HomeMy WebLinkAbout40018_BHP ASSOC_20041005_i CAMA DREDGE & FILL _ir 1.8
OENdhAL PERMIT
Previous permit #
❑New ❑Modification CComplete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
�Q N r� r ❑Rules attached.
Applicant Name l Aso e e ' ` 4Project Location: County _ _
Address �Y y Orr ? '� °� ��` ' Street Address/ State Road/ Lot #(s)
City P-0 1 �' State ✓C_ ZIP —76
Phone # ( # () Subdivision -
Authorized Agent City _ �! ' ` _ ZIP
CW EW N-PTA ��ES ❑PTS Phone # ( ) River Basin
Affected - OEA HHF El UBA N/A !
AEC(s): _, PWS: -:FC: Adj. Wtr. Body /- ' ' (i at )/man /unkn)
ORW: yes / no PNA yes / no Crit. Hab. yes / no
Closest Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/(Riprap length
avg distance offshore -�
max distance offshore '� r
Basin, channel
-- ra
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length U J 0
SAv: of sur yes no - -- --
Sandbags: not sure yes �no
Moratorium: n/a yes Gg
Photos: yes t ny
Waiver Attached: yes nn3
A building permit may be required by:
Notes/ Special Conditions
Agent or Applicant Printed Name
Signature Please read compliance statement on back of permit **
l.�
Application Fee(s) Check #
(Scale:
P' See note on back regarding River Basin rules.
Permit Officer's Signature
Issuing Date Expiration Date
Local Planning jurisdiction Rover File Name
11114 4f
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules _ f Other:
Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax:919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax:910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastalmanagement.net
Revised IO/OS/0I
AdSHP ASSOCIATES
5924 WILD ORCHID TRAIL
RALEIGH, NC 27613
PAY
TO THE �1C-1h `MZ
ORDER OF
DATE 6�
�C1
Bank of America,.
ACH R/T 053000196
FOR
1160 0 31,110 l:0 5 3000 1961I: 0006 9008 38 1911'
1034
66-19/530 NC
426
A R S 6 � v-L
t
Y Zia
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary
October 5, 2004
BHP Associates
Pecan Grove Marina
Attn: Lee Cox
685 Oriental Road
Oriental, N.C. 28571
Dear Mr. Cox:
Attached is General Permit 940018-C to install rip rap at 689 Oriental Rd., Oriental, North Carolina.
In order to validate this permit, please sign all three (3) copies as indicated. Retain the white copy for your
files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the
signed permit copies are not returned to this office before the initiation of development, you will be working
without authorization and will be subject to a Notice of Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sincerely,
Stephen Lane
Coastal Management Representative
SL/rcb
Enclosures
151-B Hwy. 24, Hestron Plaza 11, Pvlorehead City, North Carolina 28557
Phone: 252-808-28081 FAX; 252-247-33301 Internet: www.nccoastalmanagemeni.net
An Equal opportunity 1 Affirmative Adion Employer- K Recycled 110% Pcst Cocs.^ner Pape.
FROM FAX NO. :9198475554 Oct. 01 2004 08:20AM P1
BHP Associates
5924 Wild Orchard Trail • Raleigh, NC 27613
fi � _ f -- 6 `f
"'-f—o' : s4e�� e'v" � 4;--,
o-WII) W-S
s
A40
ADJACMr RVARM PROinT Y OVA STjk UMT
h� ..s� f•..�s1f• sr.:: sl_/� �� !_..i1 �_t,-jit:rsll :. t
- 'f{ i• �- ti � 7
C
MMONAFM
rr4l Fill
H% hay de=*W ID Me= dmn below, the &"Wpm=ut he is-puapasing at &a b=6012,
DAMWOR DRAWING OF PROPOSED DEVEEA MENT
(Te +fie. HW is by h du of pmpumbzg deve�O r j
e4l
Sigma
Sigss�n'e
�A,1
Pfint ,CT Type Name
Tekphooe Nwnbw
Datm �/z / /U Y`
FROM
FAX NO. :9198475554 Oct. 01 2004 08:21AM P2
I her ccr* & d I o m piopeM a #scot io E "P go-ssczt as
"m of prow4y opuso
IaCaiC� at ,�•����� J t�'�Y�.� 1�x I i� (,��) � /UIiG A b / f�
(I.et, Bio* l 004 etc-)) /
onJ�--� , 3t1 a�,,'� ! 1 O C� N.C.
cw a (rOVU'wdloar QUO)
He has desbed 6a ax as shown below, the de►dapst m k is PmPo®ag at du t;ox2dQu,
and, I hve m objecdaas to kb PWPOSRL
DESCRIPTION ANNOR DRAWING OF MOPOSID DEVEWPMENT
(Tv Ise jKd is by Ladbidad pri posing
J
Sigtsai=
6ACL y"
Print or Type N2=
Telep Numbm
Date : 7--Zb�—o Y
1, HEP, BER T J. M08L ES, JR. , CER T I F Y THA T TH I S
`
PLAT IS OF A SURVEY OF AN
EXISTING P-IRCEL OF
L AND.
(BASE FLOOD ELEVATION 8 )
AS SHOWN ON
HUDZF I A MAP 370279 0001 B,
DATED DEC. 4, 1985
DEED REFERENCE: DEED F
r
DEED BOOK
244 PAGE 300.
OPOSED CONSTRUCTION ENTRANCE
TYP I CAL ROAD SECT I CN
J'I J, I ,• r i ,
CRECA 7E B
RE
oSIDE SLOPE OF SWELLS NOT GREATER T! AN 3: 1
PROPOSED CONSTRUCTION ENTf
AL,NG EXISTING SOIL FARM
O �
PROPOSED CONSTRUCTION ENTRANCE
SEE TYPICAL SECTION -
SvrVe7