Loading...
HomeMy WebLinkAbout18960_PUNGO CK MARINA_19980310CAMA AND DREDGE AND FILL P GENERAL PERMIT APR 2 3 1998 as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name Address City Project Location (County, State Road, Water Body, etc. Type of Project Activity, PROJECT DESCRIPTION SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other State Phone Number Zip (SCALE: This permit is subject to compliance with this application, site r drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, r�/< ' imprisonment or civil action; and may cause the permit to be- applicant's signature come null and void. / r�77 This permit must be on the project site and accessible to the permit officer's signature permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. attachments _ In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee Management Program. issuing date expiration date Proposed changes to Property and Piers at Pungo Creek Marina: 1) East Pier a) Remove and rebuild as necessary. Current dimensions are approximately 128 feet long and 7 feet wide. ( old pier has 16 piles per side approximately 8 feet apart lengthwise and 7 feet wide) b) Use piles (marked blue) from west pier to build east pier. There are 24 piles to be used from west (8 additional 25 foot piles will be needed) 2) West Pier a) Relevel first 168 feet (yellow). Add cross braces to pilings at all piles across the width of the pier. Add cross braces every third set of piles alternating sides along the length of pier. Repair any broken stringers etc as necessary. b) Replace missing finger piers at the following places along the east side of the west pier: 1/2; 5/6; 15/16; 19/20; 23/24; and 25/26. (pink) (The first finger pier and pile are missing) c) Add 4 pilings at the end of the T one foot from pier. (Green) d) Add approximately 18 or 20 piles to the existing outboard piles on the west end of pier starting at the outboard end of the pier. (orange) 1e 43-15­ ZE1-,klA✓5,AJ,n/.c. 7 7QJo ��E✓7A�� may, E.C.u.R.D. E7/lEE�/i/iZL�,n/.G73/ 4:/,5TiNpoll 121 7 n7A /e �..� nE,.•o�E�� l l � s Eo Id I r L , sauNOcc✓J� peck. C J — y, s , ° ;, . i�Fz9s L�RouND �tE✓yj,c�IS /}A�.EST:„%11�!,. a � � Jtit (71 j t 50• OF 1 x I ® fa e Ex,57ivfj s jp 04' �75/,;e✓GA -/i�G10D0 FfJE /e p[4 I qoe ° i NOTE r ;� rt, DRAWINf� A, of z (tl,4 .SCALE%/ "' =Go• Q�So c .�.