HomeMy WebLinkAbout21905_ALBEMARLE DEVELOPERS INC_19990616CAMA AND DREDGE AND FILL
GENERAL .11 2��.�
-1�
PERMIT JUN 2 5 1C 4 , �
09
^ as authorized by the State of North Carolina
i►✓��y Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC
Applicant Name
Ll.�f,'VZ', L(:' 1-) l'i<- i c j-i !'' Phone Number
Address `' I • %`�'' -70
City
r VJ C 7 ��
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
_ State
Zip
PROJECT DESCRIPTION SKETCH !rr ILt; S (SCALE: )
Pier (dock) length
Groin length
number y�
Bulkhead length
max. distance offshore / —ri'LAc�r_ Ill X i S I o\iL—
►31tifCt
Basin, channel dimensions , � i%IQ--1 `'AJ7 AXJ0 C)LI C `'-'"
w�� �
cubic yards �_L
Boat ramp dimensions 'P��21t►:i ��f�,. G� ; --
0the
� �y r� ' r41�t1 (,rac lI
y .
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
applicant's signature
permit officer's signature
i/ss/ui'n�g%date expiration date
attachments
application fee
J
October 1, 1999
Mr. Tilden Whitehurst CAMA r4L
0 4 1999
Rt. 4, Box 870 '
Hertford, NC 27944 EHMANAGEMENT
Re: General Permit No. 02 (905, Swain Park
Dear Mr. Whitehurst :
This letter is in reference to your CAMA General Permit which was issued on June 16, 1999.
This permit authorized the construction and/or placement of a bulkhead and rip rap along the
shoreline of property located at Swain Park, Little River Shores within the waters of the Little
River in Perquimans County.
On September 20, 1999 a site visit was conducted at this site to determine and confirm that your
project was completed in accordance with the Specific Conditions concerning bulkhead and rip
rap shoreline stabilization structures as referenced in Subchapter 7H .1100 of the North Carolina
Administrative Code and the Coastal Area Management Act. During this inspection, it became
apparent that you have not completed all the work proposed and previously authorized under the
above referenced General Permit. As a courtesy, I wish to remind you that CAMA Permit
021904A expired on September 14, 1999. Since the remaining work falls within the permit
jurisdictional areas defined as Estuarine Waters and/or Public Trust Area, as described in
Subchapter 7H .0206 and .0207 respectively, of the North Carolina Administrative Code, a permit
/ or other necessary authorization will be required from this Division prior to the completion of
this project as originally approved in CAMA General Permit 021904A.
Than you for your time and cooperation in regard to this / these matter(s). If you have any
questions, please feel free to contact me at (252) 264-3901.
Sincerely,
Dennis W. Hawthorn
Coastal Management Representative
cc: -Xharles S. Jones, Assistant Director, DCM
Doug Huggett, Permits Coordinator, DCM
Raleigh Bland, USCOE
North Carolina Department of Environment and Natural Resources James B. Hunt jr., Governor • Wayne McDevitt, Secretary
Division of Coastal Management Donna D. Moffitt, Director
Elizabeth City Office - 1367 US 17 South - Elizabeth City, NC 27909 . Phone 252-264-3901
r,
PERMIT COMPLIANCE MONITORING REPORT
Project / Permittee Name : Albemarle Developers County : Perquimans
Permit Number: 021905A Expiration Date :Sept 14, 1999
Location : Swain Park, Little River Shs.
Division Representative : DWH
Project Representatives Present : none
Type of Approved Project Activity : Bulkhead, rip rap
Date of Inspection : Sept 20, 1999
Progress to Date : N one
Permit Condition(s) Non -Compliance : None
Corrective Action(s) Required : None
Comments : Will send permittee a courtesy letter advising them that this GP
has expired.
u
PJ