ti � M r) Railroad Landing ,6 P8 siteJlg HARKER'S ISLAND USGS QUAD MAP - I � rn PROJECT � f Schae'L���� • at r O SR#1 345Mr • a�_� �� * •J -we R 1355 i� f � �a •-�Y _ .. � � S P� � t i :mot *t 'I Sleepy 1,700 850 0 1,700 Feet t' NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION II, BRIDGE MAINTENANCE NEW BERN, NC Julian M. Brown 770 Pigott Rd Gloucester, NC 28528 Deed Bk 0346 Deed Pg 00421 BRANCH OF SLEEPY CREEK I To r I co �< o I o Turbidity Curtain CLASS B RIPRAP \11 I-.. 16 1 AREA 5 I `k AREA I `� ,b' _ _ rl f IO' AREA 2 ----------------------- ------------------------------------ EXISTING 2 La 60" X 40, CM PIPES SR 1346------- PROPOSED 2 @ 60" X 50' CM PIPES David Jones 3533 Pinnacle Drive Cary, NC 27511 Deed Bk 0670 Deed Pg 00348 _`----------- TF (TOE OF FILL) s -------------------- __ -- - - SP (SHOULDER POINT) — — EP (EDGE OF PAVEMENT) EP (EDGE OF PAVEMENT) ------------------------------------ -- -------------------------7 - -- SP (SHOULDER POINT) — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — 3----- TF (TOE OF FILL) 4�l rJ James Parker AREA 4 10'\� AREA 3 Douglass Morris 803 Soundview Ave. AREA 6 385 Star Church Road Newport, NC 28570 CLASS B RIPRAP �� L — — — Marshallberg, NC 28553 Deed Bk 0494 �\� , I 16' ,y Deed Bk 0567 Deed Pg 00169 Deed Pg 00376 COASTAL WETLANDS IMPACT AREA I = 16 sq ft AREA 2 = 16 sq ft AREA 3 = 0 sq ft AREA 4 = 0 sq ft TOTAL AREA = 32 sq ft Turbidity Curtain +�—- e-.- OPEN WATER IMPACTS AREA 5 = 160 sq ft AREA 6 = 160 sq ft TOTAL AREA = 320 sq ft SCALE. I" = 20' I PROPOSED PIPE REPLACEMENT (N1-2040 nROJECT NUMBER.2B.201611 ROAD: SR 1346 COUNTY:CARTERET DATE:9-8-05 BY: BG LITTLETON, JR. (TT -V) DIVISION 11 BRIDGE MAINTENANCE EXISTING 2 (0 60" X 40' CM PIPES SR 1346 20' i 16' PROPOSED 2 2 60"X 50'CM PIPES SR 1346 EXCAVATION ABOVE NWL 40' X 20' = 800 SOFT. EXCAVATION BELOW NWL 60' X 16' = 960 SOFT. 0' 16' )n Bed Elevation DRAWING IS NOT TO SCALE SILT SASIN TYPE 'L' Im LEGEND SHEET DIFFUSE FLOW THROUGH WETLANDS vEGETaTED UPLANDS BEFORE ENTERING WETLANDS� I � Z w w SOIL DID" CONTROL LEGEND. TYPICAL EACH SHEET TEMPORARY ROCK SILT CHECK I > TYPE -A UPLANDS / Z w a yll SILT BASIN TYPE 8 I W Ow ya{t,�'- TFYPORARY ROCK SLT CHECK TYPE -A 0- w TEWPORART ROCK SILT 04ECK TYPE-8 O w w TE4PpUflT SILT FENCE SILT BASIN TYPE-B o GRADE BREAK 2 a U ow C I —il.- DN cnON OF FLOW I ------ WOODSLINE x =T: DIFFUSE FLOW DETAIL DIFFUSE FLOW TEMPORARY WUCK SILT CHECK TYPE 'B' DIITTC1�l " tN . �ED. OF PAVEMENT STSOCNML ATONE Iacmmrc Vler I' YIN. NATUTAL WANO CROSS SECTION VEi on N - LAA OF DITCH AArJftAL MND it, MIN. SILT TIRAMCIDAL ELEVATION VIEW NTS -------- 404 WETLANDS FILL AREA Ws a 30 _ -- INFUSE RIVER RIPARIAN BUFFER — 404 WETLANDS -- COASTAL WETLANDS GL GL ---- GRASS LNFA CHANNEL ----OPEN WATER IMPACTS ti SECTION I-O n•u•m.. u•w. r SECTION A -A •'W TEMPORARY ROCK SILT CHECK TYPE -A PROPOSED SILT FENCE WETLAND VAR.O'-G' EDGE OF EXIST. ROAD EXISTING FILL UTILITIES LEGEND, TYPICAL EACH SHEET POWER POLE i AG ID TELEPHONE PEDESTAL © CABLE TV PEDESTAL SEWER CLEAN OUT ® WATER VALVE FIRE HYDRANT 0 WATER METER EIPo EXISTING IRON PIPE + PROPERTY CORNER — IT-- PROPERTY LINE GRASS -LINED CHANNEL TRAPEZOIDAL DITCH SECTION Z-- X-SECTION AREA (A) - 8D +ZD TOP WIDTH (T1= 8 f 2DZ AREA TO BE m FILLED UNDISTURBED AREA DISTURBa SILT FENCE DETAIL NTS I PROPOSED SILT FENCE I VAR.0'-6' WETLAND EDGE OF EXIST. ROAD V VAI DIM. LEGEND SHEET SPECIAL SEDIMENT CONTROL FENCE 3 FT. CONTROL STONE MIN. 114 4 SEDIMENT CONTRO I FT. MIN. WATER FLOW -,\'�/ ttL rUSi - L' ri.ULLI- WOOD POST - 3 FT.DEEP GENERAL NOTES: USE NO.3 OR NO.57 STONE FOR SEDIMENT CONTROL AND PAY FOR AT THE CONTRACT UNIT PRICE PER TON SEDIMENT CONTROL STONE USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH %4 INCH MESH OPENINGS INSTALL 5 FT. SELF FASTENER ANGLE STEEL POST 2 FT.DEEP MINIMUM INSTALL 6 FT. LONG, 3 IN. DIA. WOOD POSTS 3 FT.DEEP MINIMUM SPACE POSTS A MAXIMUM OF 3 FT. TURBIDITY CURTAIN PUMP SILT BAG