Loading...
HomeMy WebLinkAbout22309_BOCK, PAUL_19990512oe7 C,C/ 'I CAMA AND DREDGE AND FILL GENERAL M 2309 L� �L l _ail PERMIT as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name Address City Project Location (County, State Road, Water Body, etc.) Type of Project Activity r . State _ Phone Number_ Zip PROJECT DESCRIPTION SKETCH ;{ /S (SCALE: Pier (dock) length I' Groin length number Bulkhead length max. distance offshore.' Basin, channel dimensions 1 t ) f cubic yards Boat ramp dimensions �f Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. issuing date f/ attachments ,' application fee applicant's signature permit officer's signature expiration date T- OUTER BANKS MARINE CONSTRUCTION BB&T 3934 P.O. BOX 1988 BRANCH BANKING AND TRUST COMPANY ATLANTIC BEACH, NC 28512 MOREHEAD CITY, NC 28557 66-112/531 (919) 240-2525 5/9/99 PAY TO THE D E H N R $ * * 100.00 ORDER OF One Hundred and 00/100*****************' *****"``********************************* DOLLARS n L% Security features D.E.H.N.R. MEMO Paul Bock ------ David "A -- 11100393411s 1:053LOLL20:L23L0L52951' 99 05/06 08:40 $ 919 676 2454 BOCK CONST. CO. 02 9192402525_ OBMC TIM GRIMES $42 P01 APR 28 199 20:23 (FOR A PLMMOORiNGi PA NGSBOATU MBOATHOUSB) I herby =tify that I own property adja=t to B (NxAt of PropertY Owper) pxoputy located at, eS ! " 1 , RoJe W aot, Block, hood, etc.) on d1. �. in —,. ,- - , N.C. (Waterbody) gown and/or Couuty) He has described to Inc, ss shown below, the development he is proposing at that kcadon, and, I have no objections to his proposal. I understand that a pierlmooring pilings/boatlift/boathousa must be set back a minimum distance of ti n feet (15') from my area of dparhm access unless waived by axe. ')O4C 6 7 I dg ad wish to waive the setback requirement. I dQ wish to waive that setback requirement. DE,SCR'1 MON AND/OR DRAWING OF PROPOSED DEVELOPMENT: 11 (To be fiW in by in4Odad pmgposing development) i tw...I- .W SW AW 644W, 464Ui Telephone Number Date: 199 05/06 08c40 $ 919 676 2454 BOCK CONST. CO. 01 9192402525 OBMC TIM GRIMES 842 P01 APR 28 '99 20:23 _ (FOR A PnWUOORING PILN01"An"F (BOATHOUSE) I hareby cmtfy that I own property adja=t to i is C42M o property O�duer� Jro a^-- desk, Roads m.rk,� N.C. vrt � (Wdarbody) — {Tavnn and/or Cowoty} He has described to me, as shown below, the development he is proposing at that location, 2,4 1 have no objections to his pmpowl. I understand that a pierlmooring pilin oatliftlboathvusa mast be sa back a mmimum distance of Hft= fat (15') from my area of dpow accoas w 1m waived by axe. I d nQt wish to waive the setback requirement. I d2 wish to waive that seta, a requirement. DE'.SC ON AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To bc,fiiW in by is Wuarl pmposMg development} E 141W C wfurf &Vf ram% Path &9v /-'J4 - ./ Loc, lv� ��� ►u� print or Type Name j�em, T 190424+ f-jr Telephone Number Diu: