Loading...
HomeMy WebLinkAbout17086_MUENDEL, EDMUND_19970328O CAMA AND DREDGE AND FILL GENERAL PERM I T as authorized by the State of North Carolina Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ©%11• / / Or Applicant Name d%'�urr►�/ ��'""����F� Phone Number %©-i— 9 L6S ' Address 0 2u % City Project Location (County, State Road, Water Body, etc Type of Project Activity r,. State _ 4 zip v / 9 PROJECT DESCRIPTION SKETCH (SCALE: Pier (dock) length Groin length number I__ `1{•�,?n f �% Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions _l ,' !i,�'` Other F ""-T7- , f i This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. attachments applicant's signature J permit officer's signature j7 9'-?5 fi7 issuing date expiration date In issuing this permit the State of North Carolina certifies that di this project is consistent with the North Carolina Coastal application fee Management Program. _... EDMUND F. MUENDEL OR VICKI DEBASE MUENDEL 053-34-9959 235-74-0808 3267 GRADY LANE 703-494-5554 LAKE RID VA 22192 Pay to the Order of [� 0uI'v 1 IMU31 SunTrust Bank, Atlanta Atlanta, Georgia For CRO O/7G,,—G �^ I:06L000LO1,11: BBL3557470114 3647 19 / A 3647 64-101610 $ ,S'p. 0 v 1 Dollars el./14/1997 12:17 9197268098 SPl7ONERS CREEK PAGE 02 t w I.Z.Je I •"/O-A4 —rl k.AII LI•I1 / Ir1 r'L_'-A_K /VJ.Z yl / / f _'�IeJ M. 1 January 14, 1997 Mr. John L. Fetzer Spooner's Creek Yacht Harbor 100 Lands End Rd, Morehead City, NC 28557 FAX: 919-726-9098 Dear Mr. Fetzer My wife Vicki and 1 plan to build a bulkhead acrom our property, Lot 35, South Spooaer's Dr.. which is adjacent to your yacht harbor. To do this we need a current C.A.M.A,. a permit. Before the pern it can be iasuod. C.A.M.A. requires that we notify our riparian neighbors and provide them the opportunity to comment. We intend to tie in our bulkhead with the bulkhead on Lot 8 (currently being constructed) and run it cast to tie ime the ooncrete bulkhead that fortes the west boundary of spoanees Creak Yacht Harbor. After receipt of this letter, you have 10 days to respond back to the Division of Coastal Management (C.A.M.A.), Heston Plaza 02, 151B, Highway 24, Morehead City, NC 28557. 919-808-2808, with any objections, If C.A.M.A_ does not hear from you wittun 10 days, they will assume you have no objections. if there, are no objections, please sigh and date the statement below and return it to me by FAX (703-917.7475)_ if you have any questions, please call or contact me at 703-917-1349 or FAX 705-917-7475 Thank you for your prompt attention in this matter since we are trying to start work immediately following the construction of the bulkhead on Lot tt8_ Sincerely, $d tiuC�del 3267 Grady Lane Lake Ridge, VA 22192 I have no objections to the construction of a bulkhead on lot 35, South Spooner's Dnve. Y ? John Fetzer Dot ILL 7JA2 1 1997 ` i� G Jaeuary 14, 199'7 Mr. do Mrs. Robert Mark Jr. Owners; Lot 8 South Spooner's Dr. Morehead City, NC 28557 Dear Mr. do Mrs. Monk My wife VicE =11 plaa co build a bu41=16 acmes our prOPG*. Lot 35, Sout:, Spooner's Dr. To do this we need • can nt C.A.M.A,.Apermit_ Before rhis permit c" be laaued, C.A_M.A. Mquires that we notify our riparian Neighbors and provide them the opportunity to comment. we intend to tie in our bultbead with the bulldsedd you arc having Mr. Chuck Beasetw construct on your property this week. The bulkhead will run east and tie into the concrete bulkhead that forms the west boundary of Spooner's Creek Yacht Harbor. After rcccipt of this later, you have 10 days to respond back to the Division of Coastal Management (C.A.MA-), Heston Plaza 02, 151B, Highway 24, Morehead City, NC 28557, 919-808-2808, with any objccdons. if C.AM.A. dots not hear from you within 10 days, they will assume you have no objections. If there am no objections, please sign and date the statement below and return it to Me by FAX, if possible (703-917-7475). If you lave any questions. please call or contact me at 703-917-7349 or FAX 703-917.7475 Thank you for your prompt attention in this matter since we am trying to start work immediately following the construction of your bulkhead. Looking forward to meeting both of you and your family in the near future, SinCtmly, Ed Mveadel 3267 Grady Lane Lake Fridge, VA 22192 I o objections to the construction of a bulkhead on lot 35, South Spooner's Drive. R 8: Sue em 14ionlc to Fr P-IN JAN 2 1 1097 TOTAL P.01 Oro E o4i ,V!`o1'' J � � N lip w IL aril , N Sas�"lin Ix fir♦ ya �iZoo q 43- . SL 5-d 09IL L L 6 COL cOMA H1L IH1 VUrJA HIV 1 : l L661-5r—r.�