Loading...
HomeMy WebLinkAbout21910_TOWN OF EDETON_19990621CAMA AND DREDGE AND FILL GENERAL N? 2 L PERMIT c F s as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources andhgr'�a I Resources Commission in an area of environmental concern pursuant to 15A NCAC ff��f (5 Applicant Name t UW � u� Phone Number ` �2 ^ 7,3 Address P �, �� :LO City � 1VL Z_ Gq State - Zip Project Location (County, State�Road, Water Body, etc.) Type of Project Activity '_`'"r \t IL A li' . PROJECT DESCRIPTION Pier (dock) length Groin length numDer Bulkhead length - max. distance offshore —' Basin, cnannel dimensions cubic yards Boat ramp dimensions Other SKETCH F` [� �s 5 (SCALE: 2 �� � y� <r Lv,�/ram; G'► � - � `� 6� n . 151 This permit is subject to compliance with this application, site I drawing and attached general and specific conditions. Any violation of these terms may subject the permittee- to a fine, ,. v \ imprisonment or civil action; and may cause the permit to be- 1 come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. ' v issuing date - attachments —74 (!/vv } applicant's signature permit officer's signature expiration date application feelr?z4-- ��C- W/W cam-, In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. J PERMIT COMPLIANCE MONITORING REPORT Project / Permittee Name: Town of Edenton County :Tn of Edenton Permit Number: 021910A Expiration Date : Sept 19 , 1999 Location : Albemarle Sound Division Representative: DWH Project Representatives Present : none Type of Approved Project Activity : Bulkhead Date of Inspection : Sept 24, 1999 Progress to Date : Materials on site but construction has not begun Permit Condition(s) Non -Compliance : None Corrective Action(s) Required : See comments below Comments : Send courtesy letter advising that project completion will require another permit be issued. Send copy to Paul Waff