Loading...
HomeMy WebLinkAboutGeneral Permits (5400)Applicant Name Address C I C City < 6 _12 -01 n CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. L — H C 41 % P Phone Number ! — S— State Zip Project Locatio (County, Stalp Road,, Water Body etc.) _ C' mil^ 16 U t % 4-1 Type and Dimensions of Project v I 0 <u ' fit.. The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. L119)�- 40 ::-76 0&' 6'� _0 r T A -e L�- Gf t ,0-1 ' C� (_P s s 3 --6 - 96 This certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. SKETCH (SCALE: ) rc, kr Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. Mant'satu`r'e � r CAMA Official's signature q— �-9) Issuing date %' W _ 17 Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director • 1 X� �� � lab ffl�!WA IDEHNR DATE: .y_ 9 , 1997 Attached is a Certificate of Exemption From Requiring a CAMA Permit. In order to validate this permit, please sign all three (3) copies as indicated. Retain the yellow copy for your files and return the blue and green signed copies to us in the enclosed, self-addressed envelope. Your early attention to this matter would be appreciated. Sincerely, Field Representative /dh Enclosures AFAW Hestron Plaza II, 151 B, Highway 24, Morehead City NC 28557 IL 4 C An Equal Opportunity / Affirmative Action Employer Voice 919-808-2808 FAX 919-247-3330 Courier 11-12- 09 50% recycled / 10% post -consumer paper V YOUTH DEV/NCSU Fax:919-515-7812 Apr f' North Carolina Cooperative Ex#en'sion Service NORTH CAROLLNA STATE UNIVERS= ♦ Ly M.'',,,. COLLFGE OF AMCULTURE & LIFE SCIENCES Departuamt of 4-H Youth DmIopment • liox 7606 e, $,high, N_ C 2769576W a Tel: (919) 515-52A2 FAX (9M 515 78I2 April 7, 1997 Mr. Charles Pigott, Field Representative Coastal Area Management Act (CAMA) Division of Coastal Management 151-B Highway 24 Morehead City, NC 28657 SUBJECT: Certificate of Exempt on Mitchell 4-H Center Dear Charles, We are in the bid solicitation process for rebuilding the pier at Mitchell 4-14 Center in Swansboro, NC. Please refer to your Certificate of Exemption dated 8- 6-96. We want to ensure that the certificate is still valid (Expiration date states 7-31-97) and that it is valid for the plans currently inplace, I am faxing you a copy of your certificate and a drawing whlich indicates the pier as currently advertised. Please txote that the length of the pier is longer than your sketch reflected, last August. I'm not sure how this discrepancy occurred, since we are basically rebuilding the pier over the top of the one lost during Hurricane Bertha. The biggest difference is the aide you have labeled as 50 feet. Our plans show that side being 154 feet. We plan to construct the shaded area initially and the portion labeled "phase 2" if funds allow. The bulkhead portion will be constructed at the same time and should be no longer than the 95 foot distance noted on your permit. Please call me at (919) 515-W2 or 515-7812 (fag) to verify drat the permit is still valid and will cover the pier as we plan to construct. Sincerely r Larry Hancock 4-H Specialist BmMoymew and pogram oppmuWbm we affciod to sll poople trgard1c% of r4m color, na iorW origin, mi. ago of hm(ir$p. North Carolina State Un imvdV, Nonh ChroRw A&T State University, U.S_ De pwu=t of Agricul uro, and local guvexrmtents eooperadog. The spokwtt es 1.;� ption blot (1) the ap- Issuing 4a1e plicam ham fMd NIII AGitti d ihIsa euetM- tioo, And (7) a wftt M t#1l Alflod ffom sd*Qnt - I - Wisdowt+ars Oltttt `x y a to tho EXPIM110A data p Wsed WGI>1S� u AttAchmont., 15 North Carolina AdministratIve Coda 7K .0203 AH YOUTH DEV/NCSU Fax:919-515-7812 Apr 8 '97 12:Ce, D 1 N � EKN>C�18�aQTK� 17iM4PT 31 34FaT8299 P. 02 P.01 POSt'li' Fax No$ t !�f I. f t .CLXAtED BY TOKED BY OF DATE oAYG ISS t1 vs