HomeMy WebLinkAbout16665_RAE, JOHN MAC_19970605A
O
CAMA AND DREDGE AND FILL xx G
GENERAL 9016665
PERMIT
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC
Applicant Name Phone Number _IZO —222
Address -
City f w State zip
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity �� /� _��� i r r - i• - ' �? ' —
PROJECT DESCRIPTION SKETCH (SCALE:.��r )
Pier (dock) length
Groin length !`
number 4 +
Bulkhead length
max. distance offshore
i
J
Basin, channel dimensions
cubic yards Y 4'
0i YU
Boat ramp dimensions �� � � p�b�°�•.: t n b LlL r-W:i f �f
Other
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
applicant's signature
i
permit officer's signature
S �7 )Sj)
issuing date expiration date
attachments
In issuing this permit the State of North Carolina certifies that r i i
this project is consistent with the North Carolina Coastal application fee �y ^ `' ( /jt ? t,/
Management Program.
....... ....... ....
........ ........ ....... .....
DAVID SIMPSON CONSTRUCTION CO. INC.
800 BROAD ST.
P. O. BOX 590
OWENTAL, NC 28571
PAY
TO THE
ORDER OF.
Y2
.�iSM
12024
66-301531
9
- v DOLLARS
0 FIRST CITIZENS,,,
01 JIM F1'stgalizen, Bonk & Trust Company
a
ov 010. NC 28515
FOR — (�� e
11500012024li- ':053100300':47lB100 79112
Is
!
PAMLICO COUNTY BUILDING INSPECTIONS BAYBORO, N.C.
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT EPNtt__^_.._
+
I hereby certify that I own property adjacent'to
JOHN Mac RAE ' a on
`
• '; Name of landowner proposing development
CAMP CREEK
BONNIE' S GUT i ORIENTAL
near
r '; + • , +: • • ,�+
body of water community
'Lodi of
Subdivision, if applicable
w`
Tax Parcel 0 J082-44 off SR 1317' Complot4,.
�
description of how to locate this property:_
501 BLACKWELL PT . R•D .
• The proposed pros j ect , a SEE ATTACHED DRAWING and the
location has been described to me as shown in the drowlxS
F
below and I have no objaotiona to the proposal.
FOR A PIER, CHECK ONE OF THE. FOLLOWING,
"
r
I r
I wish to waive the 15' minimum setback from my
t M ,
riparian accebe.
T setback
DONOT dish to waive the 15' minimum
' requirement
• tir �Ic �K �K �K �K * �K �K �Ic �Ic sic �K �K * * �K * �K aK �K � Ik �k �k:K � �Ic �K �K �k * �K �K �K �i i� �K yc
1 • �,1
. �►r � ,r,r rr rr lr yr w +,r ,r w ,� ,rc �Ic �Ic
RECONSTRUCT HURRICANE DAMAGED DOCK b.' X 48' ALONG NEW BULKHEAD
INSTALL 112' +/-- BULKHEAD, INSTALL 30' ♦1- STONE REVETMENT, DREDGE
PART OF CANAL TO ORIGINAL 5.5' depth. -for bulkhead backfill, 4 boat
lift pilings
tj
';
Printed Name `� r.` .
�•-1lid-i
Signature -
j'
n
PAMLICO COUNTY BUILDING INSPECTIONS BAYBORO, N.C.
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT EPNit�_____
I hereby certify that I own property adjacent'to
JOHN.Mac RAF.
'a on
Name of landowner proposing development
CAMP CREEK &
BONNIE' S GUT i near ORIENTAL
body of water community
^Loot of
Subdivision, if applicable
Tax Parcel # J082-44 off SR 1317' Complete
description of how to locate this property:
501 BLACKWELL PT.RD.
The proposed project, a SEE ATTACHED DRAWING and the
location has been described to me as shown in the drawing`
below and I have no objections to the proposal.
FOR A PIER, CHECK ONE OF THE,FOLLOWING: ,
I wish to waive the 15' minimum setback from my
ripari access.
_ I DONOT wish to waive the 15' minimum setback
requirement.'
• yr,r�,r,r,r,r,r,rW+r,r,rwrr,�,�yc�lc�ic�K�K�KyK**�K****�K�K***%K�k�K�lc*�k�k�K�K�K�K�K�K�K�K�K�K�K�Ic�K�K
RECONSTRUCT HURRICANE DAMAGED DOCK 6.' X 48' ALONG NEW BULKHEAD
INSTALL 112' ♦/- BULKHEAD, INSTALL 30' ♦/- STONE REVETMENT, DREDGE
PART OF CANAL TO ORIGINAL 5.5' depth -for bulkhead backfill, 4 boat
lift pilings
Printed Name
Signature
Date 612,9A: %
V.
V
{ 7 40 r
FROM MACRAE BELL ASSOC. 04.07.1997 13:35
Fri �< NJr-r� G
OF
j
a(lcw°��
. c
` p s lk ,emu
S�S�G��P t.st
+ -
A, n c ;' `
V�m►.<avE
% HRvy 41x 45' 00G
�! (4) P1668 '4
I�Xt ral, g'KQp�PoC�"1
�1t(�T Doc
P. 1
in
r