HomeMy WebLinkAbout40744_B & C LAND COMPANY_20050105I •'Q0&MA / G DREDGE & FILL
GENERAL PERMIT
❑New ❑Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
A76 40,1
;oaf
Previous permit #
Date previous permit issued
Applicant Name Project Location: County
AddressI Street Address/ State Road/ Lot #(s)
City
State ''
ZIP
Phone # ( )
�� } Fax # ( )
Subdivision
Authorized Agent
City
Affected L-' Cw
[�-EW H12TA ❑ ES
❑ PTS
Phone # ( )
[ 1 OEA
AEC(s):
ElHHF ElIH ❑ UBA
El N/A
Adj. Wtr. Body
PWS:
❑FC:
ORW: yes / no
PNA yes / no Crit. Hab. yes / no
Closest Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length_
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length
SAV: not sure yes no
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by:
Notes/ Special Conditions
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit
(] Rules attached.
ZIP
River Basin
/man_ /unkn)
(Scale: )
See note on back regarding River Basin rules.
rmit Officer's Signature
Issuing Date Expiration Date
r
Application Fee(s) Check #
Local Planning) urisdiction
Rover File Name
t
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules _', Other:
Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax:919-733-1495
Elizabeth Citv District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax:910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastalmanagement.net
Revised 10/05/01
ALLSTAR SEAMLESS GUTTERS
PO BOX 1054
ORIENTAL, NC 28571
I-`," "- ,--4112
l/ 66-152/531
DATE
W2 CHOVU
Wachovia Bank, N.A. PH:252-249-3781
%ybom, NC 29515
l:0 5 3 LO L 5 2 91: 0 78 4 OO L 38 5u■ L L 1 2-
NDJACEN7 RIPARIAN, PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to 0 s M CA C�2PSSwp 5
Game of Prop wrier)
property located at �L ► p �. � � , ,� �..�.e�..�J
tr.,oa, MGM, [goads etc.) On �cc. CQ--9e t
--- :� ff 1- �J C CPO rv\ l ICO CU� , N.C.
(Town and/orCounty)
lie has described to me as shaAr below, the de�-eiopment he is proposing at that location,
qJ7W/Crrt A
and, - al-fi4 ob---•- -
z. ,—e
--C l�l --- a ►---vim cwtlogt_....-_
DESCRIPTION ANIXOR DRAW' OF PROPOSED DEVELORMENT
(To befilled in by indAidval propast rg development) Lam)
S L R P A C C.v -I-1h4
+ C ct 4ZtP& C4'Sg
IL
LI t V Pl-u �V s--r S L c 1P j--
----- - =r- , -
------ - ---- --- ---- -- --- -----------------------
Signature
744-1
Print or Type Nzl--me
fits s31 fit-(-%
elephone Number
Date: ��`^,� �� � 2_C1 V e"I
V]
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
hereby certify that I own property adjacent to
(Name of Property weer) ��tv r 5 qe-44-S"7)
property located at -SL t p ZL ck �, n Ciu.e�
(Lot, Block, Road, etc.)
on _� P 9ein �rr 1R1 C. P(,� nn fCo ��� , N.C.
(`Vaterbody) (Town and/or County)
He has described to me as shown below, the development he is proposing at that location,
and, I have no objections to his proposa?_
N
DESCRIPTION ANVOR DRA`V M OF PROPOSED DEVELOPMEN
(To be filled in by Individual proposing development)
Aa-1-4
--
;L� P �}v Accvmn�.
a
0-
l�
4-ap
4- C l cce%9
�f fCCPSC t by
(�L4-
Signature
JeS�c,-
Print or Type Name
Telephone Number
Date: ____ - � - /°Y -
'Finger Pier Extension: Slip 2, Cabin Creek
Bill & Cathy Cresswell
(410) 598-6457
Dear Bob,
It was good to see you on Saturday. Thanks for your help.
As we discussed, our drawings and explanation are provided.
1. Preserve full height of all pilings. Do not cut off at finger
pier level.
2. Extend finger pier decking to mid -point of pilings, cutting
the contour of the pier around the pilings as needed.
3. Do not alter the contour of the existing slip 3 side of the
finger pier.
4. Relocate the electric service on the slip 3 side to the slip 1
side. Electric service will ultimately be combined in a
single tower on the slip 1 side.
5. Relocate the slip 3 side water faucet out of the immediate
path of the new finger pier.
Again, we appreciate all of your help.
Bill & Cathy
PS: We've included separate copies of the slip 2 modifications
for CAMA and for the pile driving company.
J.mpt'ove�ne v1t5 SLtQ -*2
® Cabt n Ci-ee,V,
. 1
�s 11 Co-4v%a Coess weLL
BLAcku CiCISTO"Co