HomeMy WebLinkAbout22309_BOCK, PAUL_19990512oe7 C,C/ 'I
CAMA AND DREDGE AND FILL
GENERAL M 2309 L�
�L l _ail
PERMIT
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC
Applicant Name
Address
City
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
r .
State _
Phone Number_
Zip
PROJECT DESCRIPTION SKETCH ;{ /S (SCALE:
Pier (dock) length
I'
Groin length
number
Bulkhead length
max. distance offshore.'
Basin, channel dimensions 1 t ) f
cubic yards
Boat ramp dimensions
�f
Other
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
issuing date
f/
attachments ,'
application fee
applicant's signature
permit officer's signature
expiration date
T-
OUTER BANKS MARINE CONSTRUCTION BB&T 3934
P.O. BOX 1988 BRANCH BANKING AND TRUST COMPANY
ATLANTIC BEACH, NC 28512 MOREHEAD CITY, NC 28557
66-112/531
(919) 240-2525
5/9/99
PAY TO THE D E H N R $ * * 100.00
ORDER OF
One Hundred and 00/100*****************' *****"``********************************* DOLLARS
n L% Security features
D.E.H.N.R.
MEMO
Paul Bock ------ David "A
--
11100393411s 1:053LOLL20:L23L0L52951'
99 05/06 08:40 $ 919 676 2454 BOCK CONST. CO. 02
9192402525_ OBMC TIM GRIMES $42 P01 APR 28 199 20:23
(FOR A PLMMOORiNGi PA NGSBOATU MBOATHOUSB)
I herby =tify that I own property adja=t to B
(NxAt of PropertY Owper)
pxoputy located at, eS ! " 1 , RoJe W
aot, Block, hood, etc.)
on d1. �. in —,. ,- - , N.C.
(Waterbody) gown and/or Couuty)
He has described to Inc, ss shown below, the development he is proposing at that
kcadon, and, I have no objections to his proposal. I understand that a pierlmooring
pilings/boatlift/boathousa must be set back a minimum distance of ti n feet (15') from my area
of dparhm access unless waived by axe.
')O4C 6 7
I dg ad wish to waive the setback requirement.
I dQ wish to waive that setback requirement.
DE,SCR'1 MON AND/OR DRAWING OF PROPOSED DEVELOPMENT:
11 (To be fiW in by in4Odad pmgposing development)
i tw...I-
.W SW AW 644W, 464Ui
Telephone Number
Date:
199 05/06 08c40 $ 919 676 2454 BOCK CONST. CO. 01
9192402525 OBMC TIM GRIMES 842 P01 APR 28 '99 20:23
_ (FOR A PnWUOORING PILN01"An"F (BOATHOUSE)
I hareby cmtfy that I own property adja=t to i is
C42M o property O�duer�
Jro
a^-- desk, Roads
m.rk,� N.C.
vrt �
(Wdarbody) —
{Tavnn and/or Cowoty}
He has described to me, as shown below, the development he is proposing at that
location, 2,4 1 have no objections to his pmpowl. I understand that a pierlmooring
pilin oatliftlboathvusa mast be sa back a mmimum distance of Hft= fat (15') from my area
of dpow accoas w 1m waived by axe.
I d nQt wish to waive the setback requirement.
I d2 wish to waive that seta, a requirement.
DE'.SC ON AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To bc,fiiW in by is Wuarl pmposMg development}
E
141W
C wfurf
&Vf ram%
Path &9v /-'J4 - ./
Loc, lv� ��� ►u�
print or Type Name
j�em, T 190424+ f-jr Telephone Number
Diu: