Loading...
HomeMy WebLinkAbout40122_DAVENPORT, RONALD E_20050303�CAMA/ DREDGE & FILL /�—`��' ! c : 22 GENERAL PERMIT Previous permit # f -1New ❑Modification I '.Complete Reissue F]Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources �jj and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC i'I n • d �5 Do Applicant Name RDY)a Id E . Ay;!n nn,.- Address I ^ j= l C City He "4+ 04 State_rJC ZIP o Phone # (7-51)`J—d4 o i(o% Fax # ( ) Authorized Agent Affected ❑ CW 4W VIPTA _'I ES ❑ PTS AEC(s): CI OEA ❑ HHF ❑ IH -i UBA ❑ N/A 01 PWS: ❑ FQ ORW: yes / no,, PNA yes / iio; Crit. Hab. yes /.,no' Project Location: County RKJ.(, Street Address/ State Road/ Lot #(s) (B �n `- Subdivision rpo j jn q 151p r+l City- H(-,-i fi-Yck' _ ZIP Phone # (�) >(�( River Basin F05(U +OT'Ji ik Adj. Wtr. Body r1; ✓ (nat /fiiar�D/unkn) Closest Maj. Wtr. Body Al be fn ai P A in el Type of Project/ Activity :.cv�� v_f[ i,�aaa t �u ✓, (Scale: NT S ) Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp L U Boathouse/ Boatlift Beach Bulldozir Other 5 OWL. L �; Shoreline Length SAM not sure yes — ^` - ------ -- Sandbags: not sure yes7 0 Moratorium: /a yes no �v Photos: es no Waiver Attached: yesQi /s� A building permit may be required by: �; 'r,� ,, �,v S a vt n 4 .d C' See note on back regarding River Basin rules. Notes/ S I p ecial Conditions �s/��;`�.d��%� /n/, w�(e!/� ��G� �.Sl/��v�.,fl' in&�I/ 0�laf r'xr4_T .✓ ' N�`• lJ�f`.I!'/� �'rY�.on /w.<A� �r/' ..-/N/:J AI-J�r/'/_rZ Agent or Applicant Printed Name Signature "Please read compliance statement on back of permit" i Application Fee(s) Check # -ermit Officer's Signature Issuing Date Expiration Date rl "a « 4., n A ' COV .. � �i 1 11 d A Local Planning)urisdiction Li` 'Ro erFile a e Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888ARCOAST Fax:919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax:910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) www.nccoastalmanagement.net Revised 10/05/01 �� coascu� z North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary 6 February 2005 Mr. Larry Windley 3085 E. Greenville Blvd. Greenville, NC 27858 Re: Calvin B. Davis Maintenance Excavation Dear Mr. Windley: MGVBN6�1 C)CM The Division of Coastal Management has reviewed your 18 December 2004 correspondence objecting to the above referenced project. The maintenance excavation as proposed is consistent with North Carolina Administrative Code 071-17H1500 (see attached) and the appropriate rules and regulations of the Division. Therefore, on 3 February 2005, Steven J. Trowell, a member of my staff, issued General Permit No.GPB-40666, authorizing the aforementioned project (copy of permit attached). If you wish to appeal this permit decision, you may file a request with the Director of the Division of Coastal Management, Department of Environment and Natural Resources within twenty (20) days of the permit decision. If you have any questions regarding this matter, please do not hesitate to contact me at (252) 946-6481. Sincerely, - 'Z i �IF: � e -- Terry E. Moore District Manager Division of Coastal Management Washington Regional Office attachments c: \, Ted Tyndall - Assistant Director, DCM 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 1 FAX: 252-948-0478 1 Intemet: www.nccoastalmanagement.neV North Carolina �Vawwlly An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper