Loading...
HomeMy WebLinkAbout19131_YOUNG, HENRY_19980402.n,!!f`."_.,,c`r-'«�{,�d.-�✓"h�t'�..,-,'"`sj�,:y-�i`"-".:�`.�`?�'F�4,:(,�-c.,�z-sAs. :. :x .:�--�,cc'-%_4. -� O CAMA AND DREDGE AND FILL alp GENERAL` APR 2 3 1998 PERMIT as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant fame ' "L k Phone Number—.`N-1 Address City �:CsfrC)s•:� Project Location (County, State Road, Water Body, etc.) V-'.5 Type of Project Activity �1 cr, hex _ M Q_', -y PROJECT DESCRIPTION SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other M fir. t L L V, % `e State ;4.. ---- C'DrV%�,RX\-u-�.it — _H s Zip L (SCALE: NDNi: ) This permit is subject to compliance with this application, site \ drawing and attached general and specific conditions. Any 1 of these terms may subject the permittee to a fine,/Al— violation– imprisonment or civil action; and may cause the permit to be- come e applicant's signature come null and void. _ � This permit must be on the project site and accessible to the permit officer's signature permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject ro \�; ject is consistent with the local land use plan and all local issuing date expiration date ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no –1 objections to the proposed work. attachments In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee Management Program. d I �- L f This permit is subject to compliance with this application, site \ drawing and attached general and specific conditions. Any 1 of these terms may subject the permittee to a fine,/Al— violation– imprisonment or civil action; and may cause the permit to be- come e applicant's signature come null and void. _ � This permit must be on the project site and accessible to the permit officer's signature permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject ro \�; ject is consistent with the local land use plan and all local issuing date expiration date ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no –1 objections to the proposed work. attachments In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee Management Program.