HomeMy WebLinkAbout21910_TOWN OF EDETON_19990621CAMA AND DREDGE AND FILL
GENERAL N? 2 L
PERMIT c F s
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources andhgr'�a I Resources Commission
in an area of environmental concern pursuant to 15A NCAC ff��f (5
Applicant Name t UW � u� Phone Number ` �2 ^ 7,3
Address P �, �� :LO
City � 1VL Z_ Gq State - Zip
Project Location (County, State�Road, Water Body, etc.)
Type of Project Activity '_`'"r \t IL A li' .
PROJECT DESCRIPTION
Pier (dock) length
Groin length
numDer
Bulkhead length -
max. distance offshore —'
Basin, cnannel dimensions
cubic yards
Boat ramp dimensions
Other
SKETCH F` [� �s 5 (SCALE:
2 �� � y� <r Lv,�/ram; G'► � - � `� 6� n
.
151
This permit is subject to compliance with this application, site I
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee- to a fine, ,. v \
imprisonment or civil action; and may cause the permit to be- 1
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
' v
issuing date -
attachments —74 (!/vv }
applicant's signature
permit officer's signature
expiration date
application feelr?z4--
��C-
W/W cam-,
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
J
PERMIT COMPLIANCE MONITORING REPORT
Project / Permittee Name: Town of Edenton County :Tn of Edenton
Permit Number: 021910A Expiration Date : Sept 19 , 1999
Location : Albemarle Sound
Division Representative: DWH
Project Representatives Present : none
Type of Approved Project Activity : Bulkhead
Date of Inspection : Sept 24, 1999
Progress to Date : Materials on site but construction has not begun
Permit Condition(s) Non -Compliance : None
Corrective Action(s) Required : See comments below
Comments : Send courtesy letter advising that project completion will require
another permit be issued. Send copy to Paul Waff