Loading...
HomeMy WebLinkAbout16971_PINE KNOLL TOWNES PHASE II_19961209CAMA AND DREDGE AND FILL GENERAL �l PERMIT as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC iV �7 Applicant Name I i, Phone Number Address i ` ev'— _ City wol: .`rr:r ' 6yl'c, Project Location (County,,State Road, Water Bod Type of Project Activity PROJECT DESCRIPTION I SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. (SCALE: I permit officer's signature issuing date expiration date attachments Sf application fee r J J0� CAMA October 20, 1999 Mr. Tom Grady Pine Knoll Towne II P.O. Box 2822 Atlantic Beach, NC 28512 Dear Mr. Grady: This letter confirms our meeting of October 19, 1999 onsite property at Pine Knoll Towne II off NC 58, adjacent to the Atlantic Ocean, in Pine Knoll Shores, Carteret County. The purpose of my site visit was to address the extent of damage to the existing sandbags which protect the townhomes and the requirements for repair/replacement of the bags. From my site inspection, it appears that Hurricane Floyd caused severe damage to the existing sandbags. As you recall, these sandbags were permitted as temporary erosion control structures and may remain in place for up to five years after the permitted date of December 9, 1999. Our rules currently allow for existing sandbag structures to be maintained provided that the permitted dimensions are not exceeded. Based on General Permit #016971-C, approximately 220' of sandbags were permitted and subsequently installed along the erosion escarpment in front of the townhomes. Therefore, as long as the sandbags are tan in color and their repair/replacement is within the originally permitted dimensions, you are hereby authorized to repair the sandbag structure. Again, the repaired sandbags may remain in place for up to five years after the date of original approval unless of course they are covered with sand and natural vegetation. If you have any questions, please don't hesitate to contact me at 252-808-2808. Sincerely, v M. Ted Tyndall District Manager cc: Roy Brownlow, PKS Inspections Charles Jones, Assistant Director North Carolina Department of Environment and Natural Resources James B. Hunt Jr., Governor • Wayne McDevitt, Secretary Division of Coastal Management Donna D. Moffitt, Director Morehead City Office . 151-B Hwy. 24 / Hestron Plaza 11 Morehead City, NC 28557 • Phone 252-808-2808 T D EURE CONSTRUCTION TEL:9197284192 Dec 06,96 11:25 No.001 P.01 . • •••«..-.e�'+?�.aP7FaG?:Y'+:Y•sd`�`Pti "...r:YOPP6:�.'i1N440 �Ellml,?teAttpi�i': 091140VAL NOTICE TO WHOM IT MAY CONCERN rM t4 eot a e e Mni in my behai Jn obtair}ing a LAMA ©anersk Perrlrrt 10 P190e Sandbags ee r #ftm p Y lofton abntrol strucure trf� front t of My property h4v$ reed tho apsolflcatlona In tdA NCAC 1700 find understand ihtt►t rd sae may fora lin in place far up ta,,,,, y®are after the dot* of paitytlt aPOMV64< f itrtwof0tand thpt 1 wilt bs relrparrelble for rernoving the sandbag Within 30 daye Si VO *6d of stony time that they are determined by DCM VAN Of Re, agent to be or removal of the structure. 1411alga bO respQf►#lbre for rernovlfg iRy-80I "i tandbsgs during the period they are &utnGrizec# tc tea in plane. t WSO Umderstondl that the'14MOV41 of the eendbsga ohsli not be mqulrad If at the speolttad date for removal that' 400'4+et+elr 0ned by 'DCM Staff to be covered by dune$ w1lb vegetritiort Sufllolent to be°ean I natural. AUTHp tT.,l 131C3NATUai:�harr� !