HomeMy WebLinkAbout22312_FLYNN, TOM_19990519CAMA AND DREDGE AND FILL
GENERAL N? 2'f'-! 312
PERMIT '
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and tl ,e Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC r j
Applicant Name Phone Number � � �(
Address
City "' `.r1r State Zip
Project Location (County, State Road, Water Body, etc.)
1
Type of Project Activity
1,
PROJECT DESCRIPTION
SKETCH .
��
>1 i
(SCALE:
' Y/-
Pier (dock) length
4
t14
�. �'
Groirrleng h
(•,� y
�, '�
++
number
Bulkhead length
)�
max. distance offshore
Basin, channel dimensions
cubic yards
Cd-
Boat ramp dimensions
Other
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
J;•' .� applicant's signature
permit officer's signature
E e7 f% r
issuing date expiration date
attachments `l i; t. 7 /4 1 � (! l
In issuing this permit the State of North Carolina certifies that
y; this project is consistent with the North Carolina Coastal application fee
Management Program.
(_cJJ
MIKE NOE CONSTRUCTION
PH 919-728-3828
PO BOX 586
BEAUFORT, NC 28516
pail to fllr
Wrlrr 11t
0882
9�- 7 66-1521531
/ G ullaro s,c�,ll,
�n���dea.
Delalls on Cack.
Wachovia Bank, N.A.
Newdort, NC 28516
i:053LOL5291: 546L L97LLiLPOa
10/ 27/ 1 y97 11: 53 91946047'-17
vN4 OF NC
IV/27/1997 14;41 9197283828 NOEOHOLLAND PAGE 02
"JACENT RIPARIAN PROPERTY O"VA141 t STATE31ENT
(FOR A PIENIM00MG PILINGS/80AMIPT1B0ATH0USri)
I hereby certify that I own property adjacent to Ivy q- 4, /p/ *A/ l S
(Name of Property Owner)
property located at
> 1--- --- /.�- --- So
(Lot, Block,
on -f 0,�,
�N. C.
vF x C , ,
(w terbody) (Town an&or County)
He has described to roe, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal_ I understand that a pier/mooring
pilings/boatliftlboathouse must be set back a minimum distance of fifteen feet (151) from my area
Of riparian access unless waived by me.
I din not wish to waive the setback requirement.
I Sao wish to waive that setback requirement.
-----------------
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOnIENT:
a (To beflled in by Individual pmposing development)
312 ,, ,
� I g- a5?s
iZ
Print or Type Name
ttIJ8
9/9-?Z-V-zrsr3
Telephone Number
Dates '1 ► S'
��� -
�,�_ �..�
r��
�.:
M • EAR - CO -VS T4L hI i V-I(-C111EA-T
.1200
SECTION .1200 - GENERAL PERMIT FOR CONSTRUCTION OF PIERS: DOCKS: AND
BOAT HOUSES IN ESTUARINE AND PUBLIC TRUST WATERS
.1201 PURPOSE
This permit will allow the construction of new piers, docks, and boat houses in the estuarine and public trust waters
4ECs and construction of new piers and docks within costal wetlands AECs according to the authority provided in
Subchapter 7J .1100 and according to the following guidelines. This permit will not apply to the Ocean Hazard AEC.
History Note: Aurhorit)• G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124; `
EIj: March 1, 1964.
•1202 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting
approval for development The applicant shall provide information on site location, dimensions of the project area, an
d
his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice shall instruct adjacent properry owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management
within 10 days of receipt of the notice, and, indicate that no response will be interpreted as no objection.
DCM staff shall review all comments and determine, based on their repotential impacts of the
relevance to the
proposed project, if the proposed project can be approved by a General Permit If DCM staff finds that the
comments are worthy of more in-depth review, the applicant shall be notified that he must submit an
application for a major development permit
(c) Approval of individual projects shall be acknowledged in writing by the Division of Coastal Management and
the applicant shall be provided a copy of this Section. `
(d) Construction must be completed within 90 days of the approval of the permit or the permit expires. V (e) Any modification or addition to the approved project shall require prior approval from the Division of Coastal
Management
Histor)' Note: Aurhority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Elf August 1, 1998; January 1, 1990.
.1203 PERMIT FEE
The applicant must pay a permit fee of fifty dollars (S50.00) by check or money order payable to the Department
History Note: Authority G.S. 113A-107(a); 113A-107(b), 113A-113(b); 113A-118.1; 113A-119; 113A-124,
Eff. March 1, 1984;
Amended Eff. March 1, 1991.
.1204 GENERAL CONDITIONS
(a) Piers authorized by this general permit shall be for the exclusive use of the land owner, or occupant and shall not
provide either Ieased or rented docking space or any other commercial services. Piers designed to provide docking space
for more than two boats shall, be of their Beater potential for adverse impacts, be reviewed through the major
permitting process and, therefore, are not authorized by this general permit
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to
make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under the
authority of this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no unreasonable interference with navigation or use of the waters by the public by the existence
of piers, docks and boat houses.
(d) This permit will not be applicable to proposed construction where the Department believes that the proposed
activity might unnecessarily endanger adjoining properties; significantly affect historic, cultural, scenic, conservation
or reCreadon values, identified in G.S. 113A-102 and G.S. I I3A-I 13(b)(4), nor that might significantly affect the quality
ENR - COASTAL M.4NAGE:i1EA7
T15.4: 07H .I200
of the human environment.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements, .AEC Guidelines, and
local land use plans current at the time of authorization.
History Note: Authority G.S. 113.4-107(a); 113A-107(b); 113A-113(b); 113A-1is. 1; 113A-124;
Eff. March 1, 1984;
Amended Eff. May 1, 1990;
RRC Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August 1, 1998; July], 1994.
.1205 SPECIFIC CONDITIONS
(a) Piers, docks, and boat houses may extend or be located up to a maximum of 400 feet from the normal high water
line, or the normal water level, whichever is applicable.
(b) Piers, docks, and boat houses shall not extend beyond the established pier length along the same shoreline for
similar use. This restriction shall not apply to piers 100 feet or less in length unless necessary to avoid unreasonable
interference with navigation or other uses of the waters by the public. The Iength of piers shall be measured from the
waterward edge of any wetlands that border the water body.
(c) Piers longer than 200 feet shall be permitted only if the proposed length gives access to deeper water at a rate of
at least one foot at each 100 foot increment of pier length longer than 200 feet, or if the additional length is necessary
to span some obstruction to navigation. Measuremeas to determine pier lengths shall be made from the waterward edge
of any coastal wetland vegetation which borders the water body. -
(d) Piers and docks shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland
substrate as measured from the bottom of the decking.
(e) Any portion of a pier (either fixed or floating) extending from the main structure and six feet or less in width shall
be considered either a "T" or a finger pier.
(f) Any portion of a pier (either fixed or floating) greater than six feet wide shall be considered a platform or deck.
(g) "T"s, finger piers, platforms, and decks of piers on lots with shorelines 100 feet or greater in length shall not
exceed a combined total area of 400 square feet. The combined total area for lots less than 100 feet shall not exceed
four square feet per linear foot of shoreline.
(h) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands.
(i) Boathouses shall not exceed 400 square feet and shall have sides extending no further than one-half the height
of the walls and only covering the top half of the walls. Measurements of square footage shall be taken of the greatest
exterior dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline.
U) Areas enclosed by boat lifts shall not exceed 400 square feet.
(k) Piers, docks, decks, platforms and boat houses shall be single story. They may be roofed but shall not be designed
to allow second story use.
(1) Pier alignments along federally maintained channels must also meet Corps of Engineers regulations for pier
construction pursuant to Section 10 of the Rivers and Harbors Act
(m) Piers, docks, and boat houses shall in no case extend more than 114 the width of a natural water body, human -
made canal or basin. Measurements to determine widths of the water body, human -made canals or basins shall be made
from the waterward edge of any coastal wetland vegetation which borders the water body. The 1/4 length limitation shaII
not apply when the proposed pier is located between longer piers within 200 feet of the applicant's property. However,
the proposed pier shall not be longeren
than the pier head line established by the adjact piers, nor, longer than 113 the
width of the water body.
(n) Piers, docks and boat houses shall not interfere with the access to any riparian property, and shall have a minimum
setback of 15 feet between any part of the pier and the adjacent property lines extended into the water at the points that
they intersect the shoreline. The minimum setbacks provided in the rule may be waived by the written agreement of the
adjacent riparian owner(s), or when'two adjoining riparian owners are co -applicants. Should the adjacentproperty be
sold before construction of the pier commences, the applicant shall obtain a written agreement with the new owner
waiving the minimum setback and submit it to the Division of Coastal Management prior to initiating any development
of the pier, dock, or boat house. The line of division of areas of riparian access shall be established by drawing a line
along the channel or deep water in front of the property, then drawing a Iine perpendicular to the Iine of the channel so
that it intersects with the shore at the point the upland property line meets the water's edge. Application of this Rule
may be aided by reference to the approved diagram in Paragraph (q) of this Rule illustrating the rule as applied to
various shoreline configurations. Copies of the diagram may be obtained from the Division of Coastal Management
When shoreline configuration is such that a perpendicular alignment cannot be achieved, the pier shall be aligned to
meet the intent of this Rule to the maximum extent practicable.
NORTH C.4ROU.�'4 .4r).1r1 �'I.STA,.? TTVF COP1^ 0R/?7�pR
ENR - COASTAL A14>\:4 GE.AfEATT
T15.4: 07H :1300
(o) Pigs, and mooring faciiiues shall be designed to provide dockincy space for no more han two boas.
(P)-4Pplicants for authori✓a6on to construct a dock or pier shall provide notice of the pe;,,lit application to the owner
of any part of a shellfish franchise or lease Over which the proposed dock or pier would extend. The applicant shall
allow t:^.� lease holder the opportunity to mark a navigation route from the pier to the edge of the Itst.
(q) Tne dia-am shown below illustrates the various shoreline contigurations. V V
'AR1AN ACCESS AREAS
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b), 113A-118.1; 113.4-124;
Eff. March 1, 1984;
Amended Ef. December 1, 1991; May 1, 1990; March 1, 1990;
RRC Objection due to ambiguity Ef March 18, 1993;
Amended Ef. August 1, 1998; April 23, 1993.